首页
登录
职称英语
A system was developed to control traffic congestion on the M25 motorway. Expert
A system was developed to control traffic congestion on the M25 motorway. Expert
游客
2024-01-05
57
管理
问题
A system was developed to control traffic congestion on the M25 motorway. Experts use【L5】________information from the motorway to set【L6】________according to traffic build-up. However, in order to maintain a steady flow of traffic, the number of vehicles on the roads should not exceed【L7】________per lane per hour, which is far fewer than the number on【L8】________of the motorway. One solution could be to fit the car with【L9】________and a computer. The system would be activated when approaching an area of congestion and the computer would then regulate the acceleration and【L10】________to help the car to pass easily through the congestion. [br] 【L6】
A: So they’re looking at live action on the motorway?
D: Exactly. Because they’re working in real time and reacting immediately to the situation on the road, they hope to alleviate problems before they happen. So as the traffic gets heavier to the point where these waves of congestion are likely to form, the controllers monitoring the situation set speed limits at say, 50 or 60 mph to regulate the flow. Further back down the motorway at the back of the congestion zone, they set a lower speed limit, say 40 mph, which should theoretically help control the traffic through the problem area.
A: But traffic jams still happen on the M25, don’t they? I was in one a few months ago and we were at a standstill for ages.
D: Yes, of course, sometimes there are simply too many cars on the roads, I think what the programme said was that the ideal number of cars on the road is
no more than 2,000 per lane per hour
— something like that. Theoretically, this should keep traffic moving smoothly at all times. But of course the number of cars on the road
far exceeds this
— I think in
some sections of the M25
there have been up to 200,000 vehicles a day.
A: Mmm. So, basically we need to reduce the number of cars on the roads. Well, that’s not likely to happen, is it?
D: No, but researchers are still looking into car technology that might help. As most congestion waves are caused by drivers braking too hard suddenly, the idea is that you
install radar on the outside of the car
and an onboard computer. The driver would activate the system when signs alerted him or her to a possible congestion zone. Then the computer would take over and then
take control of the braking and acceleration.
Because it can react much faster than a human driver, in theory, it would control the car smoothly through the zone.
A: A bit like an auto-pilot system?
D: Yes.
选项
答案
speed limits
解析
本题有关M25高速路上引入的措施。录音原文中的set speed limits在题目中原词复现,录音中的collected from是题目中according to的同义替换。
转载请注明原文地址:http://tihaiku.com/zcyy/3336594.html
相关试题推荐
Choosethecorrectletter,A,BorC.[br]Whoistheexpertontreatinghearing
Choosethecorrectletter,A,BorC.TrafficChangesinGranford[br]According
Choosethecorrectletter,A,BorC.TrafficChangesinGranford[br]Inasurv
Choosethecorrectletter,A,BorC.TrafficChangesinGranford[br]Whyarec
AsystemwasdevelopedtocontroltrafficcongestionontheM25motorway.Expert
HowtoMakePersonalControlofOne’sHealth【L31】________shouldtakechargeof
HowtoMakePersonalControlofOne’sHealth【L31】________shouldtakechargeof
HowtoMakePersonalControlofOne’sHealth【L31】________shouldtakechargeof
HowtoMakePersonalControlofOne’sHealth【L31】________shouldtakechargeof
HowtoMakePersonalControlofOne’sHealth【L31】________shouldtakechargeof
随机试题
AllofthefollowingworksarewrittenbyJamesJoyceEXCEPT______A、Ulysses.B、
Marydidnotcometothepartylastnight,andIthinkshe______toomuchworkto
Sinceadvertisementexpensesformpartofthecostofproduction,whichhastobe
根据《商业银行资本管理办法(试行)》的规定,符合条件的优先股属于()。A.
公共营养师职业守则没有对从事公共营养师职业的人员的( )进行要求。A.职业目标
我国历史上,有一段历史长时间挥之不去,留下的伤痛不仅仅是过去,更是现在,我们难以
招标人和中标人应当自中标通知书发出之日起()日内,按照招标文件和中标人的投标文件
(2018年真题)根据《民法典·合同编》,当事人在订立合同过程中有( )情形,
某机电安装公司承担了某钢厂冷轧薄板连续退火炉工程中机电部分的安装施工任务,工程内
关于买卖合同的法律特征,下列表述错误的是()。A.买卖合同是一种转移财产所有权的
最新回复
(
0
)