首页
登录
职称英语
[originaltext] It is barely half a century since parts of the Thames were de
[originaltext] It is barely half a century since parts of the Thames were de
游客
2023-08-17
79
管理
问题
It is barely half a century since parts of the Thames were declared "biologically dead" because the river was so dirty. But with the water now cleaner than at any time in living memory, entrepreneurs want to build a £10 million open-air swimming pool in the middle of the Thames in Central London.
(12)Purification specialists from Germany—which has the highest water cleanliness standard in Europe— have designed a system which the scheme’s backers say will ensure that bathing is safe for visitors of all ages.(13)Health concerns have been raised about the project because of sewage overflows during heavy rain and the unpleasant experience of comedian David Walliams during a 140-mile charity swim in 2011. But experts from German firm Polyplan, which has built natural swimming pools all over Europe, have come up with a solution. Tim Evans, director of British firm Gartenart, which is working on the project, said the water will be "as clean as anything you would find in a mountain lake".
(14)The open air swimming pool will have changing rooms, a 130ft slope leading from the shore to the water, a plunge pool and a children’s paddling area, while a 4ft-high glass partition will protect swimmers from waves caused by river traffic.(15)Chris Romer-Lee, of Studio Octopi—the London architects behind the scheme—said he hoped an initial £300,000 to cover consultancy costs and other fees, which would be raised by crowd-funding, where members of the public can contribute to community schemes. If planning permission is granted, the pool could open late next year.
Questions 12 to 15 are based on the passage you have just heard.
12. What can be learned about Germany?
13. What do people concern about the project?
14. What is the function of the glass partition?
15. Where is the money of the project likely to come from?
选项
A、German environment agencies.
B、The city of London.
C、State government.
D、Public donation.
答案
D
解析
转载请注明原文地址:http://tihaiku.com/zcyy/2935257.html
相关试题推荐
[originaltext]Therehavebeenmanygreatinventions,thingsthatchangetheway
[originaltext]Tobeaddictedtocigarettesmeansthatyourbodycomestoneedt
[originaltext](16)Lionsprefertoeatwithouthavingtodomuchwork.Whenres
[originaltext](16)Lionsprefertoeatwithouthavingtodomuchwork.Whenres
[originaltext]M:Hello,Miss.Whatbringsyouheretoday?W:(13)Iamnotfeel
[originaltext]M:Hello,Miss.Whatbringsyouheretoday?W:(13)Iamnotfeel
[originaltext]M:Hello,Miss.Whatbringsyouheretoday?W:(13)Iamnotfeel
[originaltext]W:Hi.M:Hi,I’mgoingdoortodoortonighttotellpeopleabout
[originaltext]W:Hi.M:Hi,I’mgoingdoortodoortonighttotellpeopleabout
[originaltext]W:IheardMarilyn’sgoingtocollege.What’sshestudying?M:Sh
随机试题
Munich’sfirst"Oktoberfest"everwasheldin1810tocelebratearoyalwedd
实现二分查找(折半查找)时,要求查找表()A.顺序存储,关键码无序排列 B
A.开场技术 B.倾听技术 C.引导技术 D.终止技术 E.接纳与反映技
未持有、未附有人工繁育许可证、批准文件的副本或者专用标识出售、购买、利用、运输、
患者,女,21岁。食鱼虾后皮肤出现片状风团,瘙痒异常。治疗取神阙穴,所用的方法是
李老师在学生晓敏的评价表上这样写道“该生在校尊敬师长、团结同学、乐于助人,学习成
某办公楼柱下扩展基础,平面尺寸为3.4m×3.4m,基础埋深为1.6m,场地土层
未经国家有关主管部门批准,擅自设立商业银行、证券交易所、期货交易所、证券公司、期
不作内服的药物是A.升药 B.砒石 C.斑蝥 D.大蒜 E.马钱子
下列属于项目实施过程中项目目标的动态控制的第二步的是()。A.将项目进行分解
最新回复
(
0
)