首页
登录
职称英语
The Golden Gate Bridge opened to vehicle traffic on May 28, 1937. It had the
The Golden Gate Bridge opened to vehicle traffic on May 28, 1937. It had the
游客
2023-08-20
49
管理
问题
The Golden Gate Bridge opened to vehicle traffic on May 28, 1937. It had the longest suspension span in the world, at the time it was built. The suspended roadway【B1】_____1 280 meters between the bridge’s two tall towers. Today it still rates among the top ten longest bridge spans【B2】_____.
Mary Currie works for the Golden Gate Bridge, Highway and Transportation District. She says the bridge is one of the most【B3】_____engineering projects of all time.
The Golden Gate Bridge【B4】_____the Golden Gate Strait. That narrow passage of water connects the San Francisco Bay to the Pacific Ocean. Joseph Strauss was the chief engineer of the Golden Gate Bridge project. Work began in 1933. The project took four years to【B5】_____. The bridge is 2 788 meters long from one end to the other. It is 27 meters wide. Two large cables【B6】_____ over the top of the bridge’s towers. Two hundred fifty pairs of vertical suspender ropes connect the support cables to the suspension bridge. This is part of what【B7】_____the bridge to move up and down by nearly five meters.
Architect Irving Morrow【B8】_____ the bridge’s bright orange color. The Navy wanted the bridge painted in yellow and black. The Air Force had suggested red and white.
Mary Currie says we were【B9】_____that Irving Morrow knew that that color would blend with the environment, it would contrast with the ocean and the air above, and it would also allow the Art Deco styling to really【B10】______. [br] 【B6】
选项
答案
pass
解析
根据空格所在位置可知,空格处应填入谓语动词(词组)。结合录音可填入pass,意为“越过”。
转载请注明原文地址:http://tihaiku.com/zcyy/2942164.html
相关试题推荐
TheGoldenGateBridgeopenedtovehicletrafficonMay28,1937.Ithadthe
TheGoldenGateBridgeopenedtovehicletrafficonMay28,1937.Ithadthe
TheGoldenGateBridgeopenedtovehicletrafficonMay28,1937.Ithadthe
TheGoldenGateBridgeopenedtovehicletrafficonMay28,1937.Ithadthe
TheGoldenGateBridgeopenedtovehicletrafficonMay28,1937.Ithadthe
TheGoldenGateBridgeopenedtovehicletrafficonMay28,1937.Ithadthe
[originaltext]W:Iheardthattherewasaproblemwhenthebridgeopenedtothe
[originaltext]W:Iheardthattherewasaproblemwhenthebridgeopenedtothe
[originaltext]W:Iheardthattherewasaproblemwhenthebridgeopenedtothe
[originaltext]W:Iheardthattherewasaproblemwhenthebridgeopenedtothe
随机试题
Mosttrains______longdistanceshaveadiningcarandaclubcarwhererefresh
[originaltext]W:I’msorrytohavekeptyouwaiting.M:That’sallright.I’veb
Iamhonoredandhumbledtostandhere,wheresomanyofAmerica’sleadersha
《等待戈多》是()戏剧的代表作品。A.表现主义 B.存在主义 C.象征主义
体现磁场能量的二端元件是()。A.电容元件 B.电阻元件 C.电感元件
患者,女性,32岁。发热、多关节疼痛、双侧胸腔积液、尿蛋白(+)半年。实验室检查
创立解析几何的主要数学家是()。A、笛卡儿、费马 B、笛卡儿。拉格朗日 C
双胎妊娠错误的描述是A、容易发生胎盘早剥 B、容易发生产后出血 C、容易发生
A.12μg B.3μg C.6μg D.2μg E.150μg中药注射
根据《标准设计施工总承包招标文件》通用条款的规定,如果工程延期竣工,承包人有义务
最新回复
(
0
)