首页
登录
职称英语
Problem Description of the Flood Early Warning SystemVocabulary and Expressions
Problem Description of the Flood Early Warning SystemVocabulary and Expressions
游客
2025-01-26
1
管理
问题
Problem Description of the Flood Early Warning System
Vocabulary and Expressions
physically-based algorithm deploy populace
calibrate adaptive illiterate fuse [br] Current flood prediction relies on physically-based models and significant computation power.
The Problem Description of the Flood Early Warning System
In developing countries, warning communities of an incoming flood is an expensive proposal given their limited resources. The equipment necessary for early warning flood systems is expensive and centralized to support flood detection schemes that are computationally complex. This project explores new techniques for distributing the computation of flood detection within a wireless sensor network, grounding the research in reality through the design and installation of an early warning system for flooding in a developing country.
Sensor networks for flooding do not exist in a real-time automated capacity within developing countries. We are developing such a sensor network and examining how to distribute and adapt the flood prediction calculation. Current flood prediction relies on physically-based models requiring large amounts of data in order to calibrate the model, and significant computation power to compute the model. Neither of these being feasible on a sensor network as data,storage and computing power are limited, we are working on statistical algorithms capable of online, distributed computation.
Given a suite of robust adaptive distributed algorithms for flood warning, we are planning to implement these algorithms on a system that can be deployed within a developing country. This poses a number of challenges, ranging from survival in harsh flood environments, lack of trained personnel to maintain the system, and an illiterate populace to warn. Designing and implementing a system that addresses these issues poses interesting engineering problems. Key research questions here include: How does each sensor node measure its environment? How does each sensor communicate with the rest of the network, and convey its ongoing status given the worst weather conditions possible on a river? How and where should the information from the sensors be processed and fused?
选项
A、正确
B、错误
答案
A
解析
该表述是对原文相关内容的同义表述,因此本题正确。
转载请注明原文地址:https://tihaiku.com/zcyy/3929718.html
相关试题推荐
Theonlyproblemwiththedebatelastweekwasthatthebeginningsoundedmorel
Thecentralproblemofeconomicsistosatisfythepeople’sandnation’swan
Thecentralproblemofeconomicsistosatisfythepeople’sandnation’swan
Thecentralproblemofeconomicsistosatisfythepeople’sandnation’swan
Thecentralproblemofeconomicsistosatisfythepeople’sandnation’swan
Thecentralproblemofeconomicsistosatisfythepeople’sandnation’swan
Thecentralproblemofeconomicsistosatisfythepeople’sandnation’swan
Thecentralproblemofeconomicsistosatisfythepeople’sandnation’swan
Thecentralproblemofeconomicsistosatisfythepeople’sandnation’swan
Thecentralproblemofeconomicsistosatisfythepeople’sandnation’swan
随机试题
ThegraphshowsthechangesofJapaneseaveragemonthlysalaryfrom1953to
GriffithworkedforafirmthatspecializedineconomicdevelopmentinWashingto
甲公司为一家在上海证券交易所上市的股份有限公司,主要从事基建建设、勘察设计与咨询
现认为强心苷的作用机理为()A. B. C.增加心肌细胞内的cAMP
根据我国《行政诉讼法》的有关规定,人民法院审理行政案件,依法实行( )制度。A
实行()的物业服务收费,完全由业主与物业服务企业按照市场原则自由协商价格并在物业
A.中药饮片 B.血液制品 C.中成药 D.口服泡腾剂根据医疗保险用药管理
下列行为中,属于民事法律制度相关规定中的滥用代理权的有()。A.代理人甲以
国际金融组织,如世界银行不主张采用()计算工程咨询费用,认为不利于降低工程成本。
可行性研究阶段流动资金应按分项详细估算法进行估算,流动资产估算时,流动资产包括(
最新回复
(
0
)