首页
登录
职称英语
A. recent B. capacity C. milestone D. resources E. successF. checked G. shoestr
A. recent B. capacity C. milestone D. resources E. successF. checked G. shoestr
游客
2024-09-07
23
管理
问题
A. recent B. capacity C. milestone D. resources E. success
F. checked G. shoestring H. objective I. current J. record
K. monitored______L. deposits______M, scarce______ N. ambitious O. resolution
Just in time for India’s Independence Day, the country’s first interplanetary mission has sent back beautiful images of the Red Planet’s surface.
The Indian Space Research Organisation’s Mars Orbiter Mission was launched in November 2013 on a 【C1】______ budget compared with other space missions. All up, it’s estimated that it cost about $74 million, compared with NASA’s $671 million Maven Mars orbiter mission, which launched around the same time.
India’s mission, also known as Mangalyaan, has been something of a【C2】______ story for the country’s space agency. It is India’s first attempt at an interplanetary mission — and an【C3】______ one. Mars serves as the next major【C4】______ in space exploration, and India is the first country to succeed in reaching the planet’s orbit in its first attempt. More than half of all attempts to reach Mars fail, and India not only got it right on its first try, but it did so at【C5】______ low cost.
Mangalyaan reached Mars orbit in September 2014. Since then it has【C6】______ the planet, studying its atmosphere and particle environment. It’s also been surveying the surface of Mars, sending back images taken with its Thermal Infrared Spectrometer and tricolour Mars Colour Camera.The most【C7】______ one, snapped on July 19, shows a portion of the Ophir Chasma, a deep canyon about 317km long and 62km wide.
Ophir Chasma is part of the largest canyon system in the solar system known as Valles Marineris. The walls of the chasma contain many layers and the floors contain large【C8】______ of layered materials. This image was taken at an altitude of 1,857 km with a【C9】______ of 96 megapixels.
The project’s primary【C10】______, while also aimed at collecting data from Mars, is to serve as a demonstration of India’s ability to develop and implement interplanetary space technology. [br] 【C5】
选项
答案
J
解析
(record)选择依据有两个:1.上下文,即$74 million与$671 million的巨大差异;2.介词词组(at record low/high cost)的常用搭配,at record low/high cost表示“以创纪录的底/高成本”,如:Royal Dutch Shell has announced it is producing natural gas at record low cost in China.
转载请注明原文地址:https://tihaiku.com/zcyy/3747420.html
相关试题推荐
(1)TodayisamajormilestoneforMicrosoftasweholdourfirstProfessiona
A.recentB.capacityC.milestoneD.resourcesE.successF.checkedG.shoestr
A.recentB.capacityC.milestoneD.resourcesE.successF.checkedG.shoestr
A.recentB.capacityC.milestoneD.resourcesE.successF.checkedG.shoestr
A.recentB.capacityC.milestoneD.resourcesE.successF.checkedG.shoestr
A.recentB.capacityC.milestoneD.resourcesE.successF.checkedG.shoestr
(1)Yetthisbuoyancyischeckedbyequallypotentanxieties.Germany’sbest-
Recentlymanyschoolshavefacedwhatcouldbecalledthecrisisofcomprehensio
(1)Asrecentlyas50yearsago,economistsregardedthevitalityoftheecon
(1)Asrecentlyas50yearsago,economistsregardedthevitalityoftheecon
随机试题
Unlesswespendmoneytospotandpreventasteroids(小行星)now,onemightcras
Tomsaidthathewouldn’tmind______.A、towaitforusB、waitingforusC、waitf
Peoplelikebeingtrusted.Theyareannoyed,angry,orfeelhurtiftheyare
W:I’mtakingthetraindowntowntogoshopping.M:________A、Well,you’dbetter
[originaltext]W:IknowyouandJaneusedtodoeveiythingtogether.Ithought
A.下颌升支外侧 B.下颌升支前缘向上 C.下颌磨牙舌侧后下方和下颌支内侧面
股东大会决议的事项分为普通事项与特别事项两类,其中特别事项包括( )。A.修改
下列关于行业风险分析的说法,正确的是( )。A.目的在于识别同一行业所有企业面
建设工程组织依次施工时,其特点包括( )。 A、没有充分地利用工作面进行施工
(2018年真题)甲乙签订了一份供货合同。合同约定甲先供货,乙后付款。在供货前,
最新回复
(
0
)