首页
登录
职称英语
[originaltext] The world’s first completely automatic railway has been built
[originaltext] The world’s first completely automatic railway has been built
游客
2023-08-27
70
管理
问题
The world’s first completely automatic railway has been built under the busy streets of London. The railway is called the Victoria Line, and it is part of the complete London underground railway. The new Victoria Line was opened in 1969. This new line was very different from the others. The stations on the other lines need a lot of workers to sell tickets, and to check and to collect them when people leave the trains. This is all different on the Victoria Line. Here a machine checks and collects the tickets, and there are no workers on the platforms. On the train, there is only one worker. If necessary, this man can drive the train. But usually he just starts it; it runs and stops by itself. The trains are controlled by electrical signals which are sent by the so-called "command spots". The command spots are the same distance apart. Each sends a certain signal. The train always moves at the speed that the command spots allow. If the command spot sends no signals, the train will stop. Most of the control work is done by computers. The computers also fix the train’s speeds, and send the signals to the command spots. Other machines make sure that the trains are always a safe distance apart. One train may stay too long at a station; the other trains will then automatically move slower. So there is no danger of accidents on the line.
22. What happened to the London underground railway over four decades ago?
23. Who checks and collects the tickets on the Victoria Line?
24. What is the task of the one worker on the Victoria Line train?
25. What will happen on the line if each train moves at its own speed?
选项
A、There will be danger of accidents on the line.
B、The train will run off the rails.
C、Their speeds will be automatically fixed by the computers.
D、The train will keep a safe distance from each other.
答案
A
解析
推理判断题。短文指出会有机器设定火车的速度,使其保持安全距离,这样就不会有碰撞的危险。由此可知,如果每列火车都按自己的速度任意行驶,不互相照应,就会有发生事故的危险。
转载请注明原文地址:https://tihaiku.com/zcyy/2961043.html
相关试题推荐
[originaltext]Mr.Stevensonwastheownerofageneralappliancestore.He
[originaltext]Mr.Stevensonwastheownerofageneralappliancestore.He
[originaltext]Americanslearnsportsaspartoftheireducation.Theylearn
[originaltext]Americanslearnsportsaspartoftheireducation.Theylearn
[originaltext]Somedesertanimalscansurvivetheverystrongsummerheata
[originaltext]W:Whatdidyouthinkaboutthemovie?M:Well...IthinkHarryP
[originaltext]M:First,Iwanttothankyouforagreeingtothissurvey.Thisi
[originaltext]M:First,Iwanttothankyouforagreeingtothissurvey.Thisi
[originaltext]M:Doyouknowwhetherourhealthinsurancecoversexpensesford
[originaltext]M:Doyouknowwhetherourhealthinsurancecoversexpensesford
随机试题
Thesimpleactofsurrenderingatelephonenumbertoastoreclerkmaynots
Tofindoutwhattheweatherisgoingtobe,mostpeople【B1】______theradio,
A.随访5年尚存活的病例数÷随访5年的总病例数×100% B.对照组的死亡(发
A.2.2倍 B.1.7倍 C.22倍 D.17倍 E.1.3倍卵圆窗所
下列关于金融效率和金融安全的关系表述错误的是()。A.金融效率和金融安全互斥
男,18岁,高三学生。既往学习成绩一贯优良,品德良好。据父母反映该生近半年来,可
A.氨基醚类组胺H受体拮抗剂 B.乙二胺类组胺H受体拮抗剂 C.哌嗪类组胺H
2020年全国农民工总量28560万人,比上年减少517万人。其中,外出农民工1
甲公司为股份有限公司,2×19年到2×20年发生如下交易或事项: (1)2×1
业主在工程项目施工图设计完成后再进行施工招投标,这种任务的委托方式属于()。A.
最新回复
(
0
)