首页
登录
职称英语
Toronto’s third City Hall, now known as Old City Hall, was designed by Edwar
Toronto’s third City Hall, now known as Old City Hall, was designed by Edwar
游客
2024-01-16
57
管理
问题
Toronto’s third City Hall, now known as Old City Hall, was designed by Edward James Lennox and declared open on Sept. 18, 1899.
Created to provide more space for city officials, it turned out to be the largest building in the city and the largest city building in North America at the time.
Lennox took three years to design the City Hall and it took 11 years to build it. Contemporaries believe that the odd carvings(雕刻) above the Queen Street entrance were actually caricatures(漫画) of councilors at the time.
Lennox even included himself in the caricatures, on the west side of the central arch (拱门), and left a strange signature in the stonework of the link portions of the building.
The third City Hall was originally used as councilors’ offices and legal offices, but it is used only as a courthouse today.
When the fourth City Hall (the one we know today) was declared open in 1965, Old City Hall was threatened to be pulled down. It was saved by a group of people called the "Friends of Old City Hall."
The clock tower stands parallel with the middle of Bay Street, rather than with the center of the building. The bells in the tower were not installed until the building opened. Old City Hall was declared a historical site in 1989.
(80)The entire structure cost more than $2. 5 million to build at the time. This is equal to $ 53 million today. [br] Toronto’s third City Hall came into use in______.
选项
A、the 18th century
B、the 19th century
C、the 20th century
D、the 21st century
答案
B
解析
细节题。题干问的是“多伦多第三市政厅在哪一年投入使用?”根据定位句“多伦多第三市政厅…于1899年9月18日开放”可知,市政厅是在1899年投入使用。1899年属于19世纪,故选B。
转载请注明原文地址:http://tihaiku.com/zcyy/3366073.html
相关试题推荐
Whynothaveanewmachinedesigned?—______.I’llhavesomeonedoitsoon.A、I
—Whynothaveanewmachinedesigned?—______.I’llhavesomeonedoitsoon.A、I
Afterbeingtestedinmanyways,thisnewly-designedmachinewill______inthene
Afterbeingtestedinmanyways,thisnewly-designedmachinewill______inthene
Toronto’sthirdCityHall,nowknownasOldCityHall,wasdesignedbyEdwar
Toronto’sthirdCityHall,nowknownasOldCityHall,wasdesignedbyEdwar
Toronto’sthirdCityHall,nowknownasOldCityHall,wasdesignedbyEdwar
Toronto’sthirdCityHall,nowknownasOldCityHall,wasdesignedbyEdwar
Toronto’sthirdCityHall,nowknownasOldCityHall,wasdesignedbyEdwar
AfterbeingtestedinmanyWays,thisnewly-designedmachinewill______inthen
随机试题
[originaltext]InEnglandbicyclesareoftencalled"boneshakers"becausethe
习俗custom
Wearenotwhowethinkweare.TheAmericanself-imageissuffusedwith
Undersuchsevereconditions,___________________(我们要牢记节约用水).weshouldalwaysbe
若A学校分别与B设计院和C建筑公司签订了学校教学楼的设计合同与施工承包合同,则教
调制箍围药,取其清凉解毒作用的,应选用( )。A.醋 B.葱 C.鸡子清
关于荧光免疫自动化分析,下列描述错误的是A:是将抗原抗体结合反应与荧光物质发光分
根据《建设工程质量管理条例》,施工单位在施工过程中发现设计文件和图纸有差错的,应
喜马拉雅山是目前地球上最高的山脉。其顶峰珠穆朗玛峰高达8848米,堪称世界之最。
(2020年真题)某乳制品生产企业4名员工进入有限空间沉淀池进行清淤作业。根据《
最新回复
(
0
)