首页
登录
职称英语
[originaltext]Mr. Jones: What materials were used for road surfaces during the
[originaltext]Mr. Jones: What materials were used for road surfaces during the
游客
2023-12-08
26
管理
问题
Mr. Jones: What materials were used for road surfaces during the last century?
Engineer: Usually they were gravel and macadam. Tars and asphalt were originally used only as coverings, but later they were used as binders and finally as hot mixtures.
Mr. Jones: Concrete is a modern material as far as road - building goes, isn’t it?
Engineer: Relatively speaking. But you might be surprised to know that a concrete road was built as early as 1893 in Ohio. But it was only 5 miles long. More extensive projects were not undertaken until much later, around 1912 or 1913.
Mr. Jones: This was because of the increase in traffic?
Engineer: That’s right. Especially in the use of heavy tracks. More rigid pavements, such as concrete and brick, became a necessity. For light traffic, though, water-bound macadam, gravel, sand clay, and bituminous mixtures were still used.
Mr. Jones: What are turnpikes usually made of?
Engineer: Turnpikes are usually made of reinforced concrete about 8 to 10 inches thick, placed on a granular sub-base, which in turn is placed on a well - tacked earth subgrade. Of course, the construction depends a lot on the local climate, rainfall, soils, and so on.
Mr. Jones: How do you mean--climate?
Engineer: Frost is one of the main problems. For example, in Maine, where frost is quite frequent, the typical turnpike construction is a thin top layer of asphaltic concrete on a base layer of sand and gravel placed on a 36 - inch, frost - free, granular sub - grade.
Mr. Jones: What is the width of these roads?
Engineer: The early two - lane roads were about 20 feet wide. But with higher automobile speeds, the width requirements increased greatly. To give you an example, the Pennsylvania Turnpike has two 12 - foot lanes in each direction, separated by a median 10 feet wide. On each side there is a 10 - foot stabilized shoulder, marking a total width of 78 feet. The New Jersey Turnpike averages 100 feet in width, with three lanes in each direction.
Mr. Jones: I guess wider roads are being built every day.
Engrneer: That’s right. Sometimes you think that, no matter how good a road you build, the speed and weight of vehicles will always be one step ahead.
选项
A、the increase in traffic
B、the cost of other materials
C、the change of the climate
D、the construction of the roads
答案
A
解析
“concrete”为“a constraction material consisting of sand,conglomerate gravel,broken stone,or slag in a mortar or cement matrix”混泥土。
转载请注明原文地址:https://tihaiku.com/zcyy/3256047.html
相关试题推荐
TheinfluxofmoneyintotheUSduringthe1970soilshockshowsnosignsas
ThefirstChinesetoreachtheUnitedStatescameduringtheCaliforniaGold
WhichofthefollowingisNOTtrueaccordingtothenews?[br][originaltext]
[originaltext]Washington(dpa)-AfterthefailuresoftheirpasttwoMarsmis
[originaltext]Washington(dpa)-AfterthefailuresoftheirpasttwoMarsmis
[originaltext]LiHua:Pardonme.I’mtryingtofindarticlesonecology.Canyo
Whatisthemainideaofthenewsitem?[br][originaltext]Thebattleagain
WhydidMr.Greenhaveaterriblefuelbilllastwinter?[br][originaltext]Mr.
WhydidMr.Greenhaveaterriblefuelbilllastwinter?[br][originaltext]Mr.
WhydidMr.Greenhaveaterriblefuelbilllastwinter?[originaltext]Mr.Green
随机试题
[originaltext]W:I’msoaked!ItstartedtopourtheminuteIgotoffthebus.M
DoBritain’sEnergyFirmsServethePublicInterest?[A]Capitalism
校对题:通读并改正校样中的错误。(本题20分)
Formostmen,talkisprimarilyameanst
预算成本是()。A.又称项目承包成本,其加上项目企业期望利润后,即为项目经理的
西班牙巴塞罗那尤以现代主义建筑闻名于世,代表性的建筑有()。A.圣家族大教堂
评估溺水者时,首要的步骤是A.观察瞳孔大小 B.观察胸廓起伏 C.轻拍并呼唤
对于国家审计,审计组起草审计报告前,对审计工作底稿审核的人员是( )。A.审计
下列关于代办不动产抵押权登记的流程,说法错误的是( )。A.交付材料时,如果本
表象的基本特征有( )A.直观性 B.概括性 C.可操作性 D.间接性
最新回复
(
0
)