首页
登录
职称英语
The most pressing nuclear energy issue is the disposal of nuclear waste. Eve
The most pressing nuclear energy issue is the disposal of nuclear waste. Eve
游客
2023-07-06
51
管理
问题
The most pressing nuclear energy issue is the disposal of nuclear waste. Even if all the reactors in existence were completely safe to operate, there would still be unsolved issue of what to do with the waste from generating electricity by means of nuclear energy. Those who claim that they feel comfortable with nuclear energy are, none the less, concerned about waste disposal methods. Seven states, including California, have put the building of nuclear plants on hold until legislators are convinced that there is a safe way to dispose of the radioactive waste from the plants.
In the meantime, pools of liquid waste and piles of solid waste from private industry and governmental bomb production grow. Since 1962, the volume of radioactive waste produced by the nuclear power industry has amounted to about 4,300 cubic meters. By the end of the twentieth century, if production continues at the same rate, there will be 40,000 cubic meters of nuclear waste.
Power plants and bomb-making are not the only sources of waste. Uranium mining and milling operations have dumped 24 million metric tons of radioactive tailing wastes at dumping sites around the nation. At places where uranium is currently milled, there is another 100 million metric tons of tailings. Uranium tailings are solid materials in the slurry(or watery mixture)of depleted ore-bearing rock, chemicals, and liquids that result from milling. Usually, the slurry is piped to holding ponds. When a uranium mill goes out of business, the ponds are left to
evaporate
, uncovering piles of dried tailings. Uncovered piles of tailings give off radioactive radon gas. Once in the air, the gas finds its way into the water supply and the food chain. Consequently, many nuclear experts agree that uranium mill tailings may be more dangerous than high-level radioactive wastes from reactors and bombs. [br] According to the passage, all of the following are sources of radioactive waste EXCEPT______.
选项
A、bomb production
B、nuclear fusion experiments
C、nuclear power plant operation
D、uranium mining operations
答案
B
解析
细节题。作者在第三段提到核废料的来源有:Power plants and bomb-making are not the only sources of waste.Uranium mining and milling operations…显然没有提到B选项的内容,故选B。
转载请注明原文地址:http://tihaiku.com/zcyy/2811850.html
相关试题推荐
[originaltext]Economistsacrosstheworldareexpressingconcernsaboutris
[originaltext]Economistsacrosstheworldareexpressingconcernsaboutris
[originaltext]M:(12)TheEnergyMinisterannouncedyesterdaytheconstructionof
[originaltext]M:(12)TheEnergyMinisterannouncedyesterdaytheconstructionof
[originaltext]Economistsacrosstheworldareexpressingconcernsaboutris
[originaltext]Economistsacrosstheworldareexpressingconcernsaboutris
Themostpressingnuclearenergyissueisthedisposalofnuclearwaste.Eve
Themostpressingnuclearenergyissueisthedisposalofnuclearwaste.Eve
[originaltext]Nuclearradiationhasacertainmysteryaboutit,partlybeca
[originaltext]Nuclearradiationhasacertainmysteryaboutit,partlybeca
随机试题
[originaltext]Peopleenjoytakingtrips.Butwhatarethereasonstheyleav
Labelthemapbelow.WritethecorrectletterA-H,nexttoQuestions11-15.[img
DavidCameronhasnoticedthathealthandsafetyregulationsstopschoolst
人造石的主要成分为A.α-半水硫酸钙 B.β-半水硫酸钙 C.α及β-半水硫
某产品实际销售量为8000件,单价为30元,单位变动成本为12元,固定成本总额为
关于肺的描述中错误的是()A.位于胸膜腔内 B.右肺三叶,左肺二叶 C
根据FIDIC《施工合同条件》,业主与承包商划分合同风险的“基准日”为()。A、
二次衬砌的施作前应满足的条件有()。A、渗水压力不超过设计值的1.1倍 B、
美国建筑师学会(AIA)标准合同体系中,B系列合同文件是关于()之间的合同文
某建设项目监理机构的旁站监理员王某发现乙施工单位在主体结构的施工中有违反工程建设
最新回复
(
0
)