首页
登录
职称英语
[originaltext] The national weather map shows a high pressure area all along
[originaltext] The national weather map shows a high pressure area all along
游客
2024-06-06
54
管理
问题
The national weather map shows a high pressure area all along the eastern coastline which brought them very pleasant, sunny weather from New York to Florida. But showers and thunderstorms are occurring from the Ohio River all the way south to the Gulf coast, depositing heavy amounts of rain over the southern states.
By far the worst of the storms has occurred in and around Texas. Some Texas stations have reported up to fifteen inches of rain in a twenty-four-hour period with high winds and thunderstorms. Two tornadoes were reported along the Gulf coast of Texas, but we have no confirmation of damages or injury.
Heavy amounts of snow were reported in the Rock Mountain region with record cold temperatures in Denver and Boulder. As much as a foot of snow has fallen in some of the mountain stations.
In contrast, temperatures in Arizona and the desert Southwest went over the one-hundred-degree mark again today under bright, sunny skies.
选项
A、Two inches.
B、Fifteen inches.
C、Twenty-four inches.
D、One foot.
答案
B
解析
转载请注明原文地址:http://tihaiku.com/zcyy/3621959.html
相关试题推荐
[originaltext]Therearetwokindsofmemory:short-termandlongterm.Infor
[originaltext]Therearetwokindsofmemory:short-termandlongterm.Infor
[originaltext]HenrySmithtaughtscienceattheCitySchool.Oncehewentt
[originaltext]ProfessorWangisaphysicsteacherinBeijing.Onceshewas
[originaltext]ProfessorWangisaphysicsteacherinBeijing.Onceshewas
[originaltext]M:Canyoutellmeabouttheuniversityshuttlebussystem?This
[originaltext]Ifwinningiseverything,Britishscientistshavesomeadvice
[originaltext]Ifwinningiseverything,Britishscientistshavesomeadvice
[originaltext]Ifwinningiseverything,Britishscientistshavesomeadvice
[originaltext]Scientistssaythatmostdoctorsandpatientsalreadyknowwh
随机试题
[img]2014m3s/ct_etoefm_etoefspeaka_0084_20138[/img][originaltext]Somestudents
Acreditcardthatonlyworkswhenithearsitsowner’svoicehasbeendevel
ThecityfinallywonapprovalforalimitedspeedcameraprograminJuneaft
A. B. C. D.
建设工程项目实施阶段策划的主要任务是确定()。A、项目建设的总目标 B、如
灭火器铭牌包括以下内容()A.危险等级 B.灭火器的名称、型号和灭火剂类型
(2017年真题)下列关于受托支付的说法中,错误的是()。A.从欧美银行业
根据我国有关规定,项目法人应在()被批准后正式成立。 A.项目建议书B.可
为了合理地划分施工段,应遵循的原则包括()。A.施工段的界限与结构界限无关,但应
根据《建设项目环境影响评价技术导则总纲》(HJ2.1-2016),环境影响评价技
最新回复
(
0
)