首页
登录
职称英语
Problem Description of the Flood Early Warning SystemVocabulary and Expressions
Problem Description of the Flood Early Warning SystemVocabulary and Expressions
游客
2023-12-29
71
管理
问题
Problem Description of the Flood Early Warning System
Vocabulary and Expressions
physically-based algorithm deploy populace
calibrate adaptive illiterate fuse [br] Given a suite of robust adaptive distributed algorithms for flood warning, it will benefit the developing countries.
The Problem Description of the Flood Early Warning System
In developing countries, warning communities of an incoming flood is an expensive proposal given their limited resources. The equipment necessary for early warning flood systems is expensive and centralized to support flood detection schemes that are computationally complex. This project explores new techniques for distributing the computation of flood detection within a wireless sensor network, grounding the research in reality through the design and installation of an early warning system for flooding in a developing country.
Sensor networks for flooding do not exist in a real-time automated capacity within developing countries. We are developing such a sensor network and examining how to distribute and adapt the flood prediction calculation. Current flood prediction relies on physically-based models requiring large amounts of data in order to calibrate the model, and significant computation power to compute the model. Neither of these being feasible on a sensor network as data,storage and computing power are limited, we are working on statistical algorithms capable of online, distributed computation.
Given a suite of robust adaptive distributed algorithms for flood warning, we are planning to implement these algorithms on a system that can be deployed within a developing country. This poses a number of challenges, ranging from survival in harsh flood environments, lack of trained personnel to maintain the system, and an illiterate populace to warn. Designing and implementing a system that addresses these issues poses interesting engineering problems. Key research questions here include: How does each sensor node measure its environment? How does each sensor communicate with the rest of the network, and convey its ongoing status given the worst weather conditions possible on a river? How and where should the information from the sensors be processed and fused?
选项
A、正确
B、错误
答案
A
解析
该表述是对原文相关内容的同义表述,因此本题正确。
转载请注明原文地址:http://tihaiku.com/zcyy/3315160.html
相关试题推荐
Lackofmoneycontinuedtobea_________problem,andshefinancedthehomebyse
TheproblemofaccuratelyassessingtheroleofEnglishincontemporaryresearch
Thelocalgovernmentleadersaremakingeveryeffortto_________theproblemof
Tomcreditshisfatherforhis_________withtheresearchofsocialproblems.A、oc
[originaltext]Anotherproblemwithchildreninvolvedischildabuse.Child
WhatdoesthespeakerthinkaboutPeter’sopinionoftheproblem?[br][origina
WhatdoesthespeakerthinkaboutPeter’sopinionoftheproblem?[originaltext]
IMF’sConcernaboutZimbabwe’sEconomyVocabularyandExpressionsInternational
IMF’sConcernaboutZimbabwe’sEconomyVocabularyandExpressionsInternational
IMF’sConcernaboutZimbabwe’sEconomyVocabularyandExpressionsInternational
随机试题
Readthisreferenceaboutanemployee.Choosethebestwordtofillineachgap.
Innineteenth-centuryAmerica,practicallyeverythingthatwasbuiltinvolvedwo
黏性土的塑性指数()。A:>2 B:<2 C:>10 D:<10
同业拆借可以在金融机构和非金融机构之间进行,严禁个人参与。()
施工准备阶段质量管理,在技术准备工作中,由()主持有关人员参加对设计图纸进行学习
下列寒性腹痛的疼痛特点A.腹部胀痛,攻窜不定 B.腹痛绵绵,时作时止 C.腹
女,47岁。反复右上腹痛3年,放射至背部,3次上消化道出血。BAO9mmol/h
下列有关现代生物技术的说法中错误的是:A.染色体工程可以培育抗病品种 B.基因
下列项目中应通过“营业外收入”科目核算的有()。A.无法支付的应付账款 B.
在建设工程施工招标投标中,招标人与中标人签订合同后()个工作日内,应当向中
最新回复
(
0
)