To: Robert Williams, School of ArchitectureFrom: James. JohnsonSubject: Air-co
To: Robert Williams, School of ArchitectureFrom: James. JohnsonSubject: Air-co
游客
2023-09-27
43
管理
问题
To: Robert Williams, School of Architecture
From: James. Johnson
Subject: Air-conditioning Installation Costs for East Hall
Date: June 4, 2006
I am writing to inform you of the costs of installing air-conditioning for the seven offices and two studio classrooms in East Hall.
Office and Classroom Installation
Estimates were obtained from three contractors on the costs of covering the offices and classrooms. All these three were in the $20,000 to $25,000 range. The work would take about three weeks.
Because the central unit would be installed on the roof, some noise problems might occur during a four-or five-day period. And this work could be started from this weekend, and the overtime labor costs of about $1,500 have been included in the estimates.
Additional Installation
Because a larger installation, including a more powerful central unit, would he necessary to handle the halls and stairways, an additional $6,000 would be required for the equipment. If this additional work were delayed until a later time, a new central unit would be required along with changes in the pipe way.
Subject: (46) Costs for East Hall
Office and Classroom Installation
1. Covering area: seven offices and two (47)
2: Possible problem: some (48) might occur during a four- or five-day period
Additional Installation:
1. Budget: $6,000
2. A more powerful (49) is needed to handle the halls and stairways
3. Additional installation postponement will result in changes in (50)
[br]
选项
答案
noise problems
解析
转载请注明原文地址:https://tihaiku.com/zcyy/3049875.html
相关试题推荐
MostAmericanstudentsare______tospend180daysayearatschool.A、intendedB、
Thiskindofair-conditioningsystemispracticalandeconomicalfortheneedso
IshouldsaythatteachingEnglishinChinaisarealjob,andtheschools【B1
IshouldsaythatteachingEnglishinChinaisarealjob,andtheschools【B1
To:RobertWilliams,SchoolofArchitectureFrom:James.JohnsonSubjec
Theyfinallymadea_______tobuildanewschoolinthatarea.(decide)decision不定
Thereisno_______ingoingtoschoolforthestudentsmerelytolearnsomefacts
[originaltext]IsthatMr.RobertLee?[/originaltext][originaltext]MerryChrist
[originaltext]IsthatMr.RobertLee?[/originaltext][originaltext]Howmuchis
[originaltext]IsthatMr.RobertLee?[/originaltext][originaltext]Thankyoufo
随机试题
Agreatmanycitiesareexperiencingdifficultieswhicharenothingnewint
Howbigisthecirculationofthepaperthemanworkfor?[br][originaltext]W:
Exactlywhatapublicforestisandhowthepublicshouldbeabletouseit
在可行性研究阶段的投资估算中,建筑工程费用估算一般采用( )。A.单位实物工程
—个完整的足球接球动作,一般包括四个技术环节,其顺序是()。A.接球前的
建设单位应按照有关建设工程法律法规的规定和强制性标准的要求,办理各种有关安全环境
焊接工艺评定资料和《焊接工艺指导书》的管理要求有()。A、企业应明确各项评定的适
对发布证券研究报告业务和证券投资顾问业务的监管措施包括( )。 ①责令改正
A.生产国家食品药品监督管理总局已批准上市的已有国家标准的药品的注册申请B.境外
《物业管理条例》颁布前,这一阶段的物业管理政策法规的主要特点是()A:配套性
最新回复
(
0
)