首页
登录
职称英语
In a forest 150 deer were caught, tagged with electronic markers, then released.
In a forest 150 deer were caught, tagged with electronic markers, then released.
游客
2024-01-14
42
管理
问题
In a forest 150 deer were caught, tagged with electronic markers, then released. A week later, 50 deer were captured in the same forest. Of these 50 deer, it was found that 5 had been tagged with the electronic markers. If the percentage of tagged deer in the second sample approximates the percentage of tagged deer in the forest, and if no deer had either left or entered the forest over the preceding week, what is the approximate number of deer in the forest?
选项
A、150
B、750
C、1,250
D、1,500
E、2,500
答案
D
解析
5 out of 50 deer is 10 percent. If this is representative of the percentage of tagged deer in the forest, then the 150 tagged deer are 10 percent of the 1,500 total deer in the forest.
转载请注明原文地址:https://tihaiku.com/zcyy/3360374.html
相关试题推荐
YesterdayMr.Blakewascaughtintherainandgotwetthrough,______hecaught
Mr.Phillipscaughtupwiththeboyinthecorridorand______hishandonhissho
Inananimalbehaviorexperiment,50taggedwhitepigeonsand200taggedgraypi
Inaforest150deerwerecaught,taggedwithelectronicmarkers,thenreleased.
Neotropicalcoastalmangroveforestsareusually“zonal,”withcertainmangr
Anelectronicscompany’stwodivisionsshowedconsistentperformanceoverthela
Cityresident:Thesenewdigitalelectronicbillboardsshouldbebannedforligh
A、Digitalpartitioningalgorithmscouldbeappliedtoelectronic,andnotjusto
Electroniccomputerspeedsarerestrictednotonlybythespeedofelec
FORESTALL:A、extendB、precipitateC、vacillateD、proclaimE、stabilizeB
随机试题
StressManagementI.Thegoalofstressmanagement—ta
[originaltext]M:Howdidyoulikeyesterday’sastronomyclass?W:Itwasinter
[originaltext]M:Howaboutthewhiteoneontheleft?Itscheaper.W:Theblu
预计价格上涨的投机者会建立期货()。A:空头 B:多头 C:对冲
共用题干 HackThefirstbig-namehackersinc
绩效考评效标是指评价员工绩效的指标及标准,具体包括( )。A.卓越性效标 B
我国商业银行应该在()年全面达到巴塞尔协议Ⅲ所要求的资本监管要求。A.2018
下列关于承租人确认的租赁负债后续计量的说法中,正确的有()。A.确认租赁负
下列关于投标文件的补充、修改与撤回的说法,正确的有()。A.对投标文件的补充、修
根据《建设工程施工质量验收统一标准》(GB50300-2013),分项工程的质量
最新回复
(
0
)