首页
登录
职称英语
Problem Description of the Flood Early Warning SystemVocabulary and Expressions
Problem Description of the Flood Early Warning SystemVocabulary and Expressions
游客
2023-12-29
68
管理
问题
Problem Description of the Flood Early Warning System
Vocabulary and Expressions
physically-based algorithm deploy populace
calibrate adaptive illiterate fuse [br] How each sensor node measures its environment is an important research question.
The Problem Description of the Flood Early Warning System
In developing countries, warning communities of an incoming flood is an expensive proposal given their limited resources. The equipment necessary for early warning flood systems is expensive and centralized to support flood detection schemes that are computationally complex. This project explores new techniques for distributing the computation of flood detection within a wireless sensor network, grounding the research in reality through the design and installation of an early warning system for flooding in a developing country.
Sensor networks for flooding do not exist in a real-time automated capacity within developing countries. We are developing such a sensor network and examining how to distribute and adapt the flood prediction calculation. Current flood prediction relies on physically-based models requiring large amounts of data in order to calibrate the model, and significant computation power to compute the model. Neither of these being feasible on a sensor network as data,storage and computing power are limited, we are working on statistical algorithms capable of online, distributed computation.
Given a suite of robust adaptive distributed algorithms for flood warning, we are planning to implement these algorithms on a system that can be deployed within a developing country. This poses a number of challenges, ranging from survival in harsh flood environments, lack of trained personnel to maintain the system, and an illiterate populace to warn. Designing and implementing a system that addresses these issues poses interesting engineering problems. Key research questions here include: How does each sensor node measure its environment? How does each sensor communicate with the rest of the network, and convey its ongoing status given the worst weather conditions possible on a river? How and where should the information from the sensors be processed and fused?
选项
A、正确
B、错误
答案
A
解析
是对原文相关内容的同义表述,因此本题正确。
转载请注明原文地址:https://tihaiku.com/zcyy/3315163.html
相关试题推荐
Hisemotionalproblems______fromhisexperiencesasachild,Ithink.A、stemB、
Althoughafflictedby______seriouseyesightproblems,AliciaAlonsowasoneof__
Cleverandintelligentasheis,hecanneversolvetheproblem______.A、aloneB、
Thecentralproblemofeconomicsistosatisfythepeople’sandnation’swan
Thecentralproblemofeconomicsistosatisfythepeople’sandnation’swan
Thecentralproblemofeconomicsistosatisfythepeople’sandnation’swan
Thecentralproblemofeconomicsistosatisfythepeople’sandnation’swan
Thecentralproblemofeconomicsistosatisfythepeople’sandnation’swan
Thecentralproblemofeconomicsistosatisfythepeople’sandnation’swan
Thecentralproblemofeconomicsistosatisfythepeople’sandnation’swan
随机试题
AssistantToPublicRelationsManagerBusin
In"IsawStevereadingunderthetree",the-ingformisusedas______.A、attri
混凝土浇筑完毕后,在混凝土强度达到()N/m㎡前,不得在其上踩踏或安装模板及支
混合减影经历了哪两个阶段A.先消除噪声,再消除伪影 B.先消除骨骼,再消除对比
个人以商业贷款方式购买住房,需缴纳的几种印花税的税率分别为()。A:万分之零点五
毛细血管内增生性肾小球肾炎的肉眼变化主要呈现A.大白肾 B.大红肾 C.颗粒
企业会计核算必须符合国家的统一规定,这是为了满足( )要求。A.一贯性原则
案例二: 一般资料:求助者,女性,27岁,本科学历,公司职员。 案例介绍:求
A.脂肪酸山梨坦 B.聚山梨酯 C.聚氧乙烯脂肪酸酯 D.聚氧乙烯脂肪醇醚
男性,20岁,因交通事故头顶部可见10cm直径的血肿,意识清楚,恶心、呕吐,急救
最新回复
(
0
)