首页
登录
职称英语
The most pressing nuclear energy issue is the disposal of nuclear waste. Eve
The most pressing nuclear energy issue is the disposal of nuclear waste. Eve
游客
2023-07-18
58
管理
问题
The most pressing nuclear energy issue is the disposal of nuclear waste. Even if all the reactors in existence were completely safe to operate, there would still be unsolved issue of what to do with the waste from generating electricity by means of nuclear energy. Those who claim that they feel comfortable with nuclear energy are, none the less, concerned about waste disposal methods. Seven states, including California, have put the building of nuclear plants on hold until legislators are convinced that there is a safe way to dispose of the radioactive waste from the plants.
In the meantime, pools of liquid waste and piles of solid waste from private industry and governmental bomb production grow. Since 1962, the volume of radioactive waste produced by the nuclear power industry has amounted to about 4,300 cubic meters. By the end of the twentieth century, if production continues at the same rate, there will be 40,000 cubic meters of nuclear waste.
Power plants and bomb-making are not the only sources of waste. Uranium mining and milling operations have dumped 24 million metric tons of radioactive tailing wastes at dumping sites around the nation. At places where uranium is currently milled, there is another 100 million metric tons of tailings. Uranium tailings are solid materials in the slurry (or watery mixture) of depleted ore-bearing rock, chemicals, and liquids that result from milling. Usually, the slurry is piped to holding ponds. When a uranium mill goes out of business, the ponds are left to evaporate, uncovering piles of dried tailings. Uncovered piles of tailings give off radioactive radon gas. Once in the air, the gas finds its way into the water supply and the food chain. Consequently, many nuclear experts agree that uranium mill tailings may be more dangerous than high-level radioactive wastes from reactors and bombs. [br] According to the passage, the term "uranium mine tailings" refers to ______.
选项
A、the uranium that is taken from a mine
B、the ponds that hold liquid radioactive wastes
C、solid wastes that result from the mining of uranium
D、dangerous radon gas that escapes from uranium mines
答案
C
解析
第三段落第四句对这个短语下了定义:Uranium tailings are solid materials in the slurry(or watery mixture) of depleted ore-bearing rock,chemicals,and liquids that result from milling.tailings的词义可以从它的词根判断出来,在这里是指“残渣,废料”。判断词义要注意词根的意思。
转载请注明原文地址:http://tihaiku.com/zcyy/2847885.html
相关试题推荐
[originaltext]Wednesdaysarethemostdepressingdayoftheweek.(30)Ify
In2010,PamelaFink,anemployeeofaConnecticutenergycompany,madeane
In2010,PamelaFink,anemployeeofaConnecticutenergycompany,madeane
In2010,PamelaFink,anemployeeofaConnecticutenergycompany,madeane
In2010,PamelaFink,anemployeeofaConnecticutenergycompany,madeane
[originaltext]WeexperiencedifferentformsoftheSun’senergyeveryday.
[originaltext]WeexperiencedifferentformsoftheSun’senergyeveryday.
Todaypetroleumprovidesaround40%oftheworld’senergyneeds,mostlyfuel
Solarpowerisonekindofcleanenergiesthatareformsofenergywhichdo
Solarpowerisonekindofcleanenergiesthatareformsofenergywhichdo
随机试题
JapanandRussiacouldlosebetween______oftheirpopulationby2100.A、half-one
[originaltext]M:Hello,isthisAT&T?I’mcallingformyInternetservice.It’s
击出性骨折的典型X线平片表现是A.眶下壁呈帐篷样突出,上颌窦窦腔混浊 B.眶底
菲律宾属于()气候。A.热带雨林 B.热带海洋 C.亚热带季风 D.亚热带
建设工程竣工后,发包人应当根据()及时进行验收。A.投标文件 B.
根据《建筑法》,工程监理人员认为工程施工不符合() 的,有权要求建筑施工企业
下面是一组关于统一战线的材料。 材料一 国民党虽然有许多缺点与错误,然终为
临床各类器官移植疗效最稳定和最显著的是A.肝移植 B.心脏移植 C.肾移植
在个人抵押授信贷款中,以下关于贷后检查的说法,不正确的是()。 A.对正常贷
矿业工程项目招标承包方式的分类包括()。A.按招标内容划分 B.按承包商所处地
最新回复
(
0
)