首页
登录
职称英语
Years before President Bill Clinton came to Washington with his campaign ple
Years before President Bill Clinton came to Washington with his campaign ple
游客
2024-06-07
13
管理
问题
Years before President Bill Clinton came to Washington with his campaign pledge to spend an additional $20,000 million annually on America’s infrastructure "to develop the world’s best communication, transportation, and environmental systems," economists and others were talking about the need to spend more on public works. Their debate has been almost entirely about one question: how much more? Usually overlooked in these in discussions is the real infrastructure dilemma of the 21st century--not how much to spend but how to decide what to build and where to build it.
For several reasons, the old ways of deciding these matters simply do not work anymore. Americans today are far more skeptical about the value of new roads, bridges, and sewage treatment plants especially when they are located in their own. backyards. Their faith that decisions about public works can be safely left in the hands of public officials, engineers, and other technical experts is gone.
Reflecting in 1985 upon the final demise of West way, the proposed highway along Manhattan’s West Side that had been held up for 30 years, Senator Daniel Patrick Moynihan of New York wrote, "There is a kind of stasis that is beginning to settle into our public life. We cannot reach decisions. Central park could not conceivably be built today as it was when there was enough power in government to make the decision. We don’t have that capacity."
The persistence of the public works pork barrel (地方建设经费)—funding blatantly political projects--has also contributed to public skepticism. In the same year that Moynihan decried the death of Westway, local politicians the $1,800 million Tennessee Tombigbee Waterway, recently described by the Atlanta Journal Constitution as "a broken promise." A classic pork barrel project, the waterway carries only one-tenth the commercial barge traffic that had been projected. [br] Tennessee-Tombigbee Waterway was called "a broken promise" became______.
选项
答案
it carries little that had been projected
解析
细节理解题。问题的“结果”在文中最后—段…recently described by the Atlanta Journal Constitution as“a broken promise”,原因是The waterway Carries only one tenth the commercial barge traffic that had been projected.答案中用“little”代替“one tenth the commercial barge traffic”以达到简答目的。
转载请注明原文地址:https://tihaiku.com/zcyy/3623043.html
相关试题推荐
Asthepresidentcan’tcometothenegotiation,Iamauthorizedto______(代表他来签
[originaltext]Yearsagobeforetherewererefrigerators,anicehousewasab
【S1】[br]【S18】A、thoughB、whileC、beforeD、untilB逻辑衔接题。根据上下文可知,咖啡可以使人文思泉涌的同时,也可
【S1】[br]【S8】women--men此处是说,女士通过某种方法改变着澳大利亚的劳动力市场,before说明这种工作以前是男士做的,而非女土做的,故应
Before1965manyscientistspicturedthecirculationoftheocean’swatermas
NeverbeforeinmylifehaveIseenaman__________(如此幽默,竟然把在场的每个人都逗笑了).sohumo
[originaltext]TheAmericansbelievethatanybodycanbecomePresidentofthe
PresidentClintonlatertodayjoins【B1】______presidentsFord,Carterand
PresidentClintonlatertodayjoins【B1】______presidentsFord,Carterand
PresidentClintonlatertodayjoins【B1】______presidentsFord,Carterand
随机试题
Amancanneverhavetoomanyties.A、男人没办法买到太多的领带。B、男人有再多的领带也不为过。C、男人永远别买太多的
[audioFiles]audio_eusm_j91_001(20082)[/audioFiles]A、Sheisnotinterestedinco
WaystoGetaHappyStateofMind
城市防洪标准确定依据是:()A.洪水重现期或非农业人口数量 B.社会经济地
一个产业的竞争程度和产业利润潜力由五个方面的竞争力量反映并决定,即波特的五力模型
下列哪种先天性心脏病的X线检查显示肺动脉段凹陷A:动脉导管未闭 B:法洛四联症
(2020年真题)社会工作者小刘为社区残障老年人配备轮椅,联系轮椅厂家入户调试和
做市商主要靠买卖报价的点差来实现盈利。( )
各级政府编制年度预算草案的依据包括()。A、法律、法规 B、上一年度预算执行情
足月儿生后2天出现黄疸,母亲血型为B型,胎儿O型,3天血清胆红素188.1μmo
最新回复
(
0
)