首页
登录
职称英语
The Akashi Kaiyko Bridge in southern Japan is the world’s longest bridge. Th
The Akashi Kaiyko Bridge in southern Japan is the world’s longest bridge. Th
游客
2023-11-14
37
管理
问题
The Akashi Kaiyko Bridge in southern Japan is the world’s longest bridge. The Akashi Kaiyko Bridge spans the Akashi Strait, connecting Awaji Island to Kobe, an important industrial center. The bridge has a span of 5973 feet (1991 meters), making it over 25% longer than its nearest competition: the Humber Bridge in England. Stra-ngely, there may be longer bridges in the world, but the Guinness Book of World Records measures the longest bridges according to their record-breaking spans.
The Akashi Kaiyko Bridge is a suspension bridge. This means that the roadway is suspended from pillars by cables. The concrete pillars have to be tall enough to support the whole weight of the bridge. The pillars on the Akashi Kaiyko Bridge are 900 feet tall. These pillars had to be built to withstand not only huge waves but also high-speed winds, and possibly even violent earthquakes, which are not uncommon in the area. The bridge has survived one earthquake already: its span was extended by more than 3 feet by the Kobe earthquake of 1995.
The cables weigh 50,000 tons and have a diameter of almost four feet each. Each cable contains 290 hexagonal strands; each strand is composed of 127 steel wires. The total length of the wire used is more than 200,000 miles, enough to circle the Earth 7.5 times!
The first plans to connect Kobe to Naruto via Awaji Island were voiced in 1955, but it took the government thirty years to decide to really build the bridge. The next three years were spent surveying the site and construction commenced in 1988. In designing the bridge, special consideration was given to its effect on the surroundings, great emphasis was placed on a "pleasing balance between light and shade" and also on the choice of the perfect color.
The construction of the bridge was a very complicated and technologically draining process, which took ten years to complete. Casting concrete in 300 feet of water, installing special pilot ropes over the strait by helicopter, and finally stretching the gigantic steel cables surely wasn’t an easy job. Ten years after construction commenced in 1988, the bridge was finished and the six-lane highway finally opened to traffic.
The bridge has made the transportation from island to island much easier, so in addition to breaking a record, the Akashi Kaiyko Bridge achieves the main goal of a bridge: to connect two places. [br] During construction______.
选项
A、the Earth was circled 7.5 times with 200,000 miles of wire
B、the steel cables were installed by helicopter
C、an earthquake took place
D、concrete was usually cast in 30 feet of water
答案
C
解析
细节题。“construction”是定位关键词。选项A误读了文中的“enough to circle the Earth 7.5 times”,只是虚拟语气,不是真实发生的事。选项B中的“helicopter”是定位关键词,第五段“installing special pilot ropes over the strait by helicopter”,是安装特别的定位绳索,而不是缆绳。选项C可以从文中给出的日期计算出来。地震发生在1995年,桥是从1988年开始建造,建了10年,到1998年建完,所以应该是建设期间发生的地震,选项C正确。
转载请注明原文地址:https://tihaiku.com/zcyy/3185967.html
相关试题推荐
An______degreewasconferreduponhimbyCambridge.A、honorableB、honoringC、hono
Shedrewthesmallbridgeonthepaintingwithonlyafew_________A、linesB、move
AccordingtoAmericanfederalgovernment,residentsofHawaiihavethelongestl
Itisnotoftenrealizedthatwomen【C1】______ahighplaceinsouthernEur
Itisnotoftenrealizedthatwomen【C1】______ahighplaceinsouthernEur
Itisnotoftenrealizedthatwomen【C1】______ahighplaceinsouthernEur
Itisnotoftenrealizedthatwomen【C1】______ahighplaceinsouthernEur
Itisnotoftenrealizedthatwomen【C1】______ahighplaceinsouthernEur
Itisnotoftenrealizedthatwomen【C1】______ahighplaceinsouthernEur
Itisnotoftenrealizedthatwomen【C1】______ahighplaceinsouthernEur
随机试题
Somepeoplearguethatthesolution______thedrugproblemiseducation,andwhil
Pollution,overfishingandthe(36)______ofcoastalprojectshavepushedm
DoIn-GlassExamsMakeStudentsStudyHarder?Researchsuggeststheymaystu
下列哪项属于医院的经营性质:()A.政府给予医院财政补贴 B.政府免
根据《住宅专项维修资金管理办法》规定,交存住宅专项维修资金的范围包括()。A
在营养疗法中,要素饮食的要点错误的是()。A.无菌操作 B.滴注肠内的营养液
串联补偿装置全面巡视在例行巡视的基础上增加的项目有()。支柱绝缘子外观清洁完好,
常用的市场风险限额不包括()。A.损失限额 B.交易限额 C.风险限额 D
区域风险是商业银行在制定年度信贷政策时需要考虑的重要方面,以下关于区域风险分析的
国家提出要建设一个针对特定灾害的防灾预警系统,以减少灾害损失。共有三个互斥的建
最新回复
(
0
)