首页
登录
职称英语
London’s public transport system is no longer the "sick man" but the jewel i
London’s public transport system is no longer the "sick man" but the jewel i
游客
2023-10-21
49
管理
问题
London’s public transport system is no longer the "sick man" but the jewel in the crown" of the capital’s 2012 Olympic dream, bid chiefs said last night.
Transport experts told the International Olympic Committee scrutinizing Britain’s chances that London’s railways and roads would soon be the envy of the world.
Once improvements were in place, athletes would spend time "competing not commuting", bid leader Lord Coe told the IOC panel on the first day of their visit.
The need for an overhaul came after the IOC criticised London’s " obsolete" public transport systems in a report last May.
Yesterday the London 2012 bid made a series of promises including;
£ 10 billion of investments including a £ 1 billion East London line extension, longer Jubilee line trains and Northern line upgrades.
A train serving the main Olympic Park at Stratford, East London, every 15 seconds, on ten different rail lines.
Twelve-carriage, 225kph (140mph) javelin trains using the Channel Tunnel Rail Link and taking passengers between Straford and King’s Cross in six-and-a-half minutes.
Tube trains running until 2:30 a. m. every day of the Olympics.
Connecting services which will allow visitors to reach the Olympic Park from 309 stations.
The 13-member IOC panel will today have its first taste of the Underground, with a Jubilee line trip to the Millennium Dome. They will also travel on the Channel Tunnel Rail Link, watching a video outlining the transport improvements to be delivered every year up to 2012.
But they will spend most of their time on coaches as they travel to such key sites as Wembley and Wimbledon.
Transport Minister Tony McNulty admitted there were concerns about how London would cope with 500, 000 extra visitors a day. But Transport for London said the Olympic fortnight in August would lead to only a five percent increase in passengers—when 20 percent of London’s commuters were on holiday. Questions: [br] The need for an overhaul came because of a report given by the______.
选项
答案
International Olympic Committee(IOC)
解析
(文章第四段提到The need for an overhaul came after the IOC criticised London’s“obsolete”public transport systems in a report,在一次报道中IOC批评了伦敦的交通系统,IOC是International Olympic Committee的缩写。)
转载请注明原文地址:https://tihaiku.com/zcyy/3117345.html
相关试题推荐
Thepublicopinionwasthatthetimewasnot________fortheelectionofsucha
Thegovernment________apublicdebateonthefuturedirectionoftheofficialsp
Thissortofrudebehaviourinpublichardly________apersoninyourposition.A、
ThearchitectoftheWalkieTalkiebuildinginLondonhasadmittedthathep
My________concertwasasuccess.A、brother’slongfirstpublicB、brother’sfirst
London’spublictransportsystemisnolongerthe"sickman"butthejeweli
London’spublictransportsystemisnolongerthe"sickman"butthejeweli
London’spublictransportsystemisnolongerthe"sickman"butthejeweli
A.CasaPedroisasmall,SpanishrestaurantinNorthLondon.It’sapopular
A.CasaPedroisasmall,SpanishrestaurantinNorthLondon.It’sapopular
随机试题
[originaltext]W:YouhadmetProfessorJohnsonbefore,right?Howwouldyoudes
WhyWeAreTouchedByTheSoundofMusicFromsimplefolk
Hiswifehastoworkhardathome,andperhapsoutsidethehome______.A、asyetB
患者,女性,16岁。发热、食欲减退1周,神志欠清1天;体格检查:皮肤、巩膜黄染,
衡量有效通气量的重要指标是A:残气量 B:肺总容量 C:肺活量 D:潮气量
由于身体太重,狗熊抬起左前脚迈步时,前半边身子就会歪向左边,挽脚的时候,身体又会
某单层钢结构厂房,钢材均为Q2358。边列单阶柱截面及内力见图3-1,上段柱为焊
下列哪些物质既是糖氧化分解的中间产物或产物又是糖异生的原料A.丙酮酸 B.乳酸
公开市场短期流动性调节工具以()天期以内短期逆回购或正回购为主。A.1
编制施工管理任务分工表,涉及到的事项有:①确定工作部门或个人的工作任务;②项目管
最新回复
(
0
)