首页
登录
职称英语
The following are the conditions of cancellation and termination of the cont
The following are the conditions of cancellation and termination of the cont
游客
2024-07-07
15
管理
问题
The following are the conditions of cancellation and termination of the contract.
1. Both parties should abide by the contract and should refrain from revising, canceling, or terminating the contract without mutual consent.
2. The contract can be revised, canceled, or terminated with mutual consent. Before both parties have reached an agreement, the contract should be strictly observed.
3. Party A has the right to cancel the contract with a written notice to Party B under the following conditions:
(1) Party B does not fulfill the contract or does not fulfill the contract obligations according to the terms stipulated, and has failed to amend after Party A has pointed it out.
(2) According to the doctor’s diagnosis, Party B cannot resume normal work after a continued 30 days sick leave.
4. Party B has the right to cancel the contract with a written notice to Party A under the following conditions:
(1) Party A has not provided Party B with necessary working and living conditions as stipulated in the contract.
(2) Party A has not paid Party B as scheduled.
1. Both parties should refrain from revising, canceling, or terminating the contract without mutual consent, but it can be revised, canceled, or terminated with【46】.
2. If Party B does not fulfill the contract or does not fulfill the contract obligations according to the terms stipulated, and has failed to amend after Party A has pointed it out, Part A has the right【47】with a written notice to Party B; or if Part B is badly sick, who cann’t continue to work after asking for a continued【48】, Part A also has the right to cancel the contract with Party B. On the other hand, if the【49】for Part B is not the same as the one stipulated in the contract, or Party A has not【50】as scheduled, Party B has the right to cancel the contract with Party A.
[br]
选项
答案
to cancel the contract
解析
转载请注明原文地址:https://tihaiku.com/zcyy/3667023.html
相关试题推荐
Whenyouhaveaproblemwithyourcomputer,werecommendthefollowingtroub
Itisnecessarytohaveagoodunderstandingofallthetermsandconditionsbef
ThefollowingcontainsthemaininformationofanoticeofthePublicRelations
Thefollowingaretheinstructionsfortheprinterterms.Afterreadingit,you
Thefollowingaretheinstructionsfortheprinterterms.Afterreadingit,you
Thefollowingaretheinstructionsfortheprinterterms.Afterreadingit,you
Thefollowingaretheinstructionsfortheprinterterms.Afterreadingit,you
Thefollowingisanadvertisement.Afterreadingit,youarerequiredtocomplet
Thefollowingisanadvertisement.Afterreadingit,youarerequiredtocomplet
Thefollowingisanadvertisement.Afterreadingit,youarerequiredtocomplet
随机试题
Childrenobesitymountsasjunkfoodpurveyorsbombardchildrenwithadvertising
ThePeakTimeforEverythingA)Could
超过一定规模的危险性较大的分部分项工程专项方案应当由()组织召开专家论证会
图示连续梁,EI=常数,欲使支承B处梁截面的转角为零,比值a/b应为: A.
莲子与芡实的共同功效是A.益气生津,补脾止泻,止带B.益肾固精,补脾止泻,止带C
Thechangeinthatvillagewasmiraculou
端子排的二次线必须穿有清晰的标号牌,清楚注明二次线的端子排号及二次回路号。
项目管理承包模式(PMC)是一种()模式。A.由专业化机构进行项目管理 B.公
建设工程勘察合同管理中,勘察人更换项目负责人应事先得到发包人同意,并应在更换(
患者男性,16岁。发热5天,伴乏力、食欲缺乏、恶心、尿黄1天。有不洁饮食史。查体
最新回复
(
0
)