Ravi,like many project( ),had studied the waterfall model of software development as the primary software life-cycle( ).He was all set to use it for an upcoming project,his first assignment.However,Ravi found that the waterfall model could not be used because the customer wanted the software delivered in stages,something that implied that the system had to be delivered and built in( )and not as( ).The situation in many other projects is not very different.The real world rarely presents a problem in which a standard process,or the process used in a previous project,is the best choice.To be the most suitable,an existing process must be( )to the new problem.A development process,even after tailoring,generally cannot handle change requests.Toaccommodate change requests without losing control of the project,you must supplement the development process with a requirement change management process.问题1选项A.customersB.managersC.usersD.administrators问题2选项A.activityB.procedureC.processD.progress问题3选项A.partsB.modulesC.softwareD.a whole问题4选项A.partsB.modulesC.softwareD.a whole问题5选项A.modifiedB.usedC.suitedD.tailored
选项
答案
BCADD
解析
Ravi就像很多研究过以瀑布模型为软件生命周期过程的软件开发项目经理一样,他被安排使用瀑布模型去开发一个即将启动的项目,而且这是他的第一个任务。然而,Ravi发现不能在项目中使用瀑布模型,因为客户想要该软件分阶段交付,而不是作为一个整体交付。
在很多其他的项目中也有类似的情况,现实生活中,本来就很少有能完全按标准来进行处理的问题,可能某标准处理前一个问题非常合适,但处理现在这个问题就不定适合了。最合适的方法就是对一个新的问题必须采用切合它自身的方法。为了适应变化的变更请求而不失去对项目的控制,你必须要支持项目的发展过程与一个需求变更管理过程。
转载请注明原文地址:http://tihaiku.com/congyezige/2419666.html
本试题收录于:
中级 数据库系统工程师题库软件水平考试初中高级分类
中级 数据库系统工程师
软件水平考试初中高级
相关试题推荐
Theprojectworkbookisnotsomuchase
Theprojectworkbookisnotsomuchase
Theprojectworkbookisnotsomuchase
Ravi,likemanyproject( ),hadstudiedt
Theprojectworkbookisnotsomuchase
Aprojectisa[temporary]()ofunique
Aprojectisa[temporary]()ofunique
Aprojectisa[temporary]()ofunique
Theprojectworkbookisnotsomuchase
Aprojectisa[temporary](请作答此空)ofuniqu
随机试题
Weknow【B1】abouttheuniverse.Itmeanstheearth,thesun,themoonandthesta
"Whereisherhusband?""Didn’tyouhear?Hehaslefther.He______herawe
Theyaretryingtoworkouta______totheproblem.A、satisfactionB、solutionC、
当(),检测报告中需要包括有关不确定度的信息。A.不确定度与检测结果的有效
以下哪种疾病易引起肺梗塞A.臁疮 B.脱疽 C.股肿 D.浅静脉炎 E.
A.沙眼衣原体沙眼亚种B.LGV亚种衣原体C.鼠亚种衣原体D.肺炎衣原体E.鹦鹉
非保险转移方法包括()。 A.损失控制 B.集中与分散 C.转移
已知某建筑结构的自振周期大于场地特征周期,在确定地震影响系数时,假设其他条件相同
某船第一次顺流航行21千米又逆流航行4千米,第二天在同一河道中顺流航行12千米,
某期货公司因电网严重故障,无法正常营业,现需要申请停业。该公司申请停业需要提交的
最新回复
(
0
)