首页
登录
职称英语
Removing DamsP1: In the last century, many of the dams in the United States wer
Removing DamsP1: In the last century, many of the dams in the United States wer
游客
2024-01-03
40
管理
问题
Removing Dams
P1: In the last century, many of the dams in the United States were built for water diversion, agriculture, factory watermills, and other purposes that allowed farming on lands that would otherwise be too dry, with low-cost hydroelectric power generation being a very significant side benefit. Building these dams was rather labor-intensive, which created jobs for workers and stimulated regional economic development. But those opposed to large dams can marshal a sobering array of criticisms based on those already built, which have provided some benefits but have without exception destroyed river environments and the human communities that depend on them.
P2: Many, perhaps most, of the more than 90,000 dams in the country are now obsolete, expensive, and unsafe, and were built with no consideration of the environmental costs. As operating licenses come up for renewal in 1999, habitat restoration to original stream flows will be among the options considered. As these dams age and decay, they can also become public safety hazards, presenting a failure risk and a dangerous nuisance. Worse still, with the growth of the American population, more people are moving into risky areas. Dams that once could have failed without major repercussions are now upstream of cities and development. In 1998, the Army Corps announced that it would no longer be building large dams. In the few remaining sites where dams might be built, public opposition is so great that getting approval for projects is unlikely.
P3: For many years, the United States Fish and Wildlife Service had advocated the removal of the Edwards Dam, which was built in 1837 on the Kennebec River in Augusta, Maine, to ease navigation and generate electricity. The Kennebec River was once home to all ten species of migratory fish native to Maine, along with several thriving commercial fisheries. Damming the river not only transformed the natural landscape, but it also prevented migration of salmon, shad, sturgeon, and other fish species up the river.
In 1999, the Federal Energy Regulatory Commission (FERC) refused the renewal of the dam license due to excessive negative environmental impact, and the dam was removed, freeing a 17-mile stretch of the Kennebec River that had been submerged for 162 years. P4: The cost of keeping outdated hydroelectric equipment running decades after it was installed or upgrading dam safety systems may not be worth it. This was proven true on the Elwha River in the Olympic National Park in Washington when an extraordinarily rich salmon habitat was being disrupted by an outdated hydroelectric plant. Before dams were built on the Elwha River, 400,000 salmon returned each year to spawn, but that number dropped to fewer than 3,000 after dams were put up. Once the hydroelectric power generating capacities of the dams had outlived their useful lives, the importance of this salmon habitat necessitated the removal of the dams on the Elwha River. Simply removing the dams will not restore the salmon, however. Where 50-kilogram king salmon once fought their way up waterfalls to lay their eggs in gravel beds, there are now only concrete walls holding back still water and deep beds of muddy deposits.
P5: When the negative environmental effects outweigh the benefits, a dam may be considered for removal. The Hetch Hetchy Dam, whose construction was one of the first major defeats of the nascent American environmental movement, was approved in 1913 to assist earthquake-ravaged San Francisco. Environmentalists and nature lovers, who said the valley’s beauty surpassed even Yosemite Valley’s, have constantly fought for its removal. They claim that restoring Hetch Hetchy Valley could reclaim an area that is half the size of Yosemite Valley and nearly identical in terms of beauty. Revenue and increased local spending from tourism could offset some or all of the losses from removing the dam. This problem can be thought of as appraising the relative value of two scarce resources, water and space, in Yosemite National Park.
P6: How does one weigh the many different economic, cultural, and aesthetic considerations for removing or not removing these dams? Do certain interests, such as the rights of native people or the continued existence of native species of fish or wildlife, take precedence over economic factors, or should this be a utilitarian calculation of the greatest good for the greatest number? And does that number include only humans, or do other species count as well?
P4: ■ The cost of keeping outdated hydroelectric equipment running decades after it was installed or upgrading dam safety systems may not be worth it. ■ This was proven true on the Elwha River in the Olympic National Park in Washington when an extraordinarily rich salmon habitat was being disrupted by an outdated hydroelectric plant. ■ Before dams were built on the Elwha River, 400,000 salmon returned each year to spawn, but that number dropped to fewer than 3,000 after dams were put up. ■ Once the hydroelectric power generating capacities of the dams had outlived their useful lives, the importance of this salmon habitat necessitated the removal of the dams on the Elwha River. Simply removing the dams will not restore the salmon, however. Where 50-kilogram king salmon once fought their way up waterfalls to lay their eggs in gravel beds, there are now only concrete walls holding back still water and deep beds of muddy deposits. [br] Paragraph 2 supports which of the following ideas about operating licenses for large dams?
选项
A、Since 1999 licenses have been renewed only for small dams.
B、Before 1999, owners applying for a license renewal were more likely to have their applications than they were after that date.
C、Strong public opposition to their renewal was common even before 1999, but it was based on safety considerations, not on environmental ones.
D、The environmental cost of dams has been a minor consideration in license renewal applications since 1999.
答案
B
解析
【推断题】第2句说到随着运营许可证的更新,水源地的生态恢复被纳入条款,而1999年之前的大坝建造没有考虑到环境的问题,所以1999年之前申请运营许可证更容易一些。
转载请注明原文地址:https://tihaiku.com/zcyy/3328751.html
相关试题推荐
UnitedStatesGovernment[img]2014m9s/ct_etoefm_etoeflistz_0092_20149[/img][br]
UnitedStatesGovernment[img]2014m9s/ct_etoefm_etoeflistz_0092_20149[/img][br]
The21stcenturyhasbegun.Whatchangesdoyouthinkthisnewcenturywill
EconomicDeclineinEuropeDuringtheFourteenthCenturyP1:Someverynegative
EconomicDeclineinEuropeDuringtheFourteenthCenturyP1:Someverynegative
EconomicDeclineinEuropeDuringtheFourteenthCenturyP1:Someverynegative
EconomicDeclineinEuropeDuringtheFourteenthCenturyP1:Someverynegative
EconomicDeclineinEuropeDuringtheFourteenthCenturyP1:Someverynegative
EconomicDeclineinEuropeDuringtheFourteenthCenturyP1:Someverynegative
EconomicDeclineinEuropeDuringtheFourteenthCenturyP1:Someverynegative
随机试题
What’sthepurposeoftheprogramme?[originaltext]WelcometotheOrientatio
卫生间等有贴砖或石材要求的区间,需先在电脑上排版,然后根据排版图弹出分格线。
( )是安全生产责任的主体,国家有关法律法规对其建立健全安全生产规章制度有明确
供应商战略伙伴关系是企业与供应商之间达成的最高层次的合作关系。有关战略合作管理的
《幼儿园教育指导纲要(试行)》中提出培养幼儿社会态度和社会情感所采用的方法是(
作为督导者的老王通过教导,让新录用的社会工作者小刘能够“自我觉醒”,可以自主地思
国家创制法的形式包括制定、认可和()。A:审查B:执行C:解释D:监督
境内个人外汇汇出境外用于经常项目支出,单笔或当日累计汇出在规定金额以上的,()在
下列关于犯罪的预备、未遂和中止,说法错误的是( )。A.盗窃分子练习偷盗技巧是犯
下列各项工作任务,属于施工准备阶段建设监理工作任务的是()。A.审查施工单位选
最新回复
(
0
)