首页
登录
职称英语
The White House began to be built in 1792, but itwas not completed until te
The White House began to be built in 1792, but itwas not completed until te
游客
2023-09-13
21
管理
问题
The White House began to be built in 1792, but it
was not completed until ten years later. Every American
president lived in it except for George Washington, 【S1】______
although he did have a majority part in designing it. 【S2】______
The government held a competition to choose the best.
design for the president’s house. The winner was a young
man of South Carolina, James Hoban. His design was a 【S3】______
three-level house of stone. And President Washington
made some changes in the winning design. He made the
house long and wider, and changed it into a two-storied 【S4】______
house instead of three.
The second president, John Adams, was first to live 【S5】______
in the White House. When he and his wife moved onto the 【S6】______
new house in November, 1800, work Was still going on,
although the main live area was completed. The whole 【S7】______
work did not finish until the administration of the 3rd
president, Thomas Jefferson.
Twelve years later, the British army invaded
Washington and burned the White House. The fire
completely destroyed the inside of the building and experts
said the White House was so dangerous to live in. Later 【S8】______
on workers rebuilt the inside of the White House. More
offices were added, most of which underground. 【S9】______
None of the work, however, changed the appearing of 【S10】______
the building. Many people asked why the president’s
house is called the White House. Historians say it has
been so called simply because it was painted white. [br] 【S7】
选项
答案
live→living
解析
live(a)意为“活着的”,而“living”则是“适于居住的”、“生活的”。the living area意为“适于居住的地区”。
转载请注明原文地址:http://tihaiku.com/zcyy/3010787.html
相关试题推荐
TheWhiteHousebegantobebuiltin1792,butitwasnotcompleteduntilte
TheWhiteHousebegantobebuiltin1792,butitwasnotcompleteduntilte
TheWhiteHousebegantobebuiltin1792,butitwasnotcompleteduntilte
TheWhiteHousebegantobebuiltin1792,butitwasnotcompleteduntilte
TheWhiteHousebegantobebuiltin1792,butitwasnotcompleteduntilte
TheWhiteHousebegantobebuiltin1792,butitwasnotcompleteduntilte
TheWhiteHousebegantobebuiltin1792,butitwasnotcompleteduntilte
TheWhiteHousebegantobebuiltin1792,butitwasnotcompleteduntilte
TheWhiteHousebegantobebuiltin1792,butitwasnotcompleteduntilte
TheWhiteHousebegantobebuiltin1792,butitwasnotcompleteduntilte
随机试题
Karlprobably(see)______"StarWars"severaltimesforheknowseverydetailof
Allthewisdomoftheages,allthestoriesthathavedelightedmankindforcent
二、考题解析 【教学过程】 活动一:激趣导入 视频导入,教师出示动
某工程采用固定总价合同,合同执行过程中,在发生()时,发包方才对合同总价做相应调
2019年1月1日甲公司购入乙公司同日发行的3年期公司债券,支付价款1020万元
钻孔灌注桩在钢筋笼制作时,焊接的工艺一般采用()。A、对焊 B、搭接焊
某女性患者,头昏、乏力、面色苍白1年余,体检除贫血貌外,无特殊发现。血象HB75
申请证券、期货投资咨询从业资格的机构,应当具备下列()条件。A:有固定的业务场所
A.国家卫生健康委 B.国家药品监督管理部门会同国家卫生健康委 C.国家药品
下列属于密闭式盾构的是()。A.土压式盾构 B.手掘式盾构 C.半
最新回复
(
0
)