首页
登录
职称英语
SummaryListen to the passage. For questions 26—30, complete the notes using no
SummaryListen to the passage. For questions 26—30, complete the notes using no
游客
2024-08-14
38
管理
问题
Summary
Listen to the passage. For questions 26—30, complete the notes using no more than three words for each blank.
The best-seller wooden toy among our products is【D6】______, which is designed for 【D7】______. Our output per month is 4,000 items, and the average【D8】______time per box is 5 minutes. We have 1000 boxes in storage, and the next dispatch will come on November third. Currently , we have 20 drivers and 40 staff working on the【D9】______. All staff do【D10】______ work. [br] 【D9】
Summary
Listen to the passage. For questions 26—30, complete the notes using no more than three words for each blank.
Well, the next product I want to move onto is children’s toys. In this part of building, we manufacture several different wooden toys. But the greatest demand is for our train sets. These are made up of ten pieces and each piece is a different color. It’s a toy for the under-fives and it sells well. We manufacture 1,000 of these every week. That’s a total production of 4,000 a month. Over here, we put all the toys into boxes. Because this is a product for young children, everything has to be very carefully checked beforehand. So the average time it takes for packaging is 5 minutes per box.
We supply a lot of large department stores throughout the country. Orders are not constant, but go up and down depending on what time of the year it is. So we try to keep about 1,000 boxes in storage at any one time. That’s the number that we have at the moment anyway. As I said, we deliver our children’s toys to stores around the country. Outside, we’re just loading up the lorries which are going to set off tomorrow. That’s November third. Then there won’t be another dispatch until 10th, November.
We have 20 drivers working in this area at the moment and we have 40 staff working on the production lines. As we need to work at night as well as during the day, everyone does some kind of shift work, though the hours vary according to area of production that they’re working.
选项
答案
production lines
解析
(根据录音中的“we have 40 staff working on the production lines”可知,生产线上的员工一共有40名。故填production lines,表示“生产线”。)
转载请注明原文地址:http://tihaiku.com/zcyy/3719491.html
相关试题推荐
Everyoneknewthat______theprojectwouldbecompletedandwe’dallhavetoretu
SummaryListentothepassage.Forquestions26—30,completethenotesusingno
SummaryListentothepassage.Forquestions26—30,completethenotesusingno
SummaryListentothepassage.Forquestions26—30,completethenotesusingno
DictationListentothepassage.Forquestions21—25,fillintheblankswithth
DictationListentothepassage.Forquestions21—25,fillintheblankswithth
DictationListentothepassage.Forquestions21—25,fillintheblankswithth
SummaryListentothepassage.Forquestions26—30,completethenotesusingno
DictationListentothepassage.Forquestions21—25,fillintheblankswithth
DictationListentothepassage.Forquestions21—25,fillintheblankswithth
随机试题
[originaltext]Somecountriesmayhaveoneuniformfishinglawcoveringthe
_____Ilikeeconomics,Ilikesociologymuchbetter.[2003]A、AsmuchasB、Somuc
[originaltext]W:MaybeweshouldtakeFrontStreetthismorning.Theradioanno
A.热灼伤 B.血管栓塞 C.血管扩张 D.酸性电解产物积聚 E.碱性电
贷款期限通常分为提款期、宽限期和还款期。
客户按需求的物业类型进行分类,可分为( )等。A、住宅客户 B、写字楼客
下列关于素质教育的表述中,正确的是( )。A.素质教育包括社会实践 B.
下列税种能够自动适应经济发展周期变化,发挥“内在稳定器”作用的是()。A.增值税
根据《水电建设工程质量管理暂行办法》(电水农[1997]220号),水电工程重
按照计价方式选择合同类型,当发包工程的内容和工程量一时尚不能明确、具体地予以规定
最新回复
(
0
)