首页
登录
职称英语
Estimates were obtained from three contractors on the costs of covering the
Estimates were obtained from three contractors on the costs of covering the
游客
2023-09-26
50
管理
问题
Estimates were obtained from three contractors on the costs of covering the offices and class-rooms. All these three were in the $20,000 to $25,000 range. The work would take about three weeks.
Because the central unit would be installed on the roof, some noise problems might occur during a four-or five-day period. And this work could be started from this weekend, and the over-time labor costs of about $1,500 have been included in the estimates.
Additional Installation
Because a larger installation, including a more powerful central unit, would be necessary to handle the halls and stairways, an additional $6,000 would be required for the equipment. If this additional work were delayed until a later time, a new central unit would be required along with changes in the pipe way.
Subject: (46)______ Costs for East Hall
Office and Classroom Installation:
1. Covering area: seven offices and two (47)______
2. Possible problem: some (48)______ might occur during a four- or five-day period
Additional Installation:
1. Budget: $6,000
2. A more powerful (49)______ is needed to handle the halls and stairways
3. Additional installation postponement will result in changes in (50)______ [br]
选项
答案
the pipe way
解析
转载请注明原文地址:http://tihaiku.com/zcyy/3046198.html
相关试题推荐
Estimateswereobtainedfromthreecontractorsonthecostsofcoveringthe
Estimateswereobtainedfromthreecontractorsonthecostsofcoveringthe
Estimateswereobtainedfromthreecontractorsonthecostsofcoveringthe
Estimateswereobtainedfromthreecontractorsonthecostsofcoveringthe
Seenfromspace,ourearth,withwatercovering70%ofitssurface,appearsasa“bl
Seenfromspace,ourearth,withwatercovering70%ofitssurface,appearsasa
FireInstructionThepersondiscoveringafire
FireInstructionThepersondiscoveringafire
FireInstructionThepersondiscoveringafire
FireInstructionThepersondiscoveringafire
随机试题
Thenumberofparentsteachingtheiroffspringathomewillincreaseifthe
Amongthosetanningcustomers,itisestimatedthatmostofthemare______.[br
Scienceforself-reliancehas,inrecentyears,becomeamatterofgreatcon
[img]2018m9s/ct_etoefz_etoeflistz_201808_0026[/img][br]Accordingtotheprofes
从网络角度来看,()是指以宽带IP为技术核心,可同时提供语音、数据、多媒体等服务
最常用于变应性鼻炎的皮肤试验是A.皮内试验 B.鼻腔黏膜试验 C.划痕试验
为了避免钢筋混凝土受弯构件因斜截面受到承载力不足而发生斜压破坏,下列措施不正确的
小儿低钾血症最常用的补钾药物是()A.氯化钾制剂 B.枸橼酸钾制剂 C.
公路工程交工验收必须具备的条件有()。A.合同约定的各项内容已完成,.各方就合
技术分析OBOS指标是根据股票的上涨家数和下跌家数的比值,得到证券市场多空双方力
最新回复
(
0
)