首页
登录
职称英语
A freight elevator can carry a maximum load of 1200 pounds. Sean, who weighs 200
A freight elevator can carry a maximum load of 1200 pounds. Sean, who weighs 200
游客
2024-01-14
53
管理
问题
A freight elevator can carry a maximum load of 1200 pounds. Sean, who weighs 200 pounds, is in the elevator with two packages weighing 150 pounds and 280 pounds. If he needs to fit three more packages in the elevator that weigh as much as possible without exceeding the elevator limit, what is the difference between their average and the average of the two packages already in the elevator?
选项
A、25
B、85
C、190
D、215
E、210
答案
A
解析
Scan and the two packages in the elevator weigh 630 pounds together, so the three packages Scan wants to put into the elevator must weigh a maximum of 1,200-630, or 570. If we divide that by 3, we get the average weight of each package, 190. The two packages already in the elevator weigh a total of 430 together, so their average weight is 215. Subtract 190 from 215 and we get the difference in the averages, or 25.
转载请注明原文地址:https://tihaiku.com/zcyy/3360532.html
相关试题推荐
Classsizesare______toamaximumof10forabetterlearningexperience.A、force
Classsizesare______toamaximumof10forabetterlearningexperience.A、force
Afreightelevatorcancarryamaximumloadof1200pounds.Sean,whoweighs200
Aparticularrocketcarcantravelforsustainedperiodsatamaximumspeedof2
1.TheaveragenormalinfantbornintheUnitedStatesweighsbetweentwelvean
Inessence,allrent-controlpoliciesinvolvespecifyingamaximumrentthatal
Whatisthemaximumnumberofnonover-lappingregionsintowhich3linescandiv
Thereasonminimumtemperaturesaregoingupmorerapidlythanmaximumsmayinvo
随机试题
LastyearFrenchdriverskilled【1】than5,000peopleontheroadsforthefir
期货合约的市场研究应当从()等几个方面着手。A、该品种的现货价格波动特征、仓储分布等现货市场研究B、该品种合约交易管理、结算交割和风险管理等期货市场
在价值工程中,某工程的功能与成本关系曲线如下图,要选择的最佳点位是()。
某烟草公司为增值税一般纳税人,2018年1月进口卷烟500标准箱,海关核定的关税
建设单位在办理质量监督手续时须提交的资料有( )。A.施工图设计文件审查报告和
患者,男性,42岁,数月来右下后牙常进食后疼痛,偶自发痛及冷、热刺激痛,自服抗生
对在境内商店购买的文物,海关凭主管部门加盖的鉴定标志和()查验放行。A.文物古
目前房地产买卖的主要类型有( )。A.商品房销售 B.房地产赠与 C.二手
术后常规拔除尿管的时间是术后A、3天 B、2天 C、1天 D、4小时 E
施工单位认为施工准备工作已完成,具备开工条件时,应向( )报送“工程开工报审表
最新回复
(
0
)