首页
登录
职称英语
Pollution control is management of waste materials in order to minimize the
Pollution control is management of waste materials in order to minimize the
游客
2023-12-24
43
管理
问题
Pollution control is management of waste materials in order to minimize the effects of pollutants on people and the environment. The quality of human health and of the natural environment depends on adequate pollution control. In the United States much has been done to control the more noticeable pollutants since 1965: more subtle yet still hazardous pollutants, however, remain to be adequately controlled.
Four general approaches to pollution control are: the intermittent reduction of industrial activities during periods of high air-pollution conditions; wider dispersion of pollutants using such devices as taller smokestacks; reduction of pollutants in industrial emission; and change of an industrial process or activity in order to produce less pollution. Taller smokestacks may reduce the concentrations to which local people are exposed, but they are ineffective in reducing overall pollution.
Pollutants removed from waste flows to reduce emissions to air and water may be disposed of by burial or storage on land, practices that pose potential hazards. Recent legislation requiring extensive emissions reductions has resulted in large investments in pollution-treatment technologies.
The fourth approach — changing a manufacturing process or activity in order to produce less pollution — may involve either the production of fewer residuals, by means of an improved process, or the separation and reuse of materials from the waste stream. This method of pollution control is the most effective and, as the costs of pollution control and waste disposal increase, is considered one of the most efficient.
Pollution-treatment systems have been effective in reducing the massive quantities of water and air pollutants that have clogged and choked urban areas. Although the improvements have been significant, recent pollution-control legislation aims to go further in order to control the less visible but often hazardous chemical and gaseous pollutants that still contaminate many waterways and urban atmospheres.
The costs of pollution control — resulting from capital, maintenance, and labor costs, as well as from the cost of additional residuals disposal — generally go up rapidly as a greater percentage of residuals is removed from the waste stream. Damage from pollution, on the other hand, goes down as a greater amount of contaminant is removed. Theoretically, the level of treatment should correspond to a point at which total costs of treatment and of damage to the environment are minimized or the benefits of further treatment are proportionally much smaller than the increased cost. In reality, costs or damages resulting from pollution can rarely be assessed in terms of dollars. [br] The overall purpose of the passage is______.
选项
A、to discuss the ways of and problems in pollution control
B、to give suggestions about pollution control legislation
C、to compare and contrast the four approaches to pollution control
D、to describe what has been achieved in pollution control
答案
A
解析
这是道主旨题。主旨题一般需要反映整篇文章的中心意思,有时是对整篇文章的概括。这篇文章主要讲的是控制环境污染的四种方式以及出现的一些问题。容易混淆的是第三个答案:比较控制环境污染的四种方式。许多考生会选择这个选项,因为文中前半部分就是分析的四种方式,但是整篇文章不仅仅讲的是这四种方式,还有控制环境污染所碰到的一些问题,故不能选C,要选A。
转载请注明原文地址:https://tihaiku.com/zcyy/3300086.html
相关试题推荐
Socialcontrolreferstosocialprocesses,plannedorunplanned,bywhichpe
Socialcontrolreferstosocialprocesses,plannedorunplanned,bywhichpe
Socialcontrolreferstosocialprocesses,plannedorunplanned,bywhichpe
Socialcontrolreferstosocialprocesses,plannedorunplanned,bywhichpe
Socialcontrolreferstosocialprocesses,plannedorunplanned,bywhichpe
Socialcontrolreferstosocialprocesses,plannedorunplanned,bywhichpe
Elaineisawomanwhollyincontrolofherbodyandheractions,andherhilario
AlthoughothernationscontributedtoNorthSeapollution,muchofthecontamina
Pollutioncontrolismanagementofwastematerialsinordertominimizethe
Pollutioncontrolismanagementofwastematerialsinordertominimizethe
随机试题
Fromaveryearlyage,somechildrenexhibitbetterself-controlthanothers
[originaltext]Somepeoplethinkthatthebesttimetobeginstudyingaforei
竖向规划阶段进行土石方量的估算范围,不包括以下()项。A.场地平整土石方量
理财师的专业能力可以概括为()。A.了解、分析客户的能力 B.反馈客户意见的
对于工程项目管理而言,风险是指可能出现的影响项目目标实现的()。A、确定因素
共用题干 FreeStatinswithFastFoodcould
编制一批“中国结”,甲乙合作6天可完成;乙丙合作10天可完成;甲乙合作4天后,乙
下列属于影响房地产价格的自身因素有()。A.房地产的坐落位置 B.土地的
对于超过一定规模的危大工程,施工单位应当组织召开专家论证,专家应当从地方人民政府
A.地高辛 B.洋地黄毒苷 C.氨力农 D.肼屈嗪 E.硝普钠通过抑制磷
最新回复
(
0
)