首页
登录
职称英语
Engineering for sustainable developmentThe Greenhouse Project (Himalayan mounta
Engineering for sustainable developmentThe Greenhouse Project (Himalayan mounta
游客
2025-02-10
8
管理
问题
Engineering for sustainable development
The Greenhouse Project (Himalayan mountain region)
Problem
Short growing season because of high altitude and low【L31】________
Fresh vegetables imported by lorry or by【L32】________ , so are expensive
Need to use sunlight to prevent local plants from【L33】________
Previous programmes to provide greenhouses were【L34】________
New greenhouse
Meets criteria for sustainability
Simple and【L35】________ to build
Made mainly from local materials (mud or stone for the walls, wood and【L36】________ for the roof)
Building and maintenance done by local craftsmen
Relies solely on【L37】________energy
Only families who have a suitable【L38】________can own one
Design
Long side faces south
Strong polythene cover
Inner【L39】________ are painted black or white
Social benefits
Owners’ status is improved
Rural【L40】________ have greater opportunities
More children are educated [br] 【L32】
Good afternoon. This is the first of a series of lectures I’ll be giving about engineering for sustainable development. I’ll be presenting examples of engineering projects from a variety of contexts, and today I’m going to talk about a project to design a new kind of greenhouse for use in the Himalayan mountain regions.
First of all, I’ll tell you about the problem which was the context for this project. In the Himalayan mountains, fresh vegetables and other crops can only be grown outside for about ninety days, during the summer, because the altitude of the region is around 3500 metres, and
because the rainfall is so low.
In winter, temperatures fall below minus 25 degrees Celsius, so fresh vegetables have to be imported. They arrive by truck in summer or
by air in winter,
which makes them expensive. Local people rely on dried leafy vegetables and stored root crops during the winter, and rarely eat fresh vegetables.
But despite the sub-zero temperatures, the skies over the region are cloudless, and there are over three hundred sunny days per year. So an engineering solution was needed, to exploit the sun’s energy and
protect locally produced plants from freezing during winter.
And in fact,
there has been programmes in the past to provide greenhouses, but these were unsuccessful.
The greenhouses weren’t adapted for local conditions, so they tended to fall into disuse.
So, a few years ago, a project was initiated to design a better greenhouse, one which would meet the criteria for sustainability.
So, what are the criteria for sustainability? Well, first of all, the new greenhouse is designed to be relatively simple,
so construction is cheap.
Locally available materials are used wherever possible. The walls are generally constructed of mud bricks, made locally, although in areas of high snow-fall more resilient walls of stone are needed. Rammed earth is also used. The main roof is generally made from locally available poplar wood,
with water-resistant local grass for the covering.
In addition, the construction and maintenance of the greenhouse are done by local craftsmen. So local stone masons are employed to build the greenhouse walls, and specialised training is provided for them wherever necessary.
Then...
the greenhouse is designed to run on solar power alone,
there’s no supplementary heating. And lastly, families are selected to own one of the new greenhouses with great care.
They have to have a site which is suitable for constructing it on.
They also have to be keen to make a success of using it, and also to share the produce with the wider community through sale or barter. Potential owners are taken to see existing greenhouses before they make a final decision about having one.
So, those are the features which make the project sustainable. And now I’ll briefly describe the design of the greenhouse. The greenhouses are orientated very carefully along an East-West axis so that there’s a long south-facing side. The transparent cover on the south-facing side is made from a heavy-duty polythene, which should last for at least five years.
On the inside of the greenhouse, the walls are painted
— the rear and west-facing walls are black, to improve heat absorption, but the east-facing wall is white to reflect the morning sunlight onto the crops inside. Finally, there’s a door in the wall at one end, and vents are incorporated into the roof, the door and the wall at the other end, to enable control of humidity and prevent overheating.
I’ll turn now to the benefits which have resulted from the introduction of these new greenhouses. These benefits are of various kinds, but for now I’ll just mention the social benefits.
First of all, people who own a greenhouse gain social standing in their communities, because they provide vegetables for the wider community, for regular consumption as well as for festivals, and they also earn income. Secondly,
because in rural areas it is women who usually grow the food, the greenhouses have increased their opportunities.
They bring the benefits of improved nutrition, and increased family income, from the sale of surplus produce. And thirdly, as a result of their improved financial position, some families can now afford to educate their children for the first time.
选项
答案
air
解析
空格前的or连接两个并列的介词短语,推测应填入一个名词。录音原文中的by truck是题目by lorry的同义替换,根据后文的并列词提示可直接填入air。
转载请注明原文地址:https://tihaiku.com/zcyy/3950939.html
相关试题推荐
EngineeringforsustainabledevelopmentTheGreenhouseProject(Himalayanmounta
EngineeringforsustainabledevelopmentTheGreenhouseProject(Himalayanmounta
EngineeringforsustainabledevelopmentTheGreenhouseProject(Himalayanmounta
EngineeringforsustainabledevelopmentTheGreenhouseProject(Himalayanmounta
Theprojectwillbeastudyoftheincreasein___________________.olderworkers
Whatproblemsdothespeakersidentifyforthisproject?ChooseSEVENanswersfr
Whatproblemsdothespeakersidentifyforthisproject?ChooseSEVENanswersfr
Whatproblemsdothespeakersidentifyforthisproject?ChooseSEVENanswersfr
Whatproblemsdothespeakersidentifyforthisproject?ChooseSEVENanswersfr
Whatproblemsdothespeakersidentifyforthisproject?ChooseSEVENanswersfr
随机试题
Cynicsbelievethatpeoplewho____complimentsdosoinordertobepraisedtwi
Forwelloveracentury,onestreetinNewYorkCityhasbeenknownforthe
2015年初,某锌加工企业与贸易商签订了一批两年后实物交割合同的销售合同,为规避锌价格风险,该企业卖出ZN1604.至2016年1月,该企业进行展期,合理的操作
形成酸雨的主要污染物是A.CO和NO B.CO和O C.NO和CO D.H
左侧卵巢动脉可来自:A、左髂内动脉 B、左肾动脉 C、左髂外动脉
下列关于神经中枢内兴奋传递的叙述中,错误的是:A.总和 B.中枢延搁 C
患者男,16岁。哮喘发作入院,血气分析:pH7.49,PCO228.6mmHg
护理观察,该患者最可能发生心律失常是A、窦性心动过缓 B、室性期前收缩 C、
在合同期限错配表中,银行在特定时间内期限错配金额是指()。A.资产方的资金流入加
银行承兑汇票的承兑银行,应当按照票面金额向出票人收取()的手续费。A:千分之一
最新回复
(