The Systems Development LifeCycle (SDLC) is a process of creating or altering information systems, and the models and methodologies that people use to develop these systems. Sequential SDLC models, such as ( ) , focus on complete and correct planning to guide large projects and risks to successful and predictable results.A.WaterfallB.Extreme Programming C.SpiralD.RapiD.Frototyping
选项
A.Waterfall
B.Extreme Programming
C.Spiral
D.RapiD.Frototyping
答案
A
解析
转载请注明原文地址:http://tihaiku.com/congyezige/2299742.html
本试题收录于:
中级 系统集成项目管理工程师题库软件水平考试初中高级分类
中级 系统集成项目管理工程师
软件水平考试初中高级
相关试题推荐
信息物理系统(CPS,Cyber-PhysicalSystems)是一个综合
Unlikemoretraditionalembeddedsystems
Scheduledevelopmentcanrequiretherev
Inprojectmanagementandsystemsengine
TheSystemsDevelopmentLifeCycle(SDLC
TheDevelopmentofProjectManagementPl
信息物理系统(CPS,Cyber-PhysicalSystems)是一个综合计
TheSystemsDevelopmentLifeCycle(SDLC
Scheduledevelopmentcanrequiretherev
Mostoperatingsystemshaveastandard
随机试题
Wewon’tbeabletoleavetheofficeuntiltherain______.A、willstopB、stopsC
Fromhairspraystohairpieces,fromreducingdietstotwenty-four-hourfitne
ProfessorSmith’slivelyandinterestinglecture________myinterestinphilosoph
Peopletodayarestilltalkingaboutthegenerationgap(代沟).Someparentsco
关于稳定土基层,下列说法正确的是()A.直线和不设超高的平曲线段应由内侧向
运用问答法进行教学时,教师的提问应面向所有学生。()
在问题解决情境中,有的儿童倾向于深思熟虑且错误较少,这种认知方式属于()。A.
为了使岗位工作丰富化,应该考虑的因素有( )。A.任务整体性 B.任务多样化
企业自行建造固定资产,已达到预定可使用状态但在年度内尚未办理竣工决算手续时,应按
下列各项中,影响企业未签订销售合同的存货可变现净值的有()。A.市场价格 B
最新回复
(
0
)