首页
登录
职称英语
[originaltext] A design for a remotely-controlled fire engine could make lon
[originaltext] A design for a remotely-controlled fire engine could make lon
游客
2024-03-02
33
管理
问题
A design for a remotely-controlled fire engine could make long road or rail tunnels safer. It is the brainchild of an Italian fire safety engineer, who claims that his invention — dubbed Robogat — could have cut the death toll in the disastrous Mont Blanc tunnel fire in March 1999, which killed 41 people. Most of the people died within 15 minutes of smoke first being detected. Quick action is needed when fire breaks out in a tunnel. Robogat can travel at about 50 kilometers per hour. The Mont Blanc fire was five kilometers from the French end of the tunnel, so a machine could have got there in about 6 minutes.
The robot bas been designed and patented by Domenico Piatti of the Naples fire department. It runs on a monorail suspended from the roof of the tunnel. When the Robogat reaches a fire, it plugs into a water pipe running along the tunnel, and directs its hoses at the base of the fire. It is capable of pumping 3,000 liters of high-pressure water per minute—about the same rate as that from an airport fire tender. Normal fire engines deliver 500 liters per minute.
选项
A、Detect the smoke quickly.
B、Take quick action.
C、Close the tunnel.
D、Install a Robogat.
答案
B
解析
根据文中“Quick action is needed when fire breaks out in a tunnel.”可以判断此题答案为B
转载请注明原文地址:http://tihaiku.com/zcyy/3499917.html
相关试题推荐
[originaltext]Withtheintroductionoftheradio,newspaperpublisherswond
[originaltext]Withtheintroductionoftheradio,newspaperpublisherswond
[originaltext]WhenMidoriwastwoyearsold,sheoftenclimbedontothepia
[originaltext]WhenMidoriwastwoyearsold,sheoftenclimbedontothepia
[originaltext]ThefirstrealityTVshowintheworldwascalledExpedition
[originaltext]ThefirstrealityTVshowintheworldwascalledExpedition
[originaltext]TherearetwomainformsofteachinginNottinghamUniversity
[originaltext]W:Hi,Larry,areyouwaitingtoseeProfessorJamison,too?M:Y
[originaltext]W:Hi,Larry,areyouwaitingtoseeProfessorJamison,too?M:Y
[originaltext]W:Hi,Larry,areyouwaitingtoseeProfessorJamison,too?M:Y
随机试题
______arenowgatheredintheMiamiarea.A、HispanicsB、Mexican-AmericansC、Puert
PASSAGEONE[br]Whydidtheauthor’sheartpoundwhenheclutchedhisdime?Hec
SherlockHolmesisafictionalcharactercreatedbyBritishauthorandphysic
TheBeautyAdvantage[A]Mostofushaveheardthestory
按照剩余股利政策,假定某公司的最佳资本结构是权益资金60%,债务资金40%,明年
建设工程项目总进度目标的控制是()项目管理的任务。A、施工方 B、业主方
下列不属于集中归档优点的是()A.可以避免绩效管理资料的重复和浪费 B.需要
综合计算工时工作制通常适用于()。A.工作职责范围和工作条件不受标准工作时
(2020年真题)根据证券法律制度的规定,证券公司实施的下列行为中,属于合法行为
业主确定的工程项目设计变更工作流程,属于工作流程组织中的()。A.管理工作
最新回复
(
0
)