A system was developed to control traffic congestion on the M25 motorway. Expert
A system was developed to control traffic congestion on the M25 motorway. Expert
游客
2024-01-05
48
管理
问题
A system was developed to control traffic congestion on the M25 motorway. Experts use【L5】________information from the motorway to set【L6】________according to traffic build-up. However, in order to maintain a steady flow of traffic, the number of vehicles on the roads should not exceed【L7】________per lane per hour, which is far fewer than the number on【L8】________of the motorway. One solution could be to fit the car with【L9】________and a computer. The system would be activated when approaching an area of congestion and the computer would then regulate the acceleration and【L10】________to help the car to pass easily through the congestion. [br] 【L8】
A: So they’re looking at live action on the motorway?
D: Exactly. Because they’re working in real time and reacting immediately to the situation on the road, they hope to alleviate problems before they happen. So as the traffic gets heavier to the point where these waves of congestion are likely to form, the controllers monitoring the situation set speed limits at say, 50 or 60 mph to regulate the flow. Further back down the motorway at the back of the congestion zone, they set a lower speed limit, say 40 mph, which should theoretically help control the traffic through the problem area.
A: But traffic jams still happen on the M25, don’t they? I was in one a few months ago and we were at a standstill for ages.
D: Yes, of course, sometimes there are simply too many cars on the roads, I think what the programme said was that the ideal number of cars on the road is
no more than 2,000 per lane per hour
— something like that. Theoretically, this should keep traffic moving smoothly at all times. But of course the number of cars on the road
far exceeds this
— I think in
some sections of the M25
there have been up to 200,000 vehicles a day.
A: Mmm. So, basically we need to reduce the number of cars on the roads. Well, that’s not likely to happen, is it?
D: No, but researchers are still looking into car technology that might help. As most congestion waves are caused by drivers braking too hard suddenly, the idea is that you
install radar on the outside of the car
and an onboard computer. The driver would activate the system when signs alerted him or her to a possible congestion zone. Then the computer would take over and then
take control of the braking and acceleration.
Because it can react much faster than a human driver, in theory, it would control the car smoothly through the zone.
A: A bit like an auto-pilot system?
D: Yes.
选项
答案
some sections
解析
本题有关M25高速路上某个区域的交通量。录音原文对题目进行了反义转换,录音中的far exceeds是题目中far fewer than的反义转换。
转载请注明原文地址:http://tihaiku.com/zcyy/3336596.html
相关试题推荐
[img]2012q1/ct_eirm_eirread_0037_20121[/img][br]systematicdesign
Aspark,aflint:HowfireleapttolifeThecontroloffire
Aspark,aflint:HowfireleapttolifeThecontroloffire
Aspark,aflint:HowfireleapttolifeThecontroloffire
Aspark,aflint:HowfireleapttolifeThecontroloffire
Tocontroldustatminesites,miningcompaniesoftenuseA、chemicalswhichmayb
MorseCodeMorsecodeisbeingreplacedbyanewsatellite-basedsystemforsend
MorseCodeMorsecodeisbeingreplacedbyanewsatellite-basedsystemforsend
MorseCodeMorsecodeisbeingreplacedbyanewsatellite-basedsystemforsend
MorseCodeMorsecodeisbeingreplacedbyanewsatellite-basedsystemforsend
随机试题
Theworldhasexperienced【L1】______urbangrowthintherecentdecades.Asmu
平安工地建设考核评价中的施工单位考核评价包括()。A.施工单位综合管理考核
A.1次 B.2次 C.3次 D.4次
现浇水泥蛭石保温隔热层,夏季施工时应选用下列何种水泥?()A.火山灰水泥
下列不属于股权投资基金一般风险的是()。A、资金损失风险 B、基金委托募集所
脂质体的制备方法包括A.薄膜分散法 B.复凝聚法 C.研磨法 D.单凝聚法
某养猪专业合作社于2010年12月成立。入社成员100户,均为专业养猪大户,并带
下图所示为被称为“天下第一行书”的书法作品,它的名称和作者是()。 A.王羲
(2010年)需监理单位在竣工图图标上方加盖并签署竣工图确认章的是()。A.原施
关于正反馈的叙述,正确的是A.使某种生理功能活动不断加强,直至完成 B.是体液
最新回复
(
0
)