首页
登录
职称英语
Art Murals[img]2012q1/ct_etoefm_etoeflistz_0647_20121[/img] [br] Why is the clas
Art Murals[img]2012q1/ct_etoefm_etoeflistz_0647_20121[/img] [br] Why is the clas
游客
2024-01-04
48
管理
问题
Art Murals
[br] Why is the class discussing the technical requirements of murals?
W1: I know you’re all excited about our class project. But before we get started on the design of our mural, let’s review some of the technical requirements for murals. What factors do we need to keep in mind? Yes, Lydia?
W2: The mural has to be permanent. It has to last as long as the building. And it has to be sturdy enough to put up with conditions like the walls being washed.
W1: Good points. Yes, David?
M: It should have a flat finish so you can look at it from all angles without seeing any glare. And the design should be laid out so you can see it while you’re walking rather than standing still.
W1: Yes, those are all things we need to bear in mind. We want people to take in our mural—all of it—from a moving position, since they’ll be observing it as they walk through the lobby to the elevators. And let’s not forget that our mural is more than just a large-scale work of art done on a wall instead of a canvas. The term "mural" implies a distinct feeling or nature, a quality that’s appropriate to the architecture and the function of the room. A mural is an integral part of the building. If it’s painted in an existing building, like ours will be, it should be planned to fit into the architectural design, instead of giving the impression that it’s a surface decoration. Now, what are some of the technical requirements for our wall?
M: Obviously, the wall shouldn’t move. It shouldn’t shrink or settle because that could cause cracks in the paint or plaster.
W1: Yes, it’s vital that our wall be perfectly immovable. And for murals like ours—remember, our mural will be on the interior side of an exterior wall—another important requirement is that dampness should be excluded. Dampness can result from water seeping through porous materials or through joints, corners, or flaws in the building construction. When water leaks through a wall, it may dissolve the salts that are in the building materials. When the moisture dries, the salts are deposited in the form of white, moldy-looking film on the surface of the plaster. This greatly weakens the plaster, which can crumble or crack, and, of course, it’s disastrous to the mural.
W2: Can moisture make the paint peel off?
W1: Yes, it can. When moisture penetrates a wall coated with paint, it causes the plaster to expand and the paint to peel off—either in small flakes or in big pieces. And we don’t want that happening to our work, so we’ll need to take measures to prevent it. Our goal will be to reduce expansion of the plaster and to lessen the condensation of moisture on the surface. So our first rule is to exclude dampness as much as possible.
M: Don’t we also need to guard the plaster from extreme changes in temperature?
W1: Yes. So, how are we going to do this?
M: We could create an air space between the outer wall of the building and the plaster. We could do this by building a screen or, urn, like a false Wall just inside the exterior wall, and then we put the plaster for the mural on this false wall. There’d be like an inch of air space between the false wall and the exterior wall. The air space would have an insulating effect. What I mean is, it would slow down any temperature changes on the plaster.
W1: Yes, you’re correct about the insulating effect of an air space. Now, to do this—it’s called "furring" the wall—what we do is, we attach thin strips of wood to the exterior wall, and then we build another wall on top of this. The furring of the wall creates an air space of one-half to one inch between the outer and inner walls. That’s enough to protect our mural from moisture and temperature changes, as well as the mechanical strains and stresses of the wall itself.
选项
A、They are preparing for an examination.
B、They plan to visit some famous murals.
C、They are helping to design a new building.
D、They will be creating their own mural.
答案
D
解析
The class will be creating their own mural. The instructor says I know you’re all excited about our class project. But before we get started on the design of our mural, let’s review some of the technical requirements for murals. (2.3)
转载请注明原文地址:http://tihaiku.com/zcyy/3332171.html
相关试题推荐
[img]2012q1/ct_eilm_eillist_0031_20121[/img][br][originaltext]ADVISOR:Isthe
[img]2012q1/ct_eilm_eillist_0031_20121[/img][br][originaltext]ADVISOR:Isthe
[img]2012q1/ct_eilm_eillist_0017_20121[/img][br][originaltext]Okay,nowg
[img]2012q1/ct_eilm_eillist_0017_20121[/img][br][originaltext]Okay,nowg
[img]2012q1/ct_eilm_eillist_0399_20121[/img][br][originaltext]IfI’vepersuad
[img]2012q1/ct_eilm_eillist_0399_20121[/img][br][originaltext]IfI’vepersuad
[img]2012q1/ct_eilm_eillist_0399_20121[/img][br][originaltext]IfI’vepersuad
[img]2012q1/ct_eilm_eillist_0399_20121[/img][br][originaltext]IfI’vepersuad
[img]2012q1/ct_eilm_eillist_0399_20121[/img][br][originaltext]IfI’vepersuad
[img]2012q1/ct_eilm_eillist_0339_20121[/img][br][originaltext]DAWN:We’vecha
随机试题
AtAirbnb’sheadquartersinSanFrancisco,everymeetingareaisdecoratedt
Whenmymother’shealthwasfailing,Iwasthe"bad"sisterwholivedfaraw
某公司年末会计报表上部分数据为:流动负债80万元,流动比率为3,速动比率为1.6
患者,男,68岁。半身不遂,口眼歪斜,语言謇涩,口角流涎,下肢痿废,小便频数,舌
A.基础质量评价 B.行为过程评价 C.环节质量评价 D.基本素质评价
()主管全国教育工作,统筹规划、协调管理全国的教育事业。A.国务院教育行政部门
按照业务特点和风险特征的不同,商业银行的客户可以划分为()。 A.企业类客户
(2020年真题)甲公司只生产销售一种产品,2019年度利润总额为100万
下列焊接缺陷,属于按缺陷形态分类的是( )。A.宏观缺陷 B.微观缺陷 C
参加应急预案评审的人员可以是()。A.施工单位的作为专家的总工 B.施工单位
最新回复
(
0
)