首页
登录
职称英语
High in the Mojave desert, 130 miles northeast of Los Angeles, lies a vast f
High in the Mojave desert, 130 miles northeast of Los Angeles, lies a vast f
游客
2023-10-14
37
管理
问题
High in the Mojave desert, 130 miles northeast of Los Angeles, lies a vast field of mirrors. Crisscrossing rows of glass and metal, glinting in the sunlight, cover a full square mile of dirt. It is a fully operational array of power plants churning out an average of 180 megawatts of electricity.
Most people think of solar power as a flat panel on every rooftop. But photovoltaic panels have limitations. They work fine when the sun is strong, but when the clouds roll in you’ d better have batteries to run the TV and dishwasher. And even on the sunniest days the panels are not very well suited for cities, where roof space is limited.
For decades, engineers have been working on ways to catch the sun over a broad area concentrating it and using it to produce electricity on the same scale as centralized coal, hydro or nuclear power plants—hundreds of megawatts at a time. Several pilot plants have been operating in California, some for decades, but so far they have not had enough volume to force costs down to competitive levels.
Some countries are expected to go with much larger plants capable of generating more than 100 megawatts each. If some of the projects are completed, costs could come down from the current 15 cents a kilowatt-hour for the Mojave plant to 8 cents per kwh in the next 8 to 10 years. That would go a long way toward closing the gap with gas and oil, which now cost as little as 4 cents per kwh.
The Mojave plant is one of the world’s first commercial solar power plants, with five solar Electric Generating Systems (SEGS) supplying electricity to southern California. The basic component of a SEGS plant is a row of mirrors that reflect sunlight onto a pipe filled with oil. The oil heats up and is used to produce steam, which turns an electrical turbine. Assemble a few dozen rows of these trough-mirrors, and you have got capacity to generate 30 megawatts of power, enough for half a small town. The problem with trough technology is that the oil loses its heat too quickly. When the sun goes down, so does the power.
A Solar Tres design uses molten salt instead of oil. Since salt holds more heat longer than oil, it can drive turbine through the night. Concentric rings of mirrors direct sunlight to a tank of molten salt. When the stuff is hot enough, some goes straight to a generator to produce steam, while the rest is stored for use at night. The 15-megawatt Solar Tres plant would be the first long-term commercial power production project. Since the electricity is expected to be costly close to 20 cents per kwh, the Spanish government plans to subsidize the plant.
The next big thing—Dish systems—is already in the works. The building block of such a plant is a parabolic mirror, shaped like a satellite dish, that reflects sunlight onto a small generator suspended in front. The heat drives a turbine. Theoretically a dish configuration would produce more energy per acre than other solar concentrating plants, that is, if engineers could figure out a good way of linking many dishes together. [br] What is the present cost for the Mojave plant?
选项
答案
15 cents a kilowatt-hour.
解析
文章第四段提到,如果其中一些项目得以完成,未来8~10年,莫哈维电厂的成本可能会从目前的15美分每千瓦时降至每千瓦时8美分。因此,莫哈维电厂目前的成本是15美分每千瓦时。由此可知本题答案。
转载请注明原文地址:http://tihaiku.com/zcyy/3097298.html
相关试题推荐
HighintheMojavedesert,130milesnortheastofLosAngeles,liesavastfi
HighintheMojavedesert,130milesnortheastofLosAngeles,liesavastfi
HighintheMojavedesert,130milesnortheastofLosAngeles,liesavastfi
HighintheMojavedesert,130milesnortheastofLosAngeles,liesavastfi
HighintheMojavedesert,130milesnortheastofLosAngeles,liesavas
HighintheMojavedesert,130milesnortheastofLosAngeles,liesavas
HighintheMojavedesert,130milesnortheastofLosAngeles,liesavas
HighintheMojavedesert,130milesnortheastofLosAngeles,liesavastf
HighintheMojavedesert,130milesnortheastofLosAngeles,liesavastf
Formorethanamile,thedesertinsouthernPeruhasacuriousruler-straig
随机试题
[originaltext]TheAmericanRevolutionwasnotasuddenandviolentoverturn
Fast-foodfirmshavetobeathick-skinnedbunch.Healthexpertsregularlyl
HowtoWriteaThesisI.Theintroductionpart—writing
隧道监测内容中,属于岩体力学参数测试的有()。A.变形模量 B.内摩擦角
下列故障类型属于松脱型故障的是()。A.老化 B.剥落 C.脱落 D.断
在分包工程建筑事故中,属于分包单位责任的,总承包单位不会因此受到连累。
真核细胞中的mRNA帽子结构是()。A.7-甲基鸟嘌呤核苷三磷酸 B.7-甲
急性肾盂肾炎的主要病机是( )。A.湿热蕴结下焦,膀胱气化不利 B.湿热蕴结
肺痨出现食少,腰胀,便溏,短气,面浮,咳痰清稀等脾虚症状者,方选A.参苓白术散
(2021年真题)依据《通用安装工程计量规范》(ZYS199208-2013),
最新回复
(
0
)