首页
登录
职称英语
Years before President Bill Clinton came to Washington with his campaign ple
Years before President Bill Clinton came to Washington with his campaign ple
游客
2024-06-07
36
管理
问题
Years before President Bill Clinton came to Washington with his campaign pledge to spend an additional $20,000 million annually on America’s infrastructure "to develop the world’s best communication, transportation, and environmental systems," economists and others were talking about the need to spend more on public works. Their debate has been almost entirely about one question: how much more? Usually overlooked in these in discussions is the real infrastructure dilemma of the 21st century--not how much to spend but how to decide what to build and where to build it.
For several reasons, the old ways of deciding these matters simply do not work anymore. Americans today are far more skeptical about the value of new roads, bridges, and sewage treatment plants especially when they are located in their own. backyards. Their faith that decisions about public works can be safely left in the hands of public officials, engineers, and other technical experts is gone.
Reflecting in 1985 upon the final demise of West way, the proposed highway along Manhattan’s West Side that had been held up for 30 years, Senator Daniel Patrick Moynihan of New York wrote, "There is a kind of stasis that is beginning to settle into our public life. We cannot reach decisions. Central park could not conceivably be built today as it was when there was enough power in government to make the decision. We don’t have that capacity."
The persistence of the public works pork barrel (地方建设经费)—funding blatantly political projects--has also contributed to public skepticism. In the same year that Moynihan decried the death of Westway, local politicians the $1,800 million Tennessee Tombigbee Waterway, recently described by the Atlanta Journal Constitution as "a broken promise." A classic pork barrel project, the waterway carries only one-tenth the commercial barge traffic that had been projected. [br] Of today’s public works, the Americans suspect______.
选项
答案
the value and pork barrel
解析
概括题。本题需要我们自己概括。将第二段第二句和第三段第—句进行概括、总结,得知人们主要担心两件事:①the value ②pork barrel
转载请注明原文地址:http://tihaiku.com/zcyy/3623041.html
相关试题推荐
[audioFiles]audio_eusm_0214(20106)[/audioFiles]A、HeprovidedWashingtonwitha
YearsbeforePresidentBillClintoncametoWashingtonwithhiscampaignple
YearsbeforePresidentBillClintoncametoWashingtonwithhiscampaignple
[audioFiles]audio_eusm_0206(20106)[/audioFiles]A、Ananalysisofearlypresident
PresidentClintonlatertodayjoins【B1】______presidentsFord,CarterandBu
PresidentClintonlatertodayjoins【B1】______presidentsFord,CarterandBu
PresidentClintonlatertodayjoins【B1】______presidentsFord,CarterandBu
PresidentClintonlatertodayjoins【B1】______presidentsFord,CarterandBu
PresidentClintonlatertodayjoins【B1】______presidentsFord,CarterandBu
PresidentClintonlatertodayjoins【B1】______presidentsFord,CarterandBu
随机试题
[originaltext]Hello,ladiesandgentlemen.Welcometotoday’slecture.Firs
[originaltext]Anewstudyhasfoundevidenceofaggressivebehaviorinchil
Ifthereisanysinglefactorthatmakesforsuccessinliving,itistheab
下列不是卫生行政机关职责的是[]A.组织现场监督检测、采样工作 B.开展卫生法
李某以10000元购买某股票,预计未来1年内不会再发放股利,且未来1年后市值达到
较大剂量阿司匹林引起的不良反应最为常见的是A.胃肠道反应 B.凝血障碍 C.
以下不属于因果关系的特点的是()。A.普遍必然性 B.共存性 C.复杂多样性
商业银行风险管理的主要策略中,风险转移的方式包括()。A.保险转移
企业发生的下列支出中,在计算企业所得税应纳税所得额时准予扣除的是()。A.缴纳的
工程项目进度计划的资源优化是在现有资源条件下寻求()。A.最短工期条件下的资源
最新回复
(
0
)