首页
登录
职称英语
Quake Engineering: Looking at the Turkish Earthquake Damage? Despite the s
Quake Engineering: Looking at the Turkish Earthquake Damage? Despite the s
游客
2023-12-16
32
管理
问题
Quake Engineering:
Looking at the Turkish Earthquake Damage?
Despite the size of the devastating quake that ripped through Turkey, American structural engineers say there was something that might have alleviated the damage and saved lives. These images of the devastation in Turkey confirm what seismic engineers already know: that a powerful earthquake has an ally in a weak building. Jim Malley of Degenkolb Engineers, "This is the most common form of multi-story building In Turkey. It’s what we call a concrete frame." Structural engineer Jim Malley studied damaged buildings in Turkey in 1992 after a 6.8 (Richter Scale)quake left more than 600 dead. Jim Malley says, "These are very heavy buildings and it’s not uncommon for them to collapse In earthquakes because of the extra mass. The risk of building collapse increases when the first floor is a shop and glass windows replace brick walls. Undoubtedly, there was a glass store front at this level, and all that came through for the structure, was concrete columns, and that made it much weaker, and as a result we got the collapse of that first story."
Malley says Turkey’s concrete frame buildings often lack reinforcing steel, use too little or use a smooth steel bar that fails to grip the concrete. "We use what’s called deformed bars where there’s little bumps on the steel, which helps to tie the reinforcing steel into the concrete, and smooth bars. it pulls out much more easily."
In California, where each big quake teaches engineers another way of coping, steel frames reduce the weight of new buildings, and strong joints keep them agile.
Janiele Maffei shows a San Francisco skyscraper under construction and says, "The building is designed to move and to sway. and the connections to stay together."
Structural engineer Jardele Maffei says the 1994 Northridge, California quake, revealed the weakness of rigid joints. Engineers found a simple solution, She demonstrates the point by way of the building under way, "See to the right of the connection. See the beam? See how it looks like it’s been tapered? That’s called a dog bone; you can see how it looks like a dog bone, how it’s tapered. What that will do is it will take the stresses away from the connection, and concentrate them in that smaller section of the beam."
Cross bracing up the elevator shaft gives a building brute strength.
Janiele Maffei says, "What steel bracing does, is it connects the various floors, and keeps there from moving relative to each other in an earthquake."
Maffei says Turkish engineers do know how to build for earthquakes and building codes in Turkey are good, at least on paper. But somehow the system failed to produce earthquake resistant buildings [br] According to the article, why should building joints be agile?
选项
A、Such joints are cheap.
B、Such joints make buildings flexible and moveable.
C、Such joints are concrete frames.
D、Such joints make the buildings rigid.
答案
B
解析
本题为细节题。如果运用前文提到的概念已经可以初步判断选项B是正确的。考生接着往下读会发现文章第五段出现“the weakness of rigid joints”,正话反说,即建筑物的联结处如果能灵活些,这就成为了建筑物的优势。这给考生选择B又平添了不少信心。
转载请注明原文地址:https://tihaiku.com/zcyy/3276935.html
相关试题推荐
AuthorEmmaHeathcote-Jameshasspentnineyearslookingintoreal-lifeghost
AuthorEmmaHeathcote-Jameshasspentnineyearslookingintoreal-lifeghost
Aspeopleage,theircellsbecomelessefficientandlessablereplacedamage
Aspeopleage,theircellsbecomelessefficientandlessablereplacedamage
Aspeopleage,theircellsbecomelessefficientandlessablereplacedamage
Shestoodbeforeuslookingvery.composedasshegaveusgoodmorning.Sabri
Shestoodbeforeuslookingvery.composedasshegaveusgoodmorning.Sabri
Shestoodbeforeuslookingvery.composedasshegaveusgoodmorning.Sabri
Inthebeginning,E.MavisHetheringtonwaslookingforasmuchpathologyas
Inthebeginning,E.MavisHetheringtonwaslookingforasmuchpathologyas
随机试题
Parentsoftheapproximately200,000home-schooledchildreninCaliforniaare
(1)TheNobelsaretheoriginals,ofcourse.AlfredNobel,themanwhoinven
WhyTheyCameNotmanydecisionscouldhavebeenmored
Accordingtotheconversation,whichofthefollowingstatementsisCORRECTabou
下列关于公共建筑用水情况以及其设计流量计算的说法中,哪项不正确?()A.
在初步调查能为审计人员提供有关控制系统的最佳直观了解,并可成为分析复杂经营过程的
土地使用权转让时,土地使用权出让合同和登记文件中所载明的()随之转移。A:权利
A.中药、天然药物注册分类5类 B.中药、天然药物注册分类1类 C.中药、天
水构筑物满水试验时,正确的注水方法是( )。A.相邻两次注水时间间隔不少于36h
在招标过程中,若出现招标文件中分部分项工程量清单描述与设计图纸不符,投标人应以(
最新回复
(
0
)