首页
登录
职称英语
More than two million people in Europe now have fibre broadband direct to t
More than two million people in Europe now have fibre broadband direct to t
游客
2023-09-08
61
管理
问题
More than two million people in Europe now have fibre broadband direct to their home, suggests a survey.
The latest figures on superfast broadband delivered by fibre to the home (FTITI) shows 18% growth over the last survey compiled in late 2008. The continued growth suggests that the global economic downturn has not hit plans to build infrastructure (基础设施) of fibre. Sweden tops the list of nations rolling out the technology, with 10.9% of its broadband customers using fibre.
Karel Helsen, president of Europe’s Fibre-To-The-Home Council, said the growth matched predictions that were revised when the credit crunch (信用紧缩) started to make itself felt. "The numbers in 2009 are in line with the latest forecasts," said Mr. Helsen.
By 2012, the FITH Council expects that 13 million people across 35 European nations will have their broadband delivered by fibre. Such services would start at speeds of 100 megabits persecond (mbps), said Mr.Helsen.
Around Europe more than 233 projects were underway to lay the fibres that would connect homes or buildings to the net, said Mr.Helsen.Many of those, he said, were being operated by local governments or smaller net firms. Local governments were interested in FTFH because of the economic and social benefits it brought in its wake. The low delay inherent in high-speed fibre networks made possible novel uses of broadband, he said.
"No delay is very important," he said, "specifically if you talk about applications that are time dependent such as personal communications, conference calls or video calls where delays cause a lot of interference."
While early PITH services were concentrated in cities, said Mr. Helsen, many more were reaching out to rural areas for e-health and e-learning projects.
Separate studies show that an FTI’H infrastructure can have a direct impact on local economic output, said Mr.Helsen.
The UK, France and Germany have yet to break into the list of top ten PITH nations. [br] What was done to the predictions about the growth when the credit crunch emerged?
选项
答案
They were revised./The predictions were revised
解析
题干中的emerged对应原文的started to make itself felt,由此可知,当信用紧缩开始显露出来时,以前的预测(prediction)“被修改”了,所以应回答They were revised./The predictions were revised.
转载请注明原文地址:http://tihaiku.com/zcyy/2994889.html
相关试题推荐
Directions:Forthispart,youareallowed30minutestowriteacompositionon
Mostpeoplewouldbe【C1】______bythehighqualityofmedicine【C2】______to
Mostpeoplewouldbe【C1】______bythehighqualityofmedicine【C2】______to
Mostpeoplewouldbe【C1】______bythehighqualityofmedicine【C2】______to
Mostpeoplewouldbe【C1】______bythehighqualityofmedicine【C2】______to
Mostpeoplewouldbe【C1】______bythehighqualityofmedicine【C2】______to
Mostpeoplewouldbe【C1】______bythehighqualityofmedicine【C2】______to
Mostpeoplewouldbe【C1】______bythehighqualityofmedicine【C2】______to
Mostpeoplewouldbe【C1】______bythehighqualityofmedicine【C2】______to
Mostpeoplewouldbe【C1】______bythehighqualityofmedicine【C2】______to
随机试题
【教学过程】 (一)激趣导入 首先由老师给同学变个折纸小魔术:利用纸板制作一把椅子,问这像生活中的什么用品?(椅子)从而引出课题。 (二)直观感知 1.
电容是()元件,电容上的电压()A.耗能、记忆 B.储能、无记忆 C.储能
A.Ⅰ级 B.Ⅱ级 C.Ⅲ级 D.IV级 E.Ⅴ级对药物能控制的轻度高血
扁桃体切除术后出现继发性出血,常发生于()A.术后1~2天 B.术
脑性瘫痪最常见的类型是()A.混合型 B.痉挛型 C.手足徐动性型
某建设项目由厂房、办公楼、宿舍等单项工程组成,则单项工程综合概算中的内容有()
( )属于企业人力资源管理的职能。A.吸收、录用 B.培养、教育 C.保持
下列选项中,属于清末修律过程中引进的先进制度有( )。 A.假释 B.保释
(2022年真题)建设工程在竣工验收时达到规定的指标,且在规定的使用期内保持正常
计算土地增值税时,允许从房地产转让收入中扣除的项目有()。A.取得土地使用权支
最新回复
(
0
)