首页
登录
职称英语
The city water pipes in Rome were usually of baked clay or lead; copper was
The city water pipes in Rome were usually of baked clay or lead; copper was
游客
2023-12-24
50
管理
问题
The city water pipes in Rome were usually of baked clay or lead; copper was sometimes used and also hollowed stone. For the large supply conduits leading to the city the Romans used covered channels with free water surfaces, rather than pipes. Perhaps this choice was a matter of economics, for apparently they could make lead pipes up to 15 inches in diameter. While pipes can follow the profile of undulating ground, with the pressure increasing in the lower areas, channels cannot. They must slope continuously downwards, because water in channels does not normally flow uphill; and the grade must be flat, from 1 in 60 in small channels to perhaps 1 in 3,000 in large ones, to keep the water speed down to a few feet per second. Thus the main supply channels or aqueducts had long lengths of flat grade and where they crossed depressions or valleys they were carried on elevated stone bridges in the form of tiered arches. At the beginning of the Christian era there were over 30 miles of these raised aqueducts in the 250 miles of channels and tunnels bringing water to Rome. The channels were up to 6 feet wide and 5 to 8 feet high. Sometimes channels were later added on the tops of existing ones. The remains of some of these aqueducts still grace the skyline on the outskirts of Rome and elsewhere in Europe similar ruins are found.
Brick and stone drains were constructed in various parts of Rome. The oldest existing one is the Cloaca Maxima which follows the course of an old stream. It dates back at least to the third century B.C. Later the drains were used for sewage, flushed by water from the public baths and fountains, as well as street storm run-off.
The truly surprising aspect of the achievements of all the ancient hydraulic artisans is the lack of theoretical knowledge behind their designs. Apart from the hydrostatics of Archimedes, there was no sound understanding of the most elementary principles of fluid behaviour. Sextus Frontinus, Rome’s water commissioner around A.D. 100, did not fully realize that in order to calculate the volume rate of flow in a channel it is necessary to allow for the speed of the flow as well as the area of cross-section. The Romans’ flow standard was the rate at which water would flow through a bronze pipe roughly 4/3 inch in diameter and 9 inches long. When this pipe was connected to the side of a water-supply pipe or channel as a delivery outlet, it was assumed that the outflow was at the standard rate. In fact, the amount of water delivered depended not only on the cross-sectional area of the outlet pipe but also on the speed of water flowing through it and this speed depended on the pressure in the supply pipe. [br] The Romansused all of the following to make water pipes EXCEPT ______
选项
A、earth
B、wood
C、copper
D、stone
答案
B
解析
这是道细节题。这道题需要注意的是题目问的是除了……之外,所以要找的答案其实是不属于的那个。从文章第一段可以看出B不在答案之列。“The city water pipes in Rome were usually of baked clay or lead;copper was sometimes used and also hollowed stone.”从这句话可以看出没有提到过wood。
转载请注明原文地址:http://tihaiku.com/zcyy/3300814.html
相关试题推荐
ThecitywaterpipesinRomewereusuallyofbakedclayorlead;copperwas
ThecitywaterpipesinRomewereusuallyofbakedclayorlead;copperwas
Middlebornchildrenwilltellyouthattheyusuallydidn’tfeelallthatsp
Doesusingawordprocessoraffectawriter’sstyle?Themediumusuallydoes
Doesusingawordprocessoraffectawriter’sstyle?Themediumusuallydoes
Doesusingawordprocessoraffectawriter’sstyle?Themediumusuallydoes
Doesusingawordprocessoraffectawriter’sstyle?Themediumusuallydoes
Doesusingawordprocessoraffectawriter’sstyle?Themediumusuallydoes
Wehaveallheardofcounterfeitingbefore.Usuallyitreferstopeoplemakin
Wehaveallheardofcounterfeitingbefore.Usuallyitreferstopeoplemakin
随机试题
WhichofthefollowingisNOTTRUEaccordingtothepassage?[originaltext]Sally
ThemoreIreflectonthe23impressiveyearssincethesigningoftheMo
HowtoApproachaDissertationⅠ.Definition
OnJuly12,1993,ayoungprofessorofAmericanhistorynamedFrederickJackson
Pricesdeterminehowresourcesaretobeused.Theyarealsothemeans【C1】__
低密度脂蛋白胆固醇的英文缩写是A.TC B.HDL-C C.LDL-C D
(2017年真题)关于为有关基金业务活动出具法律意见书的律师事务所,下列表述正确
当微机监控装置故障时,若有备用充电装置,应先投入备用充电装置,并将故障装置退出运
A. B. C. D.
岩土工程分析评价应符合的要求有( )。A.充分了解工程结构的类型、特点、荷载情
最新回复
(
0
)