首页
登录
职称英语
The most pressing nuclear energy issue is the disposal of nuclear waste. Eve
The most pressing nuclear energy issue is the disposal of nuclear waste. Eve
游客
2024-02-19
47
管理
问题
The most pressing nuclear energy issue is the disposal of nuclear waste. Even if all the reactors in existence were completely safe to operate, there would still be unsolved issue of what to do with the waste from generating electricity by means of nuclear energy. Those who claim that they feel comfortable with nuclear energy are, none the less, concerned about waste disposal methods. Seven states, including California, have put the building of nuclear plants on hold until legislators are convinced that there is a safe way to dispose of the radioactive waste from the plants.
In the meantime, pools of liquid waste and piles of solid waste from private industry and governmental bomb production grow. Since 1962, the volume of radioactive waste produced by the nuclear power industry has amounted to about 4,300 cubic meters. By the end of the twentieth century, if production continues at the same rate, there will be 40,000 cubic meters of nuclear waste.
Power plants and bomb-making are not the only sources of waste. Uranium mining and milling operations have dumped 24 million metric tons of radioactive tailing wastes at dumping sites around the nation. At places where uranium is currently milled, there is another 100 million metric tons of tailings. Uranium tailings are solid materials in the slurry (or watery mixture) of depleted ore-bearing rock, chemicals, and liquids that result from milling. Usually, the slurry is piped to holding ponds. When a uranium mill goes out of business, the ponds are left to evaporate, uncovering piles of dried tailings. Uncovered piles of tailings give off radioactive radon gas. Once in the air, the gas finds its way into the water supply and the food chain. Consequently, many nuclear experts agree that uranium mill tailings may be more dangerous than high-level radioactive wastes from reactors and bombs. [br] It can be inferred from the passage that the most dangerous by-product of uranium mining and milling is ______.
选项
A、solid mining wastes
B、the slurry in which the waste is stored
C、the radon gas that is emitted by the waste
D、the uranium that is recovered in the mining operations
答案
C
解析
第三段倒数第二、三句。选项中的内容在文中都提到了,但最危险的是:Uncovered piles of tailings give off radioactive radon gas.Once in the air,the gas rinds its way into the water supply and the food chain。显然这种放射性气体才是最有害的。文中没有明确的答案,但从危害性上讲,其他三个选项都没有直接说到它们的害处。
转载请注明原文地址:http://tihaiku.com/zcyy/3464146.html
相关试题推荐
ThelargeAmericanenergyservicecompany,Enron,failedafewyearsago.It
ThelargeAmericanenergyservicecompany,Enron,failedafewyearsago.It
[originaltext]M:Ihaveneverheardsuchafascinatinglectureonsolarenergy.
Manycountriesaretryingto______theseriousproblemscreatedbytheenergyc
Itisreportedthatanincreasingnumberofpeople______buildingmorenuclear
Letushopethat______anuclearwar,thehumanracemightstillsurvive.A、int
Manyareawareofthetremendouswasteofenergyinourenvironment,butfai
Manyareawareofthetremendouswasteofenergyinourenvironment,butfai
Manyareawareofthetremendouswasteofenergyinourenvironment,butfai
Nuclearscienceshouldbedeveloped______(有益于人民而不是伤害他们).tobenefitthepeoplera
随机试题
Theworld’sgreatestsnow-cappedpeaks,whichruninachainfromtheHimala
Mr.Whiteworksforachemicalimport-exportcompany,buthe______forthisind
[originaltext]W:Hi,Robert,youare20now,right?M:Right.W:Whatdoyouth
下列句子中,“和”字用法正确的是( )。A.他生怕我没听清和不注意,所以又嘱咐
下列选项不属于推车式灭火器的设置要求的是()。A.推车式灭火器设置在平坦
面访调查的一个主要缺点是()。A.调查对象不理解问卷 B.时间短,难以深入
慢性支气管炎是一种常见多发病,引起该疾病的原因不包括有()。A.机体抵抗力降低
某合同工程履行期间发生设计变更,导致已标价工程量清单中某分部分项工程的工程数量发
下列情形以劣药论处的是A.变质的 B.被污染的 C.标明的适应证超出规定范围
( )年12月28日,兄弟俩在法国巴黎卡普辛大道十四号大咖啡馆的地下室展开了“
最新回复
(
0
)