首页
登录
职称英语
What materials were not used for road surfaces during the last century? [br] [o
What materials were not used for road surfaces during the last century? [br] [o
游客
2023-12-14
59
管理
问题
What materials were not used for road surfaces during the last century? [br]
Mr. Jones: What materials were used for road surfaces during the last century?
Engineer: Usually they were gravel and macadam. Tars and asphalt were originally used only as coverings, but later they were used as binders and finally as hot mixtures.
Mr. Jones: Concrete is a modem material as far as road - building goes, isn’ t it?
Engineer: Relatively speaking. But you might be surprised to know that a concrete road was built as early as 1893 in Ohio. But it was only 5 miles long. More extensive projects were not undertaken until much later, around 1912 or 1913.
Mr. Jones: This was because of the increase in traffic?
Engineer: That’ s right. Especially in the use of heavy tracks. More rigid pavements, such as concrete and brick, became a necessity. For light traffic, though, water-bound macadam, gravel, sand clay, and bituminous mixtures were still used.
Mr. Jones: What are turnpikes usually made of?
Engineer: Turnpikes are usually made of reinforced concrete about 8 to 10 inches thick, placed on a granular sub-base, which in turn is placed on a well - tacked earth subgrade. Of course, the construction depends a lot on the local climate, rainfall, soils, and so on.
Mr. Jones: How do you mean--climate?
Engineer: Frost is one of the main problems. For example, in Maine, where frost is quite frequent, the typical turnpike construction is a thin top layer of asphaltic concrete on a base layer of sand and gravel placed on a 36 - inch, frost - free, granular subgrade.
Mr. Jones: What is the width of these roads?
Engineer: The early two - lane roads were about 20 feet wide. But with higher automobile speeds, the width requirements increased greatly. To give you an example, the Pennsylvania Turnpike has two 12 - foot lanes in each direction, separated by a median 10 feet wide. On each side there is a 10 -foot stabilized shoulder, marking a total width of 78 feet. The New Jersey Turnpike averages 100 feet in width, with three lanes in each direction.
Mr.Jones: I guess wider roads are being built every day.
Engineer: That’ s right. Sometimes you think that, no matter how good a road you build, the speed and weight of vehicles will always be one step ahead.
选项
A、Sand clay.
B、Macadam.
C、Brick.
D、Bituminous mixtur
答案
C
解析
The engineer指出:For light traffic, water-bound macadam, gravel, sand clay, and bituminous mixtures are used. "bituminous"为"like or containing any of various flammable mixtures of hydrocarbons and other substances that are constituents of asphalt and tar."含有沥青的。
转载请注明原文地址:https://tihaiku.com/zcyy/3272331.html
相关试题推荐
EconomicconditionshaveimprovedduringthepastdecadeinmanyNorthAmeric
EconomicconditionshaveimprovedduringthepastdecadeinmanyNorthAmeric
Duringthe1970’sand1980’spoliticalextremismandterrorismfrequentlyfoc
Duringthe1970’sand1980’spoliticalextremismandterrorismfrequentlyfoc
TennisDuringthefirst50yearsofitshistory,tenniswas
TennisDuringthefirst50yearsofitshistory,tenniswas
TennisDuringthefirst50yearsofitshistory,tenniswas
TennisDuringthefirst50yearsofitshistory,tenniswas
TennisDuringthefirst50yearsofitshistory,tenniswas
TennisDuringthefirst50yearsofitshistory,tenniswas
随机试题
[originaltext]W:Whatareyoulaughingabout?M:Ijustsawtheseriousadverti
(1)Theymakesomeoftheworld’sbest-lovedproducts.Theirlogosareinstan
社区获得性肺炎,青壮年和无基础疾病的CAP患者选用()A:氧氟沙星 B:红霉
A.下肢静脉顺行造影 B.动脉造影 C.Buerger试验 D.深浅静脉功
患者,女,30岁。烦热干渴,头痛,牙痛,牙龈出血,舌红苔黄而干。治疗应首选A.龙
财务趋势分析的主要方法有:A.比率分析法 B.杜邦分析法 C.比较财务报表法
评估睡眠障碍最重要的检查方法是()。A.头颅CT B.脑电图 C.头颅DSA
根据下列资料回答问题。 2010年,我国进出口贸易总额为29727.6亿美元
基于认知的选择性,当消费者面对众多营销刺激时,一般更容易选择( )的外部刺激。
A.左移寄存器 B.右移寄存器 C.具有取数功能的数据存储器 D.具有存数
最新回复
(
0
)