首页
登录
职称英语
[originaltext] (32)The world’s first completely automatic railway has been b
[originaltext] (32)The world’s first completely automatic railway has been b
游客
2024-05-15
38
管理
问题
(32)The world’s first completely automatic railway has been built under the busy streets of London. The railway is called the Victoria Line, and it is part of the complete London underground railway. The new Victoria Line was opened in 1969. This new line was very different from the others. The stations on the other lines need a lot of workers to sell tickets, and to check and to collect them when people leave the trains. This is all different on the Victoria Line. (33)Here a machine checks and collects the tickets, and there are no workers on the platforms. On the train, there is only one worker. (34)If necessary, this man can drive the train. But usually he just starts it; it runs and stops by itself. The trains are controlled by electrical signals which are sent by the so-called "command spots." The command spots are the same distance apart. Each sends a certain signal. The train always moves at the speed that the command spots allow. If the command spot sends no signals, the train will stop. Most of the control work is done by computers. The computers also fix the train’s speeds, and send the signals to the command spots. (35)Other machines make sure that the trains are always a safe distance apart. One train may stay too long at a station; the other trains will then automatically move slower. So there is no danger of accidents on the line.
32. What happened to the London underground railway over four decades ago?
33. Who checks and collects the tickets on the Victoria Line?
34. What is the task of the one worker on the Victoria Line train?
35. What will happen on the line if each train moves at its own speed?
选项
A、To drive the train after it is started automatically.
B、To start the train and to drive it when necessary.
C、To take care of the passengers on the train.
D、To send commanding signals to the command spot.
答案
B
解析
细节推断题。短文中间部分提到,在“维多利亚线”上,每列火车上只有一位工作人员,通常只负责让火车启动,虽然他可以操纵火车,但一般情况下,火车都是自动运行的。由此可知,在“维多利亚线”上,唯一的工作人员的职责是让火车启动并在需要时进行驾驶。
转载请注明原文地址:http://tihaiku.com/zcyy/3598904.html
相关试题推荐
[originaltext]Facialexpressionscarrymeaningthatisdeterminedbysituat
[originaltext]Facialexpressionscarrymeaningthatisdeterminedbysituat
[originaltext]W:DoestheMotorVoterLawcoverallthestates?M:No.W:Which
[originaltext]M:MissHanson,thankyouforsendingmethisnote.I’msorryto
[originaltext]M:MissHanson,thankyouforsendingmethisnote.I’msorryto
[originaltext]M:MissHanson,thankyouforsendingmethisnote.I’msorryto
[originaltext]M:MissHanson,thankyouforsendingmethisnote.I’msorryto
[originaltext]M:MissHanson,thankyouforsendingmethisnote.I’msorryto
[originaltext]M:MissHanson,thankyouforsendingmethisnote.I’msorryto
[originaltext]M:MissHanson,thankyouforsendingmethisnote.I’msorryto
随机试题
Onceyourecognizetheincessantsingingofthetreefrogs,whichisthevoiceo
Theartofpleasingisaverynecessaryonetopossess;butaverydifficult
[originaltext]W:Sitdown,please,Mr.BlackIhopeyouenjoyedyourjourney.M
[originaltext]LudwigBeethovenwasborninBonn,intheRhineland.Hisfath
债券按利率是否固定分类,可以分为( )。A.公募债和私募债 B.固定利率债券
小儿缺铁性贫血的原因是()。A.摄入不足 B.铁吸收不良 C.慢性失血
2008年,某省两个最大城市初中毕业生分别为13.81,11.76万人,其中
商业银行的内部控制目标包括()。 A.确保国家法律规定和商业银行内部规
《中华人民共和国防沙治沙法》,在沙化土地范围内从事开发建设活动,必须提交环评报告
企业按2/15.n/30的条件购人货物30万元。如果该企业在第10天付款,则企业
最新回复
(
0
)