首页
登录
职称英语
If the Dakota Access Pipeline (输油管道) is completed, it will carry nearly half
If the Dakota Access Pipeline (输油管道) is completed, it will carry nearly half
游客
2024-01-16
56
管理
问题
If the Dakota Access Pipeline (输油管道) is completed, it will carry nearly half a million barrels of oil across four states every day. Energy Transfer Partners (ETP), a Texas-based company behind the $3.8 billion project, hopes to finish construction this year. But the Standing Rock Sioux, an American Indian tribe (部落) , is determined to stop the 1,172-mile pipeline from being built. Both sides show no signs of backing down.
The Dakota Access Pipeline was announced in 2014. A section of it will run near the Standing Rock Sioux reservation. A reservation is an area of land set aside for American Indians. The tribe says the construction threatens to destroy historical areas and ancient burial sites. They also say the pipeline could pollute their main water source, the Missouri River. In April, the Standing Rock Sioux began a protest against the project. They camped at the construction site. Since then, thousands of people, including people from American Indian tribes, have traveled to the site to join the protest.
ETP says that the pipeline will have built-in safety measures to protect against oil leaks. Workers will also monitor it remotely, and will be able to close valves (阀|) within three minutes if leaks are detected.
American Indians have been staging a nonviolent protest for months. The protest took a turn last week when police were called to keep the peace between protesters and armed security guards hired by the company.
Twenty-eight people have been arrested since then and charged with interfering with the pipeline construction. [br] According to the passage, the workers can ______in case of pipeline leaks.
选项
A、report it to the local government
B、ask people to leave the leak affected areas
C、call 911
D、close valves
答案
D
解析
细节题。定位到文章第三段第二句“Workers will also monitor it remotely,and will be able to close valves within three minutes if leaks are detected.”可知,工人们可以进行远程监控,如果发现有泄露,他们可以在3分钟之内关上阀门。A、B、C三项均未在文中提及。故选D。
转载请注明原文地址:http://tihaiku.com/zcyy/3366797.html
相关试题推荐
Thenewpowerplantisreported______withinthreeyears.A、havingbeencompleted
Newspapersarenotnearlyaspopulartodayastheywereinthepast.Therea
Newspapersarenotnearlyaspopulartodayastheywereinthepast.Therea
Insomeschools,studentsdon’thavesufficientaccess____thelibrary.A、ofB、i
It’snearly4hours’drivefromhere,______wehavetostartveryearlyifwewa
Newspapersarenotnearlyaspopulartodayastheywereinthepast.Therea
Newspapersarenotnearlyaspopulartodayastheywereinthepast.Therea
Newspapersarenotnearlyaspopulartodayastheywereinthepast.Therea
Newspapersarenotnearlyaspopulartodayastheywereinthepast.Therea
Thecloudshadspreadandnearly______theentiresky.A、separatedB、hiddenC、bloc
随机试题
SixSecretsofHigh-EnergyPeopleA)There’sanenergycris
Ifwe______inthispractice,graduallywe’lllearnhowtoexpressourselvesin
发生火灾时,加压送风应做到:防烟楼梯间压力>走道压力>前室压力>房间压力
工程质量保修是对房屋建筑工程竣工验收后在保修期限内出现的质量缺陷,予以修复。
Thesmartphonebenefitsusalot,butt
下列哪项不是脱落细胞学的缺点A.非肿瘤性疾病诊断研究少 B.具体部位难确定
特异型糖尿病中不属于继发糖尿病的是A.胰岛β细胞遗传性功能基因缺陷所致糖尿病
经蚊吸血传播的病毒A.脊髓灰质炎病毒B.脑炎病毒C.乙型肝炎病毒D.麻疹病毒E.
小明从甲地出发去往乙地,出发20分钟后,距离两地中点还有一半的距离。继续行走5公
(2019年真题)根据《建设工程工程量清单计价规范》,关于投标人投诉招标人不按规
最新回复
(
0
)