首页
登录
职称英语
London’s public transport system is no longer the "sick man" but the jewel i
London’s public transport system is no longer the "sick man" but the jewel i
游客
2023-10-21
33
管理
问题
London’s public transport system is no longer the "sick man" but the jewel in the crown" of the capital’s 2012 Olympic dream, bid chiefs said last night.
Transport experts told the International Olympic Committee scrutinizing Britain’s chances that London’s railways and roads would soon be the envy of the world.
Once improvements were in place, athletes would spend time "competing not commuting", bid leader Lord Coe told the IOC panel on the first day of their visit.
The need for an overhaul came after the IOC criticised London’s " obsolete" public transport systems in a report last May.
Yesterday the London 2012 bid made a series of promises including;
£ 10 billion of investments including a £ 1 billion East London line extension, longer Jubilee line trains and Northern line upgrades.
A train serving the main Olympic Park at Stratford, East London, every 15 seconds, on ten different rail lines.
Twelve-carriage, 225kph (140mph) javelin trains using the Channel Tunnel Rail Link and taking passengers between Straford and King’s Cross in six-and-a-half minutes.
Tube trains running until 2:30 a. m. every day of the Olympics.
Connecting services which will allow visitors to reach the Olympic Park from 309 stations.
The 13-member IOC panel will today have its first taste of the Underground, with a Jubilee line trip to the Millennium Dome. They will also travel on the Channel Tunnel Rail Link, watching a video outlining the transport improvements to be delivered every year up to 2012.
But they will spend most of their time on coaches as they travel to such key sites as Wembley and Wimbledon.
Transport Minister Tony McNulty admitted there were concerns about how London would cope with 500, 000 extra visitors a day. But Transport for London said the Olympic fortnight in August would lead to only a five percent increase in passengers—when 20 percent of London’s commuters were on holiday. Questions: [br] The need for an overhaul came because of a report given by the______.
选项
答案
International Olympic Committee(IOC)
解析
(文章第四段提到The need for an overhaul came after the IOC criticised London’s“obsolete”public transport systems in a report,在一次报道中IOC批评了伦敦的交通系统,IOC是International Olympic Committee的缩写。)
转载请注明原文地址:https://tihaiku.com/zcyy/3117345.html
相关试题推荐
Thepublicopinionwasthatthetimewasnot________fortheelectionofsucha
Thegovernment________apublicdebateonthefuturedirectionoftheofficialsp
Thissortofrudebehaviourinpublichardly________apersoninyourposition.A、
ThearchitectoftheWalkieTalkiebuildinginLondonhasadmittedthathep
My________concertwasasuccess.A、brother’slongfirstpublicB、brother’sfirst
London’spublictransportsystemisnolongerthe"sickman"butthejeweli
London’spublictransportsystemisnolongerthe"sickman"butthejeweli
London’spublictransportsystemisnolongerthe"sickman"butthejeweli
A.CasaPedroisasmall,SpanishrestaurantinNorthLondon.It’sapopular
A.CasaPedroisasmall,SpanishrestaurantinNorthLondon.It’sapopular
随机试题
Accustomedthoughwearetospeakingofthefilmsmadebefore1927as"silen
[audioFiles]audio_eusm_j92_001(20082)[/audioFiles]A、Thesigningisverynecessa
物流的资源要素包括哪些?
下列关于建筑室外消火栓系统设置正确的是()。A.建筑物室外必须采用低压消防
档案馆按照国家规定征集散存档案包括()途径A.有关机关团体、企事业单位 B.
A.直接接触药品的包装B.直接接触药品的包装的标签C.内标签以外的其他包装的标签
Thechangeinthatvillagewasmiraculou
线性表示,则以下选项中正确的是:
事后检验常用的方法有( )A.F检验 B.N—K法 C.HSD法 D.t
边际技术替代率是()。A.在产出量保持不变的前提下,增加最后一个单位投人要素
最新回复
(
0
)