首页
登录
职称英语
Art Murals[img]2012q1/ct_etoefm_etoeflistz_0647_20121[/img] [br] Why does the in
Art Murals[img]2012q1/ct_etoefm_etoeflistz_0647_20121[/img] [br] Why does the in
游客
2024-01-04
12
管理
问题
Art Murals
[br] Why does the instructor say this:
W1: I know you’re all excited about our class project. But before we get started on the design of our mural, let’s review some of the technical requirements for murals. What factors do we need to keep in mind? Yes, Lydia?
W2: The mural has to be permanent. It has to last as long as the building. And it has to be sturdy enough to put up with conditions like the walls being washed.
W1: Good points. Yes, David?
M: It should have a flat finish so you can look at it from all angles without seeing any glare. And the design should be laid out so you can see it while you’re walking rather than standing still.
W1: Yes, those are all things we need to bear in mind. We want people to take in our mural—all of it—from a moving position, since they’ll be observing it as they walk through the lobby to the elevators. And let’s not forget that our mural is more than just a large-scale work of art done on a wall instead of a canvas. The term "mural" implies a distinct feeling or nature, a quality that’s appropriate to the architecture and the function of the room. A mural is an integral part of the building. If it’s painted in an existing building, like ours will be, it should be planned to fit into the architectural design, instead of giving the impression that it’s a surface decoration. Now, what are some of the technical requirements for our wall?
M: Obviously, the wall shouldn’t move. It shouldn’t shrink or settle because that could cause cracks in the paint or plaster.
W1: Yes, it’s vital that our wall be perfectly immovable. And for murals like ours—remember, our mural will be on the interior side of an exterior wall—another important requirement is that dampness should be excluded. Dampness can result from water seeping through porous materials or through joints, corners, or flaws in the building construction. When water leaks through a wall, it may dissolve the salts that are in the building materials. When the moisture dries, the salts are deposited in the form of white, moldy-looking film on the surface of the plaster. This greatly weakens the plaster, which can crumble or crack, and, of course, it’s disastrous to the mural.
W2: Can moisture make the paint peel off?
W1: Yes, it can. When moisture penetrates a wall coated with paint, it causes the plaster to expand and the paint to peel off—either in small flakes or in big pieces. And we don’t want that happening to our work, so we’ll need to take measures to prevent it. Our goal will be to reduce expansion of the plaster and to lessen the condensation of moisture on the surface. So our first rule is to exclude dampness as much as possible.
M: Don’t we also need to guard the plaster from extreme changes in temperature?
W1: Yes. So, how are we going to do this?
M: We could create an air space between the outer wall of the building and the plaster. We could do this by building a screen or, urn, like a false Wall just inside the exterior wall, and then we put the plaster for the mural on this false wall. There’d be like an inch of air space between the false wall and the exterior wall. The air space would have an insulating effect. What I mean is, it would slow down any temperature changes on the plaster.
W1: Yes, you’re correct about the insulating effect of an air space. Now, to do this—it’s called "furring" the wall—what we do is, we attach thin strips of wood to the exterior wall, and then we build another wall on top of this. The furring of the wall creates an air space of one-half to one inch between the outer and inner walls. That’s enough to protect our mural from moisture and temperature changes, as well as the mechanical strains and stresses of the wall itself.
选项
A、To explain how a wall can be made stronger
B、To describe the process of framing a mural
C、To explain how to create an insulating air space
D、To describe a technique for texturing a plaster wall
答案
C
解析
Why does the instructor say this:
"Now, to do this—it’s called "furring" the wail—what we do is, we attach thin strips of wood to the exterior wall, and then we build another wall on top of this."
The instructor’s purpose is to explain how to create an insulating air space between the outer and inner walls. The instructor describes how to build another wall on top (?[strips of wood attached to the inside surface of the wall. The mural will be painted on this new wall. (2.3)
转载请注明原文地址:https://tihaiku.com/zcyy/3332176.html
相关试题推荐
[img]2012q1/ct_eilm_eillist_0339_20121[/img][br][originaltext]DAWN:We’vecha
[img]2012q1/ct_eilm_eillist_0339_20121[/img][br][originaltext]DAWN:We’vecha
[img]2012q1/ct_eilm_eillist_0128_20121[/img][br][originaltext]Goodmornin
[img]2012q1/ct_eilm_eillist_0239_20121[/img][br]peertutor
[img]2012q1/ct_eilm_eillist_0239_20121[/img][br]familyfriends
[img]2012q1/ct_eilm_eillist_0302_20121[/img][br][originaltext]Agoodway
[img]2012q1/ct_eilm_eillist_0288_20121[/img][br][originaltext]TAXOFFICER:Wh
[img]2012q1/ct_eilm_eillist_0288_20121[/img][br][originaltext]TAXOFFICER:Wh
[img]2012q1/ct_eilm_eillist_0288_20121[/img][br][originaltext]TAXOFFICER:Wh
[img]2012q1/ct_eilm_eillist_0288_20121[/img][br][originaltext]TAXOFFICER:Wh
随机试题
DorothyCrowfootHodgkinWhenDorothyCrowfootHodgkinw
所示结构,z点处的弯矩为下列何值?( ) A.qa2/2 B.qa2 C
女性,78岁。慢性咳嗽、咳痰28年,每年发作3个月左右,近2年来出现活动后气短,
(2017年真题)下列关于基金互认的说法中,错误的是()。A.在基金互认制
2016年12月31日,甲公司A库存商品账面价值(成本)为60万元,市场售价为6
培训成果的第一级评估是()。A:反应评估 B:行为评估 C:结果评估 D
共用题干 D汽车制造厂对载货汽车生产线进行技术改造,改造内容为:冲压车间新增冲
凡从事工程( )的人员不得担任该工程的兼职质量监督员。A.建设 B.监理 C
总承包风险费是指由总承包单位为支付风险费用计列的金额,风险费用包括的内容有(
洞顶覆盖层较薄、难以用暗挖法建隧道时,隧道洞口受坍方、落石、泥石流等危害时,通常
最新回复
(
0
)