首页
登录
职称英语
In a plan to stop the erosion of East Coast beaches, the Army Crops of Engineeri
In a plan to stop the erosion of East Coast beaches, the Army Crops of Engineeri
游客
2024-01-13
42
管理
问题
In a plan to stop the erosion of East Coast beaches, the Army Crops of Engineering proposed building parallel to shore a breakwater of rocks that would rise six feet above the waterline and
act as a buffer, so that it absorbs
the energy of crashing waves and protecting the beaches.
选项
A、act as a buffer, so that it absorbs
B、act like a buffer so as to absorb
C、act as a buffer, absorbing
D、acting as a buffer, absorbing
E、acting like a buffer, absorb
答案
C
解析
本句展示了and的判定意义。第一个and表明act应与rise并列,而不是与building并列,排除D、E;第二个and表明absorb应与protect形式一致,由此选C。absorbing与protecting并列作rise和act的伴随结果。此句中的parallel to shore修饰a breakwater,由于a breakwater后还有定语从句修饰,所以把parallel to shore前置。
转载请注明原文地址:http://tihaiku.com/zcyy/3358097.html
相关试题推荐
Inastudyofmorethan8,000peopleusingtenbeachesontwooftheGreatLakes
Thenumberofundergraduatedegreesinengineeringawardedbycollegesandunive
InaplantostoptheerosionofEastCoastbeaches,theArmyCropsofEngineeri
Usingthetechniquesemployedbygeneticengineering,anewspeciesofmicroorga
RUBBER:TIRE::A、skin:hairB、silver:cutleryC、window:paneD、erosion:ironE、piece
RUBBER:TIRE::A、skin:hairB、silver:cutleryC、window:paneD、erosion:iron
Consumersmaythinkthatgeneticengineeringoffoodsissomethingnew,buthuma
The______ofimpactcratersonVenussuggeststhaterosionmayhavesmoothedits
随机试题
WhatisJackgoingtodo?[originaltext]W:Hi,Jack.Couldyouhelpmecarrythe
ItseemsincredibletomethatLatinisnottaughtinschoolsasamatterof
Everysoofteninourlife,crisisloomslargeandclosebeforeus.Inface
(2013年)在历史成本计量下,下列表述中错误的是( )。A.负债按预期需要偿
能见度检测器的静电放电抗扰度应该满足等级()的要求。A.4 B.3 C.2
A.1d常用量 B.3d常用量 C.7d常用量 D.15d常用量 E.2
不影响继电保护和安全自动装置性能,装置能继续运行,可在不退出装置的情况下或随检验
商检法规定,必须实施的进出口商品检验,是指确定法定检验商品是否符合国家技术规范的
张某于2013年7月1日经招聘进入某公司担任部门经理,双方签订了2013年7月1
大卫生观包括的主要内容A.卫生事业结构简单,是一种刚起步的社会性事业 B.生物
最新回复
(
0
)