首页
登录
职称英语
Problem Description of the Flood Early Warning SystemVocabulary and Expressions
Problem Description of the Flood Early Warning SystemVocabulary and Expressions
游客
2023-12-29
27
管理
问题
Problem Description of the Flood Early Warning System
Vocabulary and Expressions
physically-based algorithm deploy populace
calibrate adaptive illiterate fuse [br] How each sensor node measures its environment is an important research question.
The Problem Description of the Flood Early Warning System
In developing countries, warning communities of an incoming flood is an expensive proposal given their limited resources. The equipment necessary for early warning flood systems is expensive and centralized to support flood detection schemes that are computationally complex. This project explores new techniques for distributing the computation of flood detection within a wireless sensor network, grounding the research in reality through the design and installation of an early warning system for flooding in a developing country.
Sensor networks for flooding do not exist in a real-time automated capacity within developing countries. We are developing such a sensor network and examining how to distribute and adapt the flood prediction calculation. Current flood prediction relies on physically-based models requiring large amounts of data in order to calibrate the model, and significant computation power to compute the model. Neither of these being feasible on a sensor network as data,storage and computing power are limited, we are working on statistical algorithms capable of online, distributed computation.
Given a suite of robust adaptive distributed algorithms for flood warning, we are planning to implement these algorithms on a system that can be deployed within a developing country. This poses a number of challenges, ranging from survival in harsh flood environments, lack of trained personnel to maintain the system, and an illiterate populace to warn. Designing and implementing a system that addresses these issues poses interesting engineering problems. Key research questions here include: How does each sensor node measure its environment? How does each sensor communicate with the rest of the network, and convey its ongoing status given the worst weather conditions possible on a river? How and where should the information from the sensors be processed and fused?
选项
A、正确
B、错误
答案
A
解析
是对原文相关内容的同义表述,因此本题正确。
转载请注明原文地址:https://tihaiku.com/zcyy/3315163.html
相关试题推荐
Hisemotionalproblems______fromhisexperiencesasachild,Ithink.A、stemB、
Althoughafflictedby______seriouseyesightproblems,AliciaAlonsowasoneof__
Cleverandintelligentasheis,hecanneversolvetheproblem______.A、aloneB、
Thecentralproblemofeconomicsistosatisfythepeople’sandnation’swan
Thecentralproblemofeconomicsistosatisfythepeople’sandnation’swan
Thecentralproblemofeconomicsistosatisfythepeople’sandnation’swan
Thecentralproblemofeconomicsistosatisfythepeople’sandnation’swan
Thecentralproblemofeconomicsistosatisfythepeople’sandnation’swan
Thecentralproblemofeconomicsistosatisfythepeople’sandnation’swan
Thecentralproblemofeconomicsistosatisfythepeople’sandnation’swan
随机试题
ThewarmingoftheEarth【C1】______overthelast100yearswillbeduetoac
MostpeoplebuyalotofgiftsjustbeforeChristmas.Butsomepeoplethink
[originaltext]Theevidenceforharmonymaynotbeobviousinsomefamilies.
设D:|x|+|y|≤1,则( )。A.0 B.1/3 C.2/3 D.
A.高脂血症 B.高血压 C.糖尿病 D.肥胖 E.恶性肿瘤 H.N列
共用题干 NaturalMedicinesSinceearliestda
男性,40岁。中上腹饥饿性隐痛反复发作k)年,伴反酸、暖气,进食和服用抑酸剂可
下列叙述正确的是A.高渗性脱水常有细胞内水肿 B.等渗性脱水主要是细胞脱水
(2020年真题)施工图预算审查中,若工程条件相同,用已完工程的预算审查拟建工程
《实施工程建设强制性标准监督规定》规定,工程监理单位违反强制性标准规定,将不合格
最新回复
(
0
)