首页
登录
职称英语
A system was developed to control traffic congestion on the M25 motorway. Expert
A system was developed to control traffic congestion on the M25 motorway. Expert
游客
2024-01-05
53
管理
问题
A system was developed to control traffic congestion on the M25 motorway. Experts use【L5】________information from the motorway to set【L6】________according to traffic build-up. However, in order to maintain a steady flow of traffic, the number of vehicles on the roads should not exceed【L7】________per lane per hour, which is far fewer than the number on【L8】________of the motorway. One solution could be to fit the car with【L9】________and a computer. The system would be activated when approaching an area of congestion and the computer would then regulate the acceleration and【L10】________to help the car to pass easily through the congestion. [br] 【L8】
A: So they’re looking at live action on the motorway?
D: Exactly. Because they’re working in real time and reacting immediately to the situation on the road, they hope to alleviate problems before they happen. So as the traffic gets heavier to the point where these waves of congestion are likely to form, the controllers monitoring the situation set speed limits at say, 50 or 60 mph to regulate the flow. Further back down the motorway at the back of the congestion zone, they set a lower speed limit, say 40 mph, which should theoretically help control the traffic through the problem area.
A: But traffic jams still happen on the M25, don’t they? I was in one a few months ago and we were at a standstill for ages.
D: Yes, of course, sometimes there are simply too many cars on the roads, I think what the programme said was that the ideal number of cars on the road is
no more than 2,000 per lane per hour
— something like that. Theoretically, this should keep traffic moving smoothly at all times. But of course the number of cars on the road
far exceeds this
— I think in
some sections of the M25
there have been up to 200,000 vehicles a day.
A: Mmm. So, basically we need to reduce the number of cars on the roads. Well, that’s not likely to happen, is it?
D: No, but researchers are still looking into car technology that might help. As most congestion waves are caused by drivers braking too hard suddenly, the idea is that you
install radar on the outside of the car
and an onboard computer. The driver would activate the system when signs alerted him or her to a possible congestion zone. Then the computer would take over and then
take control of the braking and acceleration.
Because it can react much faster than a human driver, in theory, it would control the car smoothly through the zone.
A: A bit like an auto-pilot system?
D: Yes.
选项
答案
some sections
解析
本题有关M25高速路上某个区域的交通量。录音原文对题目进行了反义转换,录音中的far exceeds是题目中far fewer than的反义转换。
转载请注明原文地址:https://tihaiku.com/zcyy/3336596.html
相关试题推荐
[img]2012q1/ct_eirm_eirread_0037_20121[/img][br]systematicdesign
Aspark,aflint:HowfireleapttolifeThecontroloffire
Aspark,aflint:HowfireleapttolifeThecontroloffire
Aspark,aflint:HowfireleapttolifeThecontroloffire
Aspark,aflint:HowfireleapttolifeThecontroloffire
Tocontroldustatminesites,miningcompaniesoftenuseA、chemicalswhichmayb
MorseCodeMorsecodeisbeingreplacedbyanewsatellite-basedsystemforsend
MorseCodeMorsecodeisbeingreplacedbyanewsatellite-basedsystemforsend
MorseCodeMorsecodeisbeingreplacedbyanewsatellite-basedsystemforsend
MorseCodeMorsecodeisbeingreplacedbyanewsatellite-basedsystemforsend
随机试题
Therearevariouswaysinwhichindividualeconomicunitscaninteractwith
WhereisMrs.Bushvisitingnow?[originaltext]UnitedStatesFirstLadyLaur
Theargumentisvery(convince)____________.convincing论点非常具有说服力。现在分词做表语,表示物体的性质、
Oldpeoplearealwayssayingthattheyoungarenotwhattheywere.Thesame
合式衬砌隧道现场监控量测项目中,( )为必测项目。 A、周边位移 B、拱
材料1:我国石油、天然气人均剩余可采储量仅有世界平均水平的7.7%和7.1%,储
甲乙两人计划从A地步行去B地,乙早上7:00出发,匀速步行前往,甲因事耽搁,9:
财政购买性支出的特点有( )。A.强制性 B.有偿性 C.固定性 D.营
(2015年真题) 【背景资料】 某建设单位投资兴建住宅楼,建筑面积120
招标人的下列行为中,属于以不合理的条件限制、排斥潜在投标人或者投标人的有( )
最新回复
(
0
)