首页
登录
职称英语
A system was developed to control traffic congestion on the M25 motorway. Expert
A system was developed to control traffic congestion on the M25 motorway. Expert
游客
2024-01-05
41
管理
问题
A system was developed to control traffic congestion on the M25 motorway. Experts use【L5】________information from the motorway to set【L6】________according to traffic build-up. However, in order to maintain a steady flow of traffic, the number of vehicles on the roads should not exceed【L7】________per lane per hour, which is far fewer than the number on【L8】________of the motorway. One solution could be to fit the car with【L9】________and a computer. The system would be activated when approaching an area of congestion and the computer would then regulate the acceleration and【L10】________to help the car to pass easily through the congestion. [br] 【L8】
A: So they’re looking at live action on the motorway?
D: Exactly. Because they’re working in real time and reacting immediately to the situation on the road, they hope to alleviate problems before they happen. So as the traffic gets heavier to the point where these waves of congestion are likely to form, the controllers monitoring the situation set speed limits at say, 50 or 60 mph to regulate the flow. Further back down the motorway at the back of the congestion zone, they set a lower speed limit, say 40 mph, which should theoretically help control the traffic through the problem area.
A: But traffic jams still happen on the M25, don’t they? I was in one a few months ago and we were at a standstill for ages.
D: Yes, of course, sometimes there are simply too many cars on the roads, I think what the programme said was that the ideal number of cars on the road is
no more than 2,000 per lane per hour
— something like that. Theoretically, this should keep traffic moving smoothly at all times. But of course the number of cars on the road
far exceeds this
— I think in
some sections of the M25
there have been up to 200,000 vehicles a day.
A: Mmm. So, basically we need to reduce the number of cars on the roads. Well, that’s not likely to happen, is it?
D: No, but researchers are still looking into car technology that might help. As most congestion waves are caused by drivers braking too hard suddenly, the idea is that you
install radar on the outside of the car
and an onboard computer. The driver would activate the system when signs alerted him or her to a possible congestion zone. Then the computer would take over and then
take control of the braking and acceleration.
Because it can react much faster than a human driver, in theory, it would control the car smoothly through the zone.
A: A bit like an auto-pilot system?
D: Yes.
选项
答案
some sections
解析
本题有关M25高速路上某个区域的交通量。录音原文对题目进行了反义转换,录音中的far exceeds是题目中far fewer than的反义转换。
转载请注明原文地址:https://tihaiku.com/zcyy/3336596.html
相关试题推荐
[img]2012q1/ct_eirm_eirread_0037_20121[/img][br]systematicdesign
Aspark,aflint:HowfireleapttolifeThecontroloffire
Aspark,aflint:HowfireleapttolifeThecontroloffire
Aspark,aflint:HowfireleapttolifeThecontroloffire
Aspark,aflint:HowfireleapttolifeThecontroloffire
Tocontroldustatminesites,miningcompaniesoftenuseA、chemicalswhichmayb
MorseCodeMorsecodeisbeingreplacedbyanewsatellite-basedsystemforsend
MorseCodeMorsecodeisbeingreplacedbyanewsatellite-basedsystemforsend
MorseCodeMorsecodeisbeingreplacedbyanewsatellite-basedsystemforsend
MorseCodeMorsecodeisbeingreplacedbyanewsatellite-basedsystemforsend
随机试题
[originaltext]W:Ifwegobycar,howdowecrosstheriver?M:There’saferry
阻塞性睡眠呼吸暂停综合征是指A.成人7h睡眠时间内,至少有20次呼吸暂停,每次口
“须臾十来往,犹恐巢中饥。辛勤三十日,母瘦雏渐肥”“几处早莺争暖树,谁家新燕啄春
下列四项去掉哪一项后,剩下的图形可以呈现出一定的规律性?()
小潘并非既懂德语又懂法语。如果上述断定为真,那么下列断定必定为真的是( )A.
老年性骨质疏松症的主要诱发因素是A.增龄衰老 B.体内激素不足 C.体内激素
最常见的食物中毒是A.真菌性食物中毒 B.化学性食物中毒 C.有毒动植物食物
基础设施建设的特点有()。A.初始投资大 B.建设周期长 C
依据《中华人民共和国环境影响评价法》,组织进行专项规划环境影响评价的时间应当是(
女性,29岁,贫血病史1年,浅表淋巴结不肿大,肝脾未触及,血象呈现全血细胞减少,
最新回复
(
0
)