首页
登录
职称英语
How many pre-constructed sections are made on land? [originaltext]M: Good evenin
How many pre-constructed sections are made on land? [originaltext]M: Good evenin
游客
2023-10-18
51
管理
问题
How many pre-constructed sections are made on land?
M: Good evening! And welcome to the science show. We’ve heard a lot recently about extreme engineering. And one of the most amazing and astonishing ideas is a rail tunnel under the Atlantic Ocean, linking New York and London. With me in the studio to discuss this is Professor Massa. Welcome to the program, professor.
W: Thank you.
M: So, the first question, how would the transatlantic tunnel be built?
W: Well, it will be built in pre-constructed sections.
M: Urn, pre-constructed sections?
W: Yes, they would be made on land, and then put together under the sea.
M: Oh, how many of them?
W: Fifty-four thousand. They will be held in place by giant anchors which will be fixed to the bottom of the ocean. The tunnel will float 200 meters under the surface.
M: Amazing. And now as I understand it, the train running through this tunnel would be a magnetically levitated train, is that right? So what is a magnetically levitated train?
W: A magnetically levitated train, or maglev, isn’t like a conventional train. It doesn’t have wheels and doesn’t travel on rails. It travels in the vacuum between two magnets. The idea about it is an old one invented in Germany over seventy years ago.
M: And how fast does it travel ?
W: At the moment, a maglev train can travel at about 500km per hour. However, it will be possible for it to travel at 6,000km per hour.
M: Are you serious?
W: The journey from New York to London is about 5000km, and it will take 54 minutes.
M: How is this possible?
W: Well, ordinary trains travel on rails, so they can only reach a speed of around 300km per hour, and they are also very noisy. Maglev trains don’t use rails, so there’s no noise. There’s no pollution. The train would be fast, comfortable and quiet. The disadvantage is that the tracks should be specially built and they are very expensive indeed.
M: And will the transatlantic tunnel be safe?
W: Well, safety is the big problem. The ocean is very powerful, and the tunnel could be bent or cracked. Also a passing submarine or a drifting iceberg could hit the tunnel.
选项
A、54,000.
B、45000
C、50000
答案
A
解析
采访中Professor Massa告诉主持人一共有54,000个部件。
转载请注明原文地址:http://tihaiku.com/zcyy/3109276.html
相关试题推荐
[originaltext]CarbonFootprintAca
[originaltext]SpaceJunkSpacejunk
[originaltext]M:Thatwasalovelyparty,wasn’tit?W:Yes,itwas.Thefoodw
[originaltext]M:Thatwasalovelyparty,wasn’tit?W:Yes,itwas.Thefoodw
[originaltext]M:Thatwasalovelyparty,wasn’tit?W:Yes,itwas.Thefoodw
[originaltext]M:Thatwasalovelyparty,wasn’tit?W:Yes,itwas.Thefoodw
[originaltext]W:Hi,Jay!M:Hi,Linda.AreyoureadyforyourbigtriptoChic
[originaltext]W:Hi,Jay!M:Hi,Linda.AreyoureadyforyourbigtriptoChic
[originaltext]W:Hi,Jay!M:Hi,Linda.AreyoureadyforyourbigtriptoChic
[originaltext]M:Goodmorning,Mrs.Black.Anynews?W:Goodmorning,Mr.Brown
随机试题
(1)Viewedfromastarinsomeothercomerofthegalaxy,Earthwouldbeasp
Attitudestowardsdaydreamingarechanginginmuchthesameway______attitudes
At43,I’vereachedthestagewherewomenarewarnedtowatchoutforthecr
NelsonMandelawasstillinjailwhenthefirststreetwasnamed【C1】______
SydneyOperaHousemustbeoneofthemostrecognizableimagesofthemodem
一位新生儿生后2个月黄疸不退,超声检查示肝脏回声稍增强,胆囊未见显示,肝内胆管显
论项目的采购管理项目采购是为完成项目工作从承担该项目的组织外部购买或获取项目所需
客户信息收集主要包括( )。 Ⅰ.初级信息收集 Ⅱ.非财务信息收集 Ⅲ.
工程项目前期工作计划的编制是在()进行的。A.项目的初步设计被批准后
斜坡堤堤心石抛石时,抛填方块前应先安放压边方块。实际边线与设计边线间的偏差不应大
最新回复
(
0
)