首页
登录
职称英语
[originaltext]W: Jean really lost her temper in Dr. Brown’s class this morning.
[originaltext]W: Jean really lost her temper in Dr. Brown’s class this morning.
游客
2024-05-22
41
管理
问题
W: Jean really lost her temper in Dr. Brown’s class this morning. We were all shocked by her aggressiveness.
M: Oh, did she? But I think her frankness is really something to be appreciated.
Q: What does the man mean?
M: Did you talk with our new manager? He is looking for you these days. I think he has something important.
W: I have been out of town for 2 days. And until this morning I come back.
Q: What does the woman mean?
选项
A、She has been at home.
B、The new manager was not in the office.
C、She hasn’t talked with the new manager yet.
D、She didn’t want to talk with the new manager.
答案
C
解析
对话中男士问女士是否跟新经理谈过,女士回答I have been out…And until this morning I come back(我—直在外面…今天早晨才回来),由此可知,女士还没有与新经理谈过,故答案为[C]。
转载请注明原文地址:http://tihaiku.com/zcyy/3605442.html
相关试题推荐
_________thetemperaturefallingsorapidly,wecouldn’tgoonwiththeexperim
Yourfatherlikestoplaygolf;he’sreallyenthusiastic________it.A、byB、abou
Itwasreallyanunfortunatethingthatheunderwentfour______operationsinle
He________somuchworkthathecouldn’treallydoitefficiently.A、putonB、tu
Youshould__________yourselffromlosingtemperatthekid’sbehaviorasbedo
Manyuniversitycoursesarenotreally______totheneedsofstudentsortheir
Hisbodytemperaturehasbeen______for3days,thehighestpointreaching40.5
[originaltext]W:Areyoureallygoingtoquityourjob?M:Well...I’mnotsure.
[originaltext]W:Areyoureallygoingtoquityourjob?M:Well...I’mnotsure.
[originaltext]W:Youcaneithergowithmeoryoucanstayhereattheapartmen
随机试题
Clothesplayacriticalpartintheconclusionswereachbyprovidingclues
Womenarequiteoftencompetentdrivers,buttheyareveryseldomconsisten
预制装配式钢筋混凝土楼板根据外观不同可分为()等几种类型。A.实心平板 B.
优先股的持有者有权()。A.监督用来购买和赎回债务的偿债资金 B.在所有股
安全色与对比色的相间条纹为()。A.等宽条纹,斜率约30° B.等宽条纹
患者,女性,32岁,患风湿性心脏病二尖瓣狭窄10年,近半年来上二层楼即感心悸气短
下列关于可赎回债券的说法,错误的是()。A、约定的价格称为赎回价格,包括面值和
根据测绘法,下列关于测绘项目的说法中,错误的是()。A:测绘单位必须以自己的设备
共用题干 SavingaCity'sPublicArtAvoiding
下列关于建设工程业主方项目管理的目标和任务的表述中正确的有( )。A.进度目标
最新回复
(
0
)