首页
登录
职称英语
[audioFiles]audio_eusz200812_001(20091)[/audioFiles]A、The building of the dam n
[audioFiles]audio_eusz200812_001(20091)[/audioFiles]A、The building of the dam n
游客
2024-06-18
37
管理
问题
选项
A、The building of the dam needs a large budget.
B、The proposed site is near the residential area.
C、The local people feel insecure about the dam.
D、The dam poses a threat to the local environment.
答案
C
解析
M: Do you understand why the local people are opposed to the new dam up the river?
W: They are worried about the potential danger if the dam should break. The river is very wide above the proposed site.
Q: What do we learn from the conversation?
本题为替换题——语义替换。男士问为什么当地居民反对在河上建造堤坝。女士回答“They are worried about the potential danger if the dam should break. The river is very wide above the proposed site.”(当地居民担心堤坝断裂的潜在风险,因为提议修坝的地点河面非常宽)。所以C项是正确答案。
转载请注明原文地址:https://tihaiku.com/zcyy/3639778.html
相关试题推荐
[audioFiles]audio_eusz200812_001(20091)[/audioFiles]A、Thebuildingofthedamn
[audioFiles]audio_eusz200812_001(20091)[/audioFiles]A、UrgeJennytospendmore
[audioFiles]audio_eusz200812_001(20091)[/audioFiles]A、Fixingsomefurniture.B、
[audioFiles]audio_eusz200812_001(20091)[/audioFiles]A、Consultherdancingteach
[audioFiles]audio_eusz200812_001(20091)[/audioFiles]A、Heisquiteeasytorecog
[audioFiles]audio_eusm_j92_001(20082)[/audioFiles]A、Itwasn’tverywelldesigne
[audioFiles]audio_eusm_j92_001(20082)[/audioFiles]A、Englishteachersusuallyli
[audioFiles]audio_eusm_j92_001(20082)[/audioFiles]A、Tomisalwayslate.B、Tomw
[audioFiles]audio_eusm_j24_001(20082)[/audioFiles]A、Heisseeingapopularfilm
[audioFiles]audio_eusm_j24_001(20082)[/audioFiles]A、Anoperator.B、Asecretary.
随机试题
Hewashelped______thefloor.A、tosweepingB、sweepC、tosweepCbehelpedtodo
[originaltext]M:Hurryup,dear.Themoviewillstartat7:40p.m.Weonlygot
[originaltext]Wecanagreewithprimitivemanthatfoodisabasicneed,but
浑善达克沙地是距北京最近的大沙地,距北京不足200公里。对北京影响最大的系列风沙
在下列选项中,属于暗室里看到一个静止光点移动的知觉现象是()。A.似动
基金销售机构关于客户档案管理与保密的实务操作不包括( )。A.建立严格的基金份
按照标的资产分类,权证的分类不包括()。A.股权类权证 B.债权类权证
对公司的分析可以分为()。A:公司基本分析B:公司财务分析C:市场分析D:
(2019年真题)下列工程项目目标控制方法中,可用来控制工程造价和工程进度的方法
预应力筋张拉的实际伸长值,ΔLs(㎜),可按下式计算ΔLs=ΔL1+ΔL2,式中
最新回复
(
0
)