首页
登录
职称英语
Estimates were obtained from three contractors on the costs of covering the
Estimates were obtained from three contractors on the costs of covering the
游客
2024-07-04
51
管理
问题
Estimates were obtained from three contractors on the costs of covering the offices and class-rooms. All these three were in the $20,000 to $25,000 range. The work would take about three weeks.
Because the central unit would be installed on the roof, some noise problems might occur during a four-or five-day period. And this work could be started from this weekend, and the over-time labor costs of about $1,500 have been included in the estimates.
Additional Installation
Because a larger installation, including a more powerful central unit, would be necessary to handle the halls and stairways, an additional $6,000 would be required for the equipment. If this additional work were delayed until a later time, a new central unit would be required along with changes in the pipe way.
Subject: (46)______ Costs for East Hall
Office and Classroom Installation:
1. Covering area: seven offices and two (47)______
2. Possible problem: some (48)______ might occur during a four- or five-day period
Additional Installation:
1. Budget: $6,000
2. A more powerful (49)______ is needed to handle the halls and stairways
3. Additional installation postponement will result in changes in (50)______ [br]
选项
答案
Air-conditioning Installation
解析
转载请注明原文地址:http://tihaiku.com/zcyy/3662459.html
相关试题推荐
Estimateswereobtainedfromthreecontractorsonthecostsofcoveringthe
Estimateswereobtainedfromthreecontractorsonthecostsofcoveringthe
Estimateswereobtainedfromthreecontractorsonthecostsofcoveringthe
(see)______fromspace,ourearth,withwatercovering70%ofitssurface,appear
Seenfromspace,ourearth,withwatercovering70%ofitssurface,appearsasa“bl
Biddingdocumentscanbeobtainedatthefollowingaddressuponreceiptofanon
FireInstructionThepersondiscoveringafire
FireInstructionThepersondiscoveringafire
FireInstructionThepersondiscoveringafire
FireInstructionThepersondiscoveringafire
随机试题
[img]ct_epem_epelisv_00791(20097)[/img][br][originaltext]Heputhisdictionar
TodaythewriterHansChristianAndersenisknownasawriterofstoriesfor
Solveeachofthefollowingsystemsofequationsforxandy.(a)x+y=24x-y=
水泥混凝土试件拆模后应立即放入温度为20℃±2℃、相对湿度为95%以上的标准养护
旅游饭店按照其规模大小,可以分为()。A.商务型饭店 B.小型饭店 C.中型
A.两者均不是 B.压疮 C.两者均是 D.脊髓损伤脊柱骨折的严重并发症是
新病舌痿软而干红,属A.气虚血瘀 B.风痰阻络 C.肝肾阴亏 D.热灼津伤
板蓝根可用于治疗A.溃疡病B.急性肠炎C.急性传染性肝炎D.急性胰腺炎E.糖尿病
缺铁性贫血的临床表现少见的是A.原发病的临床表现 B.皮肤苍白、活动后气短
()是保证项目前期策划工作质量的基础。A.成果质量评审制 B.成果质量评价标
最新回复
(
0
)