首页
登录
职称英语
[originaltext] At the beginning of the 20th century, on the Gulf Coast in th
[originaltext] At the beginning of the 20th century, on the Gulf Coast in th
游客
2024-03-10
39
管理
问题
At the beginning of the 20th century, on the Gulf Coast in the US State of Texas, there was a hill where gas leakage was so noticeable that schoolboys would sometimes set the hill on fire. Pattillo Higgins, a disreputable local businessman, became convinced that there was oil below the gassy hill. Oil wells weren’t drilled back then; they were essentially dug. The sand under the hill defeated several attempts by Higgins’ workers to make a proper hole. Higgins had forecast oil at a thousand feet, a totally made-up figure.
Higgins subsequently hired a mining engineer, Captain Anthony Lucas. After encountering several setbacks, Captain Lucas decided to use a drill, and his innovations created the modern oil drilling industry.
In January 1901, at 1,020 feet, almost precisely the depth predicted by Higgins’ wild guess, the well roared and suddenly ejected mud and six tons of drilling pipe out of the ground, terrifying those present. For the next nine days, until the well was capped, the well poured out more oil than all the wells in America combined.
In those days, Texas was almost entirely rural with no large cities and practically no industry; cotton and beef were the foundation of the economy. Higgins’ well changed that. The boom made some prospectors millionaires, but the sudden surplus of petroleum was not entirely a blessing for Texas. In the 1930s, prices crashed, to the point that, in some parts of the country, oil was cheaper than water. That would become a familiar pattern of the boom-or-bust Texas economy.
Questions 12 to 15 are based on the passage you have just heard.
12. What did Texas businessman Pattillo Higgins believe?
13. What prevented Higgins’ workers from digging a proper hole to get the oil?
14. What does the passage say about Captain Lucas’ drilling method?
15. What do we learn about Texas’ oil industry boom?
选项
A、The massive gas underground.
B、Their lack of the needed skill.
C、Their lack of suitable tools.
D、The sand under the hill.
答案
D
解析
事实细节题。由短文可知,当时的油井不是钻取的,基本上是挖出来的。希金斯的工人们几次想挖一个合适的洞都被山下的沙子挫败了。因此答案为D)。
转载请注明原文地址:https://tihaiku.com/zcyy/3521154.html
相关试题推荐
[originaltext]Objectsthatarevibratingmakesounds.Rhythmicsoundvibrations
[originaltext]Objectsthatarevibratingmakesounds.Rhythmicsoundvibrations
[originaltext]Inorderforachemicaltobeconsideredadrug,itmusthavethe
[originaltext]Inorderforachemicaltobeconsideredadrug,itmusthavethe
[originaltext]Inorderforachemicaltobeconsideredadrug,itmusthavethe
[originaltext]Hi,everybody.AsIsaidinmyStateoftheUnionaddress,weliv
[originaltext]IntheUnitedStates,manypeopleoncelivedinlarge,two-and-th
[originaltext]Easterisamixofthreetraditions:Pagan,HebrewandChristian.
[originaltext]Easterisamixofthreetraditions:Pagan,HebrewandChristian.
[originaltext]W:2millionhighschoolseniorsaregearingupthisfalltoappl
随机试题
Accordingtothereport,Beijing’sairportsaw______percentlinerssuspended.[
设函数,且,则a=________.
文件传输协议(FTP)使用TCP服务。
老年患者使用头孢菌素易引起的不良反应是:()A.肝损害 B.肾功能下降
下列关于应用价格指数法估算重置成本的说法中,正确的有( )。A.价格指数法是利
预期损失是指在( )内投资组合损失的期望值。A.未来预期区间 B.置信区间
Thechangeinthatvillagewasmiraculou
热力管道土建结构顶面与公路路面基础的最小净距离为()。A.0.5m B.
注浆法施工中的注浆工艺参数包括()。A.注浆量 B.注浆泵压力 C.注浆压
某建筑公司与某建设单位签订了施工总承包合同,该项目的施工技术难度比较大,建设工期
最新回复
(
0
)