首页
登录
职称英语
If the Dakota Access Pipeline(输油管道) is completed, it will carry nearly half
If the Dakota Access Pipeline(输油管道) is completed, it will carry nearly half
游客
2024-01-15
32
管理
问题
If the Dakota Access Pipeline(输油管道) is completed, it will carry nearly half a million barrels of oil across four states every day. Energy Transfer Partners (ETP) , a Texas-based company behind the $3. 8 billion project, hopes to finish construction this year. But the Standing Rock Sioux, an American Indian tribe(部落), is determined to stop the 1,172-mile pipeline from being built. (76)
Both sides show no signs of backing down.
The Dakota Access Pipeline was announced in 2014. A section of it will run near the Standing Rock Sioux reservation. A reservation is an area of land set aside for American Indians. The tribe says the construction threatens to destroy historical areas and ancient burial sites. They also say the pipeline could pollute their main water source, the Missouri River. In April, the Standing Rock Sioux began a protest against the project. They camped at the construction site. Since then, thousands of people, including people from American Indian tribes, have traveled to the site to join the protest.
ETP says that the pipeline will have built-in safety measures to protect against oil leaks. Workers will also monitor it remotely, and will be able to close valves (阀) within three minutes if leaks are detected.
American Indians have been staging a nonviolent protest for months. The protest took a turn last week when police were called to keep the peace between protesters and armed security guards hired by the company.
(77)
Twenty-eight people have been arrested since then and charged with interfering with the pipeline construction.
[br] Why do American Indians protest against the construction of this pipeline?
选项
A、Because it will cost up to $3.8 billion.
B、Because it threatens the region’s water supply.
C、Because it will make many people lose their jobs.
D、Because it will force many people to leave their homes.
答案
B
解析
细节题。题干问的是“为什么美国印第安人抗议反对输油管道的建设?”根据定位句“他们同时认为管道可能会污染当地的主要水源——密苏里河”可知,印第安人反对管道建设的一个原因是担心管道会污染水源。A项“因为工程耗资达38亿”,不是印第安人抗议的原因;C项“因为很多人会因此失业”和D项“这将迫使很多人离开家园”均未在文中提及,故选B。
转载请注明原文地址:http://tihaiku.com/zcyy/3366065.html
相关试题推荐
He______havecompletedhiswork;otherwise,howwouldn’tbeenjoyinghimselfby
______nearlyallbehaviorislearnedbehaviorisabasicassumption(假设)ofsocia
Newspapersarenotnearlyaspopulartodayastheywereinthepast.Therea
Newspapersarenotnearlyaspopulartodayastheywereinthepast.Therea
Thecloudshadspreadandnearly______theentiresky.A、separatedB、hiddenC、bloc
Thereisno______tothehousefromthemainroad.A、accessB、avenueC、exposureD、
Regretisascommonanemotionasloveorfear,anditcanbenearlyaspowe
Regretisascommonanemotionasloveorfear,anditcanbenearlyaspowe
Regretisascommonanemotionasloveorfear,anditcanbenearlyaspowe
Thereisno______tothehousefromthemainroad.A、accessB、avenueC、exposureD、
随机试题
Thisbookiswrittentosupplythematerialonbiologicalchemistrytofreshmen
BillGateswas20yearsold.SteveJobswas21.WarrenBuffettwas26.Ralph
为着这匹马,父亲向祖父起着终夜的争吵。“两匹马,咱们是算不了什么的,穷人,这匹马就是命根。”祖父这样说着,而父亲还是争吵。九岁时,母亲死去。父亲也就更变了
简述皮亚杰的认知动力说。
风险管理包括()和控制等方面的工作。A、策划 B、组织 C、领导 D、协调
患者,男性,36岁。搬运重物后突然出现胸痛、干咳、呼吸困难。此时应进行的检查是
传统的创新观念认为创新没有固定结构,不遵从规则和模式。想要成为创新者的人被告知要
根据规定,建设工程合同的形式()。A.可以是书面的 B.可以是口头的
建设工程信息管理系统的功能有( )。A.实现监理信息的及时收集和可靠存储 B
背景资料 某港池开挖、吹填造陆工程,开挖区的土质上层为中细砂、中层为黏土、底层
最新回复
(
0
)