首页
登录
职称英语
[originaltext] The world’s first completely automatic railway has been built
[originaltext] The world’s first completely automatic railway has been built
游客
2023-09-15
82
管理
问题
The world’s first completely automatic railway has been built under the busy streets of London, The railway is called the Victoria Line, and it is part of the complete London underground railway.
The new Victoria Line was opened in 1969.This new line was very different from the others. The stations on the other lines need a lot of workers to sell tickets, and to check and to collect them when people leave the trains. This is all different on the Victoria Line. Here a machine checks and collects the tickets, and there are no workers on the platforms.
On the train, there is only one worker. If necessary, this man can drive the train. But usually he just starts it; it runs and stops by itself. The trains are controlled by electrical signals which are sent by the so- called "command spots".
The command spots are the same distance apart. Each sends a certain signal. The train always moves at the speed that the command spots allow. If the command spot sends no signals, the train will stop.
Most of the control work is done by computers. The computers also fix the train’s speeds, and send the signals to the command spots.
Other machines make sure that the trains are always a safe distance apart. One train may stay too long at a station; the other trains will then automatically move slower. So there is no danger of accidents on the line.
选项
A、Workers on the platforms and trains were replaced by machines.
B、A completely automatic line was added to its network.
C、It became the first completely automatic railway in the world.
D、Its trains became manual-controlled.
答案
B
解析
What happened to the complete London underground railway thirty-eight years ago?
综合短文中的The world’s first completely automatic railway has been built under the busy streets of London.及and it is part of the complete London underground railway.…was opened in 1969可知,B为答案。
转载请注明原文地址:http://tihaiku.com/zcyy/3017001.html
相关试题推荐
[originaltext]25yearsago,RayAnderson,asingleparentwithaone-year-o
[originaltext]25yearsago,RayAnderson,asingleparentwithaone-year-o
[originaltext]M:Hi,Anna!Welcomeback!HowwasyourtriptotheStates?W:Ve
[originaltext]Waterscootersarewatervehiclesthatlookverymuchlikemot
[originaltext]Articlesinmagazinesandnewspapersandspecialreportsonr
[originaltext]W:Tellme,Peter,whatmakesHarold’ssofamous?M:Well,it’st
[originaltext]W:Tellme,Peter,whatmakesHarold’ssofamous?M:Well,it’st
[originaltext]W:Tellme,Peter,whatmakesHarold’ssofamous?M:Well,it’st
[originaltext]W:Hi,Kevin.M:Hi,Lora,longtimenosee.Whathaveyoubeenu
[originaltext]W:Hi,Kevin.M:Hi,Lora,longtimenosee.Whathaveyoubeenu
随机试题
OnethingisclearafterthetragicdeathofFreddieGray,theyoungAfrican-
Asuperstar【B1】______issomeonewhohasbecomefamousinsports,orfilms,
[originaltext]EducationexpertssayAfrica’sgrowinghighereducationsyste
[originaltext]W:HeyNeal,nowthatthemidtermsareoverabunchofusareget
变动成本计算法与制造成本计算法对()处理方法不同。A.管理费用 B.销售费用
依据GB/T24725-2009,1号普通玻璃珠的技术要求包含()。A.成
最简单经济的补偿是利用管道自身弯管段的弹性来进行补偿,叫作()。A.直接补
用于施工井壁混凝土的模板,其组装后的外沿半径应()。A.较井筒设计净半径大1?4
可靠的早期诊断佝偻病的指标是A.25-(OH)D3降低 B.血浆中cAMP水平
某混凝土工程某月计划工程量为5000m3,计划单价为400元/m3,而实际完成工
最新回复
(
0
)